Development and reconstruction of the system for the collection, collection and treatment of rainwater and mites, including the construction of water retention basins in Sierakowice (Q122512): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed an Item) |
||
Property / fund | |||
Property / fund: European Regional Development Fund / rank | |||
Normal rank |
Revision as of 13:50, 7 June 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Development and reconstruction of the system for the collection, collection and treatment of rainwater and mites, including the construction of water retention basins in Sierakowice |
Project in Poland financed by DG Regio |
Statements
4,413,406.23 zloty
0 references
6,304,866.04 zloty
0 references
1,513,167.8495999998 Euro
0.24 Euro
13 January 2020
0 references
70.0 percent
0 references
8 January 2018
0 references
30 September 2019
0 references
GMINA SIERAKOWICE
0 references
Projekt będzie realizowany w m. Sierakowice (gm. Sierakowice), w powiecie kartuskim, woj. pomorskim. Zakres inwestycji w obrębie ul.: Lęborskiej, Legionów, Dworcowej, Ks. B. Łosińskiego (teren Ołtarza Papieskiego) obejmuje przebudowę i budowę sieci kan. deszczowej o łącznej dł. 2 029,30 m z uzbrojeniem: osadniki wirowe jednokomorowe (2kpl.) oraz separator koalescencyjny w komorze (2kpl.), 2 zbiorniki retencyjne o poj.: 3 300 m3 i 9 100 m3, a także budowę i przebudowę kolektora kan. deszczowej w obszarze kolejowym i gruncie Skarbu Państwa o łącznej dł. 183,5 m. Retencyjność kolektora na terenie Ołtarza Papieskiego - 788 m3. Celem projektu jest wzmocnienie odporności Sierakowic na zagrożenia naturalne, takie jak powódź, czy susze. Wskaźniki produktu: Poj. obiektów małej retencji - 13 188m3 Dł. wybudowanej sieci kan. deszczowej - 0,72km Dł. przebudowanej sieci kan. deszczowej - 1,48km Wskaźnik rezultatu: Liczba ludności odnoszącej korzyści ze środków ochrony przeciwpowodziowej - 2 227os. (Polish)
0 references
The project will be implemented in (m. Sierakowice), county district, Pomorskie province. Extent of investment within the area: Lęborska, Legionella, stations, Kons B. Łosian (the forest area of Papian) consists of the reconstruction and construction of a rainwater system with a total length. 2 029.30 m with weapons: single-chamber rotor tanks (2kpl.) and a chamber separator for the chamber (2kpl.), 2 holding tanks: 3 300 m³ and 9 100 m³ as well as the construction and conversion of the sewer of the storm in the area of rail and the land of the State Treasury with a total length of time 183.5 m. the storage of the collectors on the land of the altar Pearski — 788 m³. The project aims to strengthen the resilience of Sierowice to natural hazards such as flooding or drought. Product indicators: In the case of small retention facilities — 13 188 m³. the length of the storm water network built — 0.72 km long distance of the reclaimed storm water network — 1.48 km indicator result indicator: Population benefiting from flood protection measures — 2 227os. (English)
0 references
Identifiers
RPPM.11.01.00-22-0012/16
0 references