Management of recreational areas over the lagoon (Q102184): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed an Item)
Property / fund
 
Property / fund: European Regional Development Fund / rank
 
Normal rank

Revision as of 11:42, 7 June 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Management of recreational areas over the lagoon
Project in Poland financed by DG Regio

    Statements

    0 references
    1,007,805.24 zloty
    0 references
    241,873.25759999998 Euro
    13 January 2020
    0 references
    1,706,773.52 zloty
    0 references
    409,625.6448 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    27 June 2016
    0 references
    30 March 2018
    0 references
    GMINA MIASTO GŁOWNO
    0 references

    51°57'44.6"N, 19°42'42.1"E
    0 references
    PROJEKT REALIZOWANY JEST NA TERENIE WOJEWÓDZTWA ŁÓDZKIEGO W MIEŚCIE GŁOWNO. SWOIM ZASIĘGIEM OBEJMUJE ZAGOSPODAROWANIE TERENU WOKÓŁ ZBIORNIKA MROŻYCZKA. PROJEKT OBEJMUJE: • BUDOWĘ PŁYWAJĄCEGO MOLA REKREACYJNEGO Z PLATFORMĄ WIDOKOWĄ • BUDOWA DWÓCH PŁYWAJĄCYCH POMOSTÓW CUMOWNICZYCH, • BUDOWA PARKU LINOWEGO W LASKU PRZY ZALEWIE „MROŻYCZKA”, • ZAKUP ROWERÓW WODNYCH RÓŻNEGO TYPU (DELFIN, ŁABĘDŹ, SAMOCHÓD), • MONTAŻ ALTANY TANECZNO-KONCERTOWEJ, • MONTAŻ TRZECH STANOWISK PIKNIKOWYCH, • MONTAŻ DWÓCH STANOWISK DO GRILLOWANIA, • WYKONANIE ŚCIEŻKI EDUKACYJNEJ DLA DZIECI Z SZEŚCIOMA TABLICAMI EDUKACYJNYMI, • MONTAŻ ŁAWEK, KOSZY NA ŚMIECI I STOJAKÓW ROWEROWYCH, • DEMONTAŻ URZĄDZEŃ ISTNIEJĄCEGO PLACU ZABAW I MONTAŻ NOWYCH URZĄDZEŃ. • ZAKUP KONSTRUKCJI DMUCHANYCH DO PARKU WODNEGO DODATKOWO W RAMACH PROJEKTU PRZEWIDZIANO NASTĘPUJĄCE ZADANIA: • OPRACOWANIE DOKUMENTACJI TECHNICZNEJ, • OPRACOWANIE STUDIUM WYKONALNOŚCI (KOSZT NIEKWALIFIKOWALNY), • PROMOCJA PROJEKTU (TABLICE INFORMACYJNE/PAMIĄTKOWE, OZNAKOWANIE ZAKUPIONEGO SPRZĘTU, OGŁOSZENIE PRASOWE), • NADZÓR INWESTORSKI. BEN.KOŃCOWYM I INW. JEST GM GŁOWNO, Z SIEDZIBĄ W UM W GŁOWNIE, UL. MŁYNARSKA 15, 95-015 GŁOWNO. GM GŁOWNO JEST JEDYNYM PODMIOTEM ZAANGAŻOWANYM W REALIZACJĘ PROJEKTU NA KAŻDYM ETAPIE. M. GŁOWNO JEST INWESTOREM I BĘDZIE PEŁNIĆ FUNKCJĘ ZAMAWIAJĄCEGO. BEN.POŚREDNIMI PROJEKTU SĄ MIESZKAŃCY MIASTA ORAZ OKOLIC. LICZBA UŻYTKOWNIKÓW NOWEJ INF.TURYSTYCZNEJ POWSTAŁEJ W RAMACH PROJEKTU PRZEKROCZY 1000 OSÓB ROCZNIE. CAŁKOWITY KOSZT KWAL.PROJEKTU WYNOSI 1 233 835,75 PLN, NIE JEST TO DUŻY PROJEKT W ROZUMIENIU ART. 100 ROZPORZĄDZENIA NR 1303/2013. W PROJEKCIE NIE WYSTĘPUJE GENEROWANIE DOCHODU. ZAPLANOWANE DZIAŁANIA MAJĄ POPRAWIĆ DOSTĘPNOŚĆ OBIEKTÓW I ATRAKCJI TUR. DLA WSZ. POT. UŻYTKOWNIKÓW BEZ POT. ADAP. ANI WPROWADZANIA DODATKOWYCH ROZWIĄZAŃ DLA OSÓB Z GRUP WYKLUCZONYCH. W PROJEKCIE ZASTOSOWANO KON. PROJ. UNIWERSALNEGO ZGODNIE Z WYT. W ZAKRESIE REALIZACJI ZASADY RÓWNOŚCI SZANS I NIEDYSKRYMINACJI. (Polish)
