Modernisation of urban lighting in Szczecinek, in the direction of its energy efficiency (Q137587): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed an Item)
Property / fund
 
Property / fund: European Regional Development Fund / rank
 
Normal rank

Revision as of 13:18, 7 June 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Modernisation of urban lighting in Szczecinek, in the direction of its energy efficiency
Project in Poland financed by DG Regio

    Statements

    0 references
    2,064,213.4 zloty
    0 references
    495,411.21599999996 Euro
    13 January 2020
    0 references
    2,517,568.06 zloty
    0 references
    604,216.3343999999 Euro
    13 January 2020
    0 references
    82.05 percent
    0 references
    4 May 2017
    0 references
    31 July 2018
    0 references
    MIASTO SZCZECINEK
    0 references
    Projekt polega na zastosowaniu energooszczędnych rozwiązań oświetlenia pozwalających na radykalne obniżenie mocy zainstalowanych urządzeń przy jednoczesnej poprawie jakości i standardu oświetlenia mającego znaczący wpływ na bezpieczeństwo ruchu kołowego i pieszego Wytypowane do modernizacji punkty świetlne wraz ze słupami (bez zmiany lokalizacji latarń) zastąpią obecne oprawy sodowe Przestarzała konstrukcja opraw oraz jakość zastosowanych do ich budowy materiałów znacznie odbiega od obecnie stosowanych rozwiązań Zakres projektu obejmuje powyżej 25% udziału punktów świetlnych objętych modernizacją w stosunku do wszystkich punktów stanowiących majątek oświetlenia drogowego będącego w eksploatacji Miasta Szczecinek tj 734 z 2760. W ramach projektu niezbędne rodzaje czynności do realizacji inwestycji to: Zadanie 1 – Opracowanie dokumentacji projektowej niezbędnej do przeprowadzenia inwestycji wraz z kosztorysem inwestorskim Zadanie 2 – Opracowanie Studium Wykonalności inwestycji wraz z wnioskiem o dofinansowanie Zadanie 3 – Roboty budowlano-montażowe związane z rzeczową realizacją inwestycji w tym zakup opraw słupów i wysięgników związanych z realizacją inwestycji Roboty budowlano-montażowe Pozostałe prace związane z poprawnym wykonaniem inwestycji to Zadanie 4 – Nadzór inwestorski Zadanie 5 – Działania promocyjne związane z realizacją projektu i wdrożeniem jego efektów. Zmodernizowane oświetlenie będzie spełniało wymiana normy PN-EN 13201:2007 Stanowi ona obecnie wymagania dotyczące oświetlenia dróg i ulic W związku z powyższym projekt będzie charakteryzował się spełnieniem wymogów wynikających z obowiązujących europejskich i polskich norm i przepisów ochrony środowiska a także pośrednio zmniejszeniem zagrożeń dla zdrowia ludzkiego Planowana inwestycja przyczyni się do zaoszczędzenia energii elektrycznej oraz ograniczenia emisji CO2 innych zanieczyszczeń wpisując się jednocześnie w priorytety UE w zakresie działań adaptacyjnych łagodzących zmiany klimatu. (Polish)
    0 references
    The project consists of the use of energy-saving lighting solutions which will drastically reduce the installed capacity of equipment while improving the quality and standard of lighting, with a significant impact on road safety and pedestrian safety, which will have a significant impact on road safety and pedestrian safety that are identified to upgrade the light points along with the poles (without changing the location of the lights), replace the current binding sodium frames and the quality of the materials used for their construction considerably deviates from the current solutions. the scope of the design includes more than 25 % of the proportion of lighting points being modernised in relation to all the points of the road lighting property of Szczecinek, 734 of 2760. Within the project, the necessary types of action to implement the investment are: Activity 1 — Development of the project documentation necessary to carry out the investment, together with the project’s financial statement 2 — Development of a feasibility study for investment with a request for financial compensation of 3 — Construction and installation studies linked to the tangible implementation of the investment, including the purchase of building blocks and booms linked to the construction of investments in construction and assembly works, Other work related to the improvement of investment projects is Zadanie 4 — Investment investment by Zadanie 5 — Promotion of project implementation and implementation of the project. The modernised lighting will be in line with the exchange of standard PN-EN 13201: 2007. it now requires road and street lighting requirements. the project will therefore be characterised by compliance with the requirements of existing European and Polish environmental standards and regulations and, indirectly, by reducing the risks to human health, the planned investment will contribute to saving electricity and reducing CO2 emissions of other pollutants while at the same time entering into the EU priorities for climate change adaptation. (English)
    0 references

    Identifiers

    RPZP.02.04.00-32-0001/16
    0 references