Construction of a solar photovoltaic installation for the company Forma Studio Fitness in Szczecin (Q137695): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed an Item)
Property / fund
 
Property / fund: European Regional Development Fund / rank
 
Normal rank

Revision as of 13:21, 7 June 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of a solar photovoltaic installation for the company Forma Studio Fitness in Szczecin
Project in Poland financed by DG Regio

    Statements

    0 references
    213,307.5 zloty
    0 references
    51,193.799999999996 Euro
    13 January 2020
    0 references
    321,583.5 zloty
    0 references
    77,180.04 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    16 May 2016
    0 references
    30 November 2017
    0 references
    FORMA STUDIO FITNESS BOGUSŁAW ORLIŃSKI
    0 references
    Projekt ma charakter stacjonarny i będzie realizowany w Szczecinie,przy ulicy Szafera 194,196.Inwestycja polega na montażu instalacji fotowoltaicznej o mocy 39,76 kW wraz z infrastrukturą towarzyszącą na dachu wieżowca użyczonym Wnioskodawcy przez Wspólnotę Mieszkaniową.Energia elektryczna w postaci prądu stałego produkowana przez ogniwa fotowoltaiczne będzie przekształcana przez falowniki na prąd zmienny o napięciu 400V, a następnie za pomocą sieci transformatorowej do sieci elektroenergetycznej Wnioskodawcy.Powierzchnia zabudowy wyniesie-232,14m2. Aby osiągnąć założone rezultaty przewidziano następujące ETAPY WDRAŻANIA PROJEKTU:1. Przygotowanie dokumentacji projektu oraz opracowanie studium wykonalności (projekt nie wymaga zezwoleń, pozwoleń, ani decyzji) (II kw.2016) 2.Budowa instalacji fotowoltaicznej – prace budowlano-instalacyjne: montaż instalacji fotowoltaicznej w postaci 142 paneli fotowoltaicznych,inwertera,konstrukcji montażowej,okablowania DC i AC,rozdzielnicy i zabezpieczenia DC do poszycia dachu,podłączenie do sieci,uruchomienie instalacji (II kw.2017r.,3. Usługi zarządzania i nadzoru nad projektem (II kw.2017r.) Za realizację projektu odpowiedzialny będzie właściciel firmy Forma Studio Fitness Bogusław Orliński oraz zatrudniony inżynier kontraktu. (Polish)
    0 references
    The project is of a stationary nature and will be carried out in Szczecin, at street Szafera 194,196.Investment is the installation of a 39.76 kW photovoltaic installation together with the associated infrastructure on the roof of the tower used by the Community of the residents. the electricity in the form of the electricity produced by the solar cells will be transformed by a wave into the 400V AC, and then through a transformer network into the Applicant’s power grid. the area of the installation will be transferred to 232.14 m². In order to achieve the results, the following ETAPAN IMPLEMENTATION OF THE PROJECT is foreseen: 1. The preparation of the project documentation and the development of a feasibility study (the project does not require any permit, permit or decision) (II k.2016) 2.Construction of a photovoltaic installation — construction and installation works: installation of a photovoltaic installation in the form of 142 solar panels, inverter, assembly structure, DC and AC cables, distribution and security of DC systems for the roof panel, connection to the net, installation of the installation (second kw.2017., 3. Project Management and Oversight Services (IIk.2017.) For the implementation of the project, the owner of the company Forma Studio Fitness Bogusław Orliński and an employed contract engineer will be responsible. (English)
    0 references

    Identifiers

    RPZP.02.10.00-32-A054/16
    0 references