    0 references
    THE PROJECT IS BEING CARRIED OUT IN THE ŁÓDZKIE REGION IN THE TOWN OF GŁOWNO. IT COVERS THE DEVELOPMENT OF THE LAND AROUND THE RESERVOIR OF THE VESSEL. THE PROJECT INCLUDES: • CONSTRUCTION OF A RECREATIONAL BOAT WITH A VIEWING PLATFORM• CONSTRUCTION OF TWO FLOATING MOORING BRIDGES,• CONSTRUCTION OF A ROPE PARK IN THE LAGOON WITH AN ‘MROŻYCZKA’ LAGOON,• INSTALLATION OF A DIFFERENT TYPE OF WATER CYCLE (DELTA, SWAN, CAR),• ASSEMBLY OF ALTANY- KONCEROVA,• ASSEMBLY OF THREE PICNIC POSITIONS,• ASSEMBLY OF TWO GRILLING STATIONS,• CONSTRUCTION OF EDUCATIONAL PATHWAY FOR CHILDREN WITH SIX EDUCATIONAL TABLES,• INSTALLATION OF BENCHES, GARBAGE BINS AND BICYCLE RACKS,• DISMANTLING OF THE EXISTING PLAYGROUND EQUIPMENT AND INSTALLATION OF NEW EQUIPMENT. • THE PURCHASE OF INFLATABLE STRUCTURES FOR THE WATER PARK IN ADDITION TO THE PROJECT HAS THE FOLLOWING TASKS: • THE DEVELOPMENT OF TECHNICAL DOCUMENTATION,• THE DEVELOPMENT OF A FEASIBILITY STUDY (INELIGIBLE COST),• PROJECT PROMOTION (PLAQUE/SOUVENIR, LABELLING OF PURCHASED EQUIPMENT, PRESS RELEASE),• INVESTOR SUPERVISION. BEN.KOŃCOWYM AND INW. GM GŁOWNO, WITH ITS REGISTERED OFFICE IN THE MO IN MAIN, UL. BOLARSKA 15, 95-015 GŁOWNO. GM GŁOWNO IS THE ONLY ENTITY INVOLVED IN THE PROJECT AT EACH STAGE. MR GŁOWNO IS AN INVESTOR AND WILL PERFORM THE ROLE OF CONTRACTING AUTHORITY. THE PROJECT COVERS THE INHABITANTS OF THE CITY AND ITS SURROUNDINGS. THE NUMBER OF USERS OF THE NEW INFRASTRUCTURE GENERATED BY THE PROJECT WILL EXCEED 1000 PEOPLE PER YEAR. THE TOTAL COST OF THE PROJECT IS PLN 1 233 835,75. THIS IS NOT A MAJOR PROJECT WITHIN THE MEANING OF ARTICLE 100 OF REGULATION 1303/2013. THERE IS NO INCOME GENERATION IN THE PROJECT. PLANNED ACTIONS ARE EXPECTED TO IMPROVE THE AVAILABILITY OF FACILITIES AND ATTRACTIONS. FOR WSZ. POT. USERS WITHOUT POT. ADAP. AND INTRODUCING ADDITIONAL ARRANGEMENTS FOR THOSE OF THE EXCLUDED GROUPS. THE KON WAS USED IN THE PROJECT. PROJ. UNIVERSAL IN ACCORDANCE WITH THE EXTRACTS. ON THE IMPLEMENTATION OF THE PRINCIPLE OF EQUAL OPPORTUNITIES AND NON-DISCRIMINATION. (English)
    0 references

    Identifiers

    RPLD.06.02.01-10-0083/16
    0 references