ENERGY RENOVATION OF THE BUILDING AND USE OF RES IN MARPOL (Q105131): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed an Item) |
||
Property / fund | |||
Property / fund: European Regional Development Fund / rank | |||
Normal rank |
Revision as of 12:55, 7 June 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | ENERGY RENOVATION OF THE BUILDING AND USE OF RES IN MARPOL |
Project in Poland financed by DG Regio |
Statements
142,576.98 zloty
0 references
368,332.12 zloty
0 references
65.0 percent
0 references
2 May 2019
0 references
30 November 2019
0 references
KUDŁO JERZY "MARPOL"
0 references
W ramach wskazanego wariantu przedsięwzięcia termomodernizacyjnego wykonane zostaną następujące prace: - wymiana instalacji c.o. : zastosowanie termozaworów grzejnikowych o czułości 1°K z możliwością zdalnego sterowania nastawami , montaż nowych grzejników , wymiana źródła ciepła z pieca węglowego na kocioł opalany biomasa o mocy ok 25 kW . Instalacja zostanie wyposażona w ciepłomierz a kocioł w programator harmonogramu pracy. - wymiana oświetlenia na oprawy LED - ok 11 szt - wykonanie instalacji fotowoltaicznej o mocy 10 kW i powierzchni absorbera co najmniej 66 m2 - ocieplenie ścian styropianem o współ.?=0,032 i grubości 15 cm . Do wykonania ok 100,92 m2. - docieplenie ścian ocieplonych styropianem EPS 70 40 grubości 10 cm styropianem o współ.?=0,032 i grubości 5 cm . Do wykonania ok 95,93 m2. - ocieplenie stropodachu płytą warstwową z rdzeniem PUR lub PIR o współ.?=0,025 i grubości 16 cm . Do wykonania ok 417,82 m2. - modernizacja instalacji c.w.u. - włączenie nowego zasobnika c.w.u. o poj 100 l do z kotła na biomasę . Zasobnik będzie wyposażony w grzałkę elektryczną zasilaną z instalacji fotowoltaicznej po sezonie grzewczym. Zamontowanie licznika ciepła na wyjściu z zasobnika oraz wodomierza na dopuszczeniu zimnej wody - wymiana bram na bramy segmentowe , podnoszone o współcz. U co najmniej równym 1,3 W/m2K . Do wykonania ok. 45 m2. - Zamontowanie boczkarki o mocy do 4 kW. Realizacja projektu poprzez montaż kotła na biomasę, montaż instalacji fotowolt.oraz oświetlenia energooszczęd. przyczyni się do redukcji emisji C02 do atmosfery. W wyniku osiągnięte zostaną następujące m.in. wskaźniki: - Ilość zaoszczędzonej energii cieplnej - 158,97GJ (41,26 %), - Ilość zaoszczędzonej energii elektrycznej - 108,97 GJ (30,27 MWh; 104,3 %), - Zmniejszenie zużycia energii końcowej - 267,94 GJ (54,7%), - Zmniejszenie emisji CO2 - 69542 kg/rok (100%) - Zmniejszenie emisji PM-10 - 283,85 kg/rok (97,36%) (Polish)
0 references
The following works will be carried out under this option: — the replacement of the heating system: application of thermal heating valves with a sensitivity of 1° K with the possibility of remote control, installation of new radiators, replacement of the heat source from the coal furnace with a biomass boiler of about 25 kW. The installation will be equipped with a heat meter and a boiler of the work schedule. — replacement of luminaires for approximately 11 m² for LED luminaires — implementation of a 10-kW photovoltaic installation and an absorber area of at least 66 m² — insulation of sides of the stills with joint, 0.032 cm thickness and thickness 15 cm. For about 100.92 m². — 7 040 cm thickness 10 cm in thickness and 0.032 cm thickness (5 cm). For about 95.93 m². — = 0.025 cm thick and 16 cm thick. For about 417.82 m². Upgrading of the hot-water installations — integration of a new storage tank with a capacity of 100 l to the biomass boiler. The storage tank will be equipped with a heat generator from the photovoltaic installation after the heating season. Installation of the heat meter at the exit from the reservoir and the water meter for the cold water supply — replacement of gates at the gateway to the segmental gateway, which are alleged to be part of the bridge. At least equal to 1,3 W/m2K. To be implemented around 45 m². — The installation of siding with a power of up to 4 kW. The implementation of the project by assembly of the biomass boiler, the installation of the photonometer and the lighting energy efficient lighting will contribute to the reduction of C02 emissions to the atmosphere. As a result, the following indicators will be met: — Amount of thermal energy saved — 158,97GJ (41.26 %) — Amount of saved electricity — 108,97 GJ (30.27 MWh; 104.3 %), — Reduction of final energy consumption — 267,94 GJ (54.7 %), — Reduction of CO2-69 542 kg/year (100 %) — Reduction of PM-10-283.85 kg/year (97.36 %) (English)
0 references