Construction of a wastewater treatment plant in Poznan Province with the construction of a sewage system in Wiśniowa i Poznańicz Dolne (Q112710): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed an Item)
Property / fund
 
Property / fund: European Regional Development Fund / rank
 
Normal rank

Revision as of 09:48, 7 June 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of a wastewater treatment plant in Poznan Province with the construction of a sewage system in Wiśniowa i Poznańicz Dolne
Project in Poland financed by DG Regio

    Statements

    0 references
    10,114,667.18 zloty
    0 references
    2,427,520.1232 Euro
    13 January 2020
    0 references
    24,618,406.49 zloty
    0 references
    5,908,417.557599999 Euro
    13 January 2020
    0 references
    52.8 percent
    0 references
    2 May 2018
    0 references
    31 December 2020
    0 references
    GMINA WIŚNIOWA
    0 references
    Przedmiotem projektu jest budowa sieci kanalizacji grawitacyjnej i ciśnieniowej na terenie miejscowości Wiśniowa i Poznachowice Dolne oraz budowa nowej oczyszczalni ścieków na terenie miejscowości Poznachowice Dolne.Inwestycja w zakresie sieci kanalizacyjnej zostanie wykonana na terenie miejscowości Wiśniowa i Poznachowice Dolne na obszarach dotąd nieskanalizowanych i znajdujących się w obszarze aglomeracji Wiśniowa. Podstawowe parametry i założenia budowanej sieci: podstawową formą dla terenów o zabudowie zwartej i skupionej będzie zbiorcza kanalizacja grawitacyjna zrealizowana jako trzy główne kolektory kanalizacji sanitarnej dla potrzeb przekroczenia cieku wodnego pn. Krzyworzeka wykonane zostaną przewierty rurą ciśnieniową oraz lokalne przepompownie P1; P2; P3Sieć kanalizacyjna pracować będzie w układzie grawitacyjnotłocznym. Układ sieci dostosowano do istniejącego przebiegu dróg. Planowana długość kanalizacji grawitacyjnej to ok. 14,933 km łącznie z przykanalikami, kanały tłoczne o dł. ok. 0,187 km. Łączna długość sieci kanalizacyjnej to ok. 15,12 km.Ścieki z projektowanej sieci kanalizacyjnej będą prowadzone do nowo budowanej mechanicznobiologicznej oczyszczalni, która zgodnie z założeniami projektowymi będzie spełnia wymagania wynikające z przepisów prawa w zakresie oczyszczania ścieków komunalnych. W szczególności oczyszczalnia będzie spełniać wymagania Dyrektywy Rady 91271EWG z dnia 21 maja 1991 r. dotyczącej oczyszczania ścieków komunalnych Dz. U. L 13540 z 30.5.1991 oraz Rozporządzenia Ministra Środowiska z dnia 18 listopada 2014 r. w sprawie warunków, jakie należy spełnić przy wprowadzaniu ścieków do wód lub ziemi, oraz w sprawie substancji szczególnie szkodliwych dla środowiskawodnego Dz. U. 2014 poz. 1800 dla RLM w zakresie 2.000 9 999 tj. MINIMALNE poziomy oczyszczania osiągną:ChZT125 mg O2l 87,2BZT525 mg O2l 95ZO 35mg O2l 92,4Ciąg dalszy informacji w punkcie Q. (Polish)
    0 references
    The project concerns the construction of a gravity and pressure sewerage network in the village of Wiśniowa i Poznańowice-Dolne and the construction of a new sewage treatment plant in the city of Poznańachowice Dolna. the sewerage network will be developed in the area of Wiśniowa and Poznańachowice Dolne in the areas not yet analysed and located in the area of Wiśniowa agglomeration. The basic parameters and assumptions of the constructed network are as follows: the basic form of land that is dense and concentrated will be the pooled gravity sewer built as the three main sewer collectors in order to cross the watercourse: The curves are to be pierced with a pressure tube and a local pumping station P1; P2; P3The sewage network will work in gravity. The layout of the network is aligned with the existing road. The gravity of the gravity of the sewerage system is about 14.933 km including ducts, length piston lines in the region. 0.187 km. The total length of the sewerage system is about 15,12 Km from the planned sewerage system will be transferred to a newly built mechanical internal treatment plant which, in accordance with the design of the sewage system, will meet the requirements of the legislation on urban waste water treatment. In particular, the plant will comply with the requirements of Council Directive 91271/EEC of 21 May 1991 concerning urban waste water treatment OJ L 13540 of 30.5.1991 and the Regulation of the Minister for the Environment of 18 November 2014 on the conditions to be met when discharging waste water to waters or soil and on substances particularly harmful to the environmentalist Journal of Laws 2014, item 1800 for p.e. in the range of 2.000 9 999, i.e. The minimum levels of treatment will be: CHZT125 mg O2l 87,2BZT525 mg O2zo 95zo 35 mg O2l 92,4CContinued information at point Q. (English)
    0 references

    Identifiers

    RPMP.05.03.02-12-1001/17
    0 references