CONSTRUCTION OF CYCLE PATHS AND PEDESTRIAN ROUTES TO THE WEST LINK CENTRE/SOCIAL AND HEALTH EQUIPMENT TO WALLS (Q2878139): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Import item from Portugal) |
(Changed an Item) |
||||||||||||||
Property / location (string) | |||||||||||||||
Property / location (string): Águeda, União das freguesias de Águeda e Borralha / rank | |||||||||||||||
Property / coordinate location | |||||||||||||||
| |||||||||||||||
Property / coordinate location: 40°34'41.66"N, 8°24'54.68"W / rank | |||||||||||||||
Property / contained in NUTS | |||||||||||||||
Property / contained in NUTS: Região de Aveiro / rank | |||||||||||||||
Property / thematic objective | |||||||||||||||
Property / thematic objective: Low-carbon economy / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / date of last update | |||||||||||||||
23 May 2023
| |||||||||||||||
Property / date of last update: 23 May 2023 / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / location (string) | |||||||||||||||
Águeda | |||||||||||||||
Property / location (string): Águeda / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / coordinate location | |||||||||||||||
40°34'42.60"N, 8°26'37.68"W
| |||||||||||||||
Property / coordinate location: 40°34'42.60"N, 8°26'37.68"W / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / coordinate location: 40°34'42.60"N, 8°26'37.68"W / qualifier | |||||||||||||||
Property / contained in NUTS | |||||||||||||||
Property / contained in NUTS: Região de Aveiro / rank | |||||||||||||||
Normal rank |
Revision as of 18:40, 23 May 2023
Project Q2878139 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | CONSTRUCTION OF CYCLE PATHS AND PEDESTRIAN ROUTES TO THE WEST LINK CENTRE/SOCIAL AND HEALTH EQUIPMENT TO WALLS |
Project Q2878139 in Portugal |
Statements
349,897.89 Euro
0 references
411,644.57 Euro
0 references
85.0 percent
0 references
23 October 2017
0 references
31 October 2019
0 references
MUNICIPIO DE AGUEDA
0 references
Q2991135 (Deleted Item)
0 references
Reprogramação temporal, física e financeira, justificada pelas várias prorrogações de prazo concedidas, pela aprovação de 3 mapas de trabalhos adicionais, pelo saldo final da empreitada e pela existência de revisões de preços de valor positivo. (Portuguese)
0 references
Temporal, physical and financial reprogramming, justified by the various time periods granted, the approval of 3 additional work maps, the final balance of the contract and the existence of price revisions of positive value. (English)
7 July 2021
0 references
Reprogrammation temporelle, physique et financière, justifiée par les différentes prolongations de temps accordées, l’approbation de 3 cartes de travaux supplémentaires, le solde final du marché et l’existence de révisions de prix positives. (French)
4 December 2021
0 references
Zeitliche, physische und finanzielle Neuprogrammierung, gerechtfertigt durch die verschiedenen Fristenverlängerungen, die Genehmigung von drei zusätzlichen Bauplänen, die endgültige Vertragsbilanz und das Vorhandensein positiver Preisanpassungen. (German)
13 December 2021
0 references
Temporele, fysieke en financiële herprogrammering, gerechtvaardigd door de verschillende toegestane tijdsverlengingen, de goedkeuring van 3 extra werkkaarten, het eindsaldo van het contract en het bestaan van positieve prijsherzieningen. (Dutch)
18 December 2021
0 references
Riprogrammazione temporale, fisica e finanziaria, giustificata dalle diverse proroghe dei tempi concessi, dall'approvazione di 3 cartine di opere aggiuntive, dal saldo finale del contratto e dall'esistenza di revisioni positive dei prezzi. (Italian)
17 January 2022
0 references
Reprogramación temporal, física y financiera, justificada por las diversas prórrogas de tiempo concedidas, la aprobación de tres mapas de obras adicionales, el saldo final del contrato y la existencia de revisiones de precios positivas. (Spanish)
20 January 2022
0 references
Ajaline, füüsiline ja rahaline ümberplaneerimine, mida õigustavad erinevad antud ajavahemikud, kolme täiendava töökaardi heakskiitmine, lepingu lõppsaldo ja positiivse väärtusega hinnaparanduste olemasolu. (Estonian)
29 July 2022
