Construction of a photovoltaic installation for the production of electricity from renewable energy sources. (Q132077): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed an Item)
Property / fund
 
Property / fund: European Regional Development Fund / rank
 
Normal rank

Revision as of 11:05, 7 June 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of a photovoltaic installation for the production of electricity from renewable energy sources.
Project in Poland financed by DG Regio

    Statements

    0 references
    226,440.0 zloty
    0 references
    54,345.6 Euro
    13 January 2020
    0 references
    327,672.0 zloty
    0 references
    78,641.28 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    28 July 2016
    0 references
    31 January 2019
    0 references
    LEGRAMET LESZEK JANECZEK
    0 references

    54°11'56.0"N, 19°26'28.0"E
    0 references
    Przedmiotem projektu jest budowa instalacji fotowoltaicznej o mocy znamionowej 39,88 kW do produkcji energii elektrycznej z odnawialnych źródeł energii – energii słonecznej, na potrzeby firmy LEGRAMET Leszek Janeczek do zasilania instalacji odbiorczych w budynku hali przemysłowej zlokalizowanym przy ul. Rybnej 15 w Elblągu. Montaż instalacji fotowoltaicznej projektuje się na dachu budynku skierowanym w kierunku południowym pod katem 25°. Inwestycja realizowana będzie na terenie działki ew. nr 1/26 obręb 0021 znajdującej się w miejscowości Elbląg, gmina Elbląg, której Wnioskodawca jest właścicielem na podstawie Aktu Notarialnego Rep. A nr 7054/2006 z dnia 28.11.2006 r. Powierzchnia użytkowa budynku wynosi 1570,5 m2. budynek parterowy, niepodpiwniczony z płaskim, dwuspadowym dachem krytym papą. Obiekt o żelbetonowej, prefabrykowanej konstrukcji nośnej. W budynku znajduje się oprócz pomieszczeń handlowych część usługowa i magazynowa oraz garaż. Zgodnie z projektem budowlanym dla uzyskania optymalnej ilości wyprodukowanej energii elektrycznej na potrzeby przedsiębiorstwa niezbędna jest realizacja projektu obejmującego następujące etapy realizacji: Etapy realizacji: 1.Opracowanie dokumentacji technicznej 2.Zakup i montaż infrastruktury technicznej 3.Zakup i montaż instalacji fotowoltaicznej Projekt wpisuję się w zał. określone w SZOP RPO WiM 2014-2020 z uwagi na wspierani i wytwarzanie odnawialnych źródeł energii w ogólnym bilansie energetycznym regionu Warmii i Mazur. (Polish)
    0 references
    The project consists of the construction of a PV power plant with a rated power output of 39.88 kW for the production of electricity from renewable energy sources, solar energy, for the purpose of LEGRAMET, for the supply of the reception facilities in the industrial hall building located at ul. Fish 15 in Elbląg. The installation of the photovoltaic installation shall be designed on the roof of the building facing southern direction at 25°. The investment will be carried out on plot No 1/26 of the 0021th area situated in Elbląg, the municipality of Elbląg, which is owned by the Applicant on the basis of the Notarial Act Rep. and No 7054/2006 of 28.11.2006. the building’s usable area is 1 570.5 m². the park building, which is not podpiwek with a flat, a two-succession roof covered by a packed bed. Ready-mixed concrete facility. In addition to the commercial premises, the building is part of a service and a storage part and a garage. In accordance with the construction project, a project must be carried out in order to obtain an optimal quantity of the electricity produced for the company, which includes the following stages of implementation: Implementation steps: 1.Preparation of technical documentation 2.Purchase and installation of the technical infrastructure 3.Purchase and installation of a photovoltaic installation and installation of a photovoltaic installation are listed in the Annex set out in the noise schedule of the ROP WiM 2014-2020, in view of the support and production of renewable energy sources in the overall energy balance of the Warmia and Mazury region. (English)
    0 references

    Identifiers

    RPWM.04.01.00-28-0511/16
    0 references