Construction of a sewerage network in Opole Lubelskie municipality — stage II (Q85385): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed an Item)
Property / fund
 
Property / fund: Cohesion Fund / rank
 
Normal rank

Revision as of 10:44, 7 June 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of a sewerage network in Opole Lubelskie municipality — stage II
Project in Poland financed by DG Regio

    Statements

    0 references
    3,124,788.71 zloty
    0 references
    749,949.2903999999 Euro
    13 January 2020
    0 references
    6,414,567.05 zloty
    0 references
    1,539,496.092 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    10 March 2015
    0 references
    30 June 2019
    0 references
    GMINA OPOLE LUBELSKIE
    0 references
    0 references

    51°8'51.0"N, 21°57'59.0"E
    0 references
    W ramach projektu wykonany zostanie II etap budowy sieci kanalizacyjnej w ramach którego do nowo wybudowanej kanalizacji (9,8 km) podłączone zostaną 774 osoby, ponadto: wykonanie kanalizacji deszczowej o dł. 376,5 m w ul. Popijarskiej, zakup wozu asenizacyjnego oraz modernizacja oczyszczalni ścieków z zastosowaniem OZE polegająca na wykonaniu: kraty mechanicznej z kontenerem, pompy 5 sztuk, mieszadła do komory tlenowej i beztlenowej – 2 sztuki, lampa hybrydowa OZE – 1 szt. Wybrane do realizacji odcinki sieci kanalizacyjnej są zgodne zakresem sieci kwalifikowanych opisanymi w SzOOP. Wszystkie elementy sieci zlokalizowane są na terenie aglomeracji powyżej 10 000 RLM. Projekt dotyczy wyłącznie budowy sieci kanalizacyjnej, nie uwzględnia elementów związanych z zaopatrzeniem mieszkańców w wodę. (Polish)
    0 references
    The project will implement the second phase of the construction of a sewerage network in which 774 persons will be connected to the newly built sewage system (9.8 km), in addition to the following:performance of the rainwater drainage system with the length of the376.5 m in ul.Popinijarska, purchase of slurry tanker and modernisation of a waste water treatment plant using renewable energy sources, by means of:mechanical cracker with container, pump 5, stirrers for aerobic and anaerobic chamber — 2 units, hybrid RES lamp — 1 pcs.The sections of the sewerage network selected for the implementation of the sewerage network are in line with the scope of the eligible networks described in the OOP.All network elements are located in agglomerations above 10 000 p.e.The project only concerns the construction of the sewerage network, does not take into account elements related to the supply of water to the residents. (English)
    0 references

    Identifiers

    POIS.02.03.00-00-0133/16
    0 references