0 references
Laikinas, fizinis ir finansinis perprogramavimas, pagrįstas įvairiais nustatytais laikotarpiais, 3 papildomų darbų žemėlapių patvirtinimu, galutiniu sutarties balansu ir teigiamos vertės kainų pataisymais. (Lithuanian)
29 July 2022
0 references
Vremensku, fizičku i financijsku reprogramiranje, opravdano različitim dodijeljenim vremenskim razdobljima, odobrenje triju dodatnih karata rada, konačni saldo ugovora i postojanje promjena cijene pozitivne vrijednosti. (Croatian)
29 July 2022
0 references
Χρονικός, φυσικός και οικονομικός αναπρογραμματισμός, που δικαιολογείται από τις διάφορες παραχωρηθείσες χρονικές περιόδους, την έγκριση 3 πρόσθετων χαρτών εργασίας, την τελική ισορροπία της σύμβασης και την ύπαρξη αναθεωρήσεων τιμών θετικής αξίας. (Greek)
29 July 2022
0 references
Časové, fyzické a finančné preprogramovanie odôvodnené rôznymi poskytnutými lehotami, schválenie troch dodatočných pracovných máp, konečná bilancia zmluvy a existencia cenových revízií kladnej hodnoty. (Slovak)
29 July 2022
0 references
Ajallinen, fyysinen ja taloudellinen uudelleenkohdentaminen, joka on perusteltua eri ajanjaksojen perusteella, kolmen ylimääräisen työkartan hyväksyminen, sopimuksen loppusaldo ja positiivisten hintatarkistusten olemassaolo. (Finnish)
29 July 2022
0 references
Czasowe, fizyczne i finansowe przeprogramowanie, uzasadnione różnymi przyznanymi terminami, zatwierdzeniem 3 dodatkowych map prac, ostateczną równowagą umowy oraz istnieniem korekt cen o wartości dodatniej. (Polish)
29 July 2022
0 references
Időbeli, fizikai és pénzügyi átprogramozás, amelyet a különböző megadott határidők, 3 további munkatérkép jóváhagyása, a szerződés végső egyenlege és a pozitív értékű ármódosítások megléte indokol. (Hungarian)
29 July 2022
0 references
Časové, fyzické a finanční změny odůvodněné různými poskytnutými lhůtami, schválením tří dodatečných pracovních map, konečným zůstatkem smlouvy a existencí revizí cen kladné hodnoty. (Czech)
29 July 2022
0 references
Laika, fiziska un finansiāla pārplānošana, ko pamato dažādie piešķirtie laikposmi, trīs papildu darba karšu apstiprināšana, līguma galīgais saldo un cenu pārskatīšana ar pozitīvu vērtību. (Latvian)
29 July 2022
0 references
Athchlárú ama, fisiceach agus airgeadais, a bhfuil údar leis i ngeall ar na tréimhsí ama éagsúla a dheonaítear, formheas 3 léarscáil oibre bhreise, iarmhéid deiridh an chonartha agus athbhreithnithe praghais ar luach deimhneach a bheith ann. (Irish)
29 July 2022
0 references
Časovno, fizično in finančno reprogramiranje, utemeljeno z različnimi dodeljenimi časovnimi obdobji, odobritev treh dodatnih delovnih zemljevidov, končno stanje pogodbe in obstoj sprememb cen pozitivne vrednosti. (Slovenian)
29 July 2022
0 references
Времево, физическо и финансово препрограмиране, обосновано от различните предоставени срокове, одобрението на 3 допълнителни работни карти, окончателното салдо по договора и наличието на ревизии на цените с положителна стойност. (Bulgarian)
29 July 2022
0 references
Riprogrammazzjoni temporali, fiżika u finanzjarja, ġustifikata mid-diversi perjodi ta’ żmien mogħtija, l-approvazzjoni ta’ 3 mapep ta’ ħidma addizzjonali, il-bilanċ finali tal-kuntratt u l-eżistenza ta’ reviżjonijiet tal-prezzijiet ta’ valur pożittiv. (Maltese)
29 July 2022
0 references
Tidsmæssig, fysisk og finansiel omprogrammering, der er begrundet i de forskellige tildelte frister, godkendelsen af tre supplerende arbejdskort, kontraktens endelige saldo og eksistensen af prisændringer af positiv værdi. (Danish)
29 July 2022
0 references
Reprogramarea temporală, fizică și financiară, justificată de diferitele perioade acordate, aprobarea a 3 hărți de lucru suplimentare, soldul final al contractului și existența unor revizuiri de preț cu valoare pozitivă. (Romanian)
29 July 2022
0 references
Tidsmässig, fysisk och finansiell omfördelning, som motiveras av de olika tidsperioder som beviljats, godkännandet av ytterligare tre arbetskartor, slutsaldot för kontraktet och förekomsten av prisjusteringar av positivt värde. (Swedish)
29 July 2022
0 references
23 May 2023
0 references
Águeda
0 references
Identifiers
CENTRO-09-1406-FEDER-000011
0 references