Improving energy efficiency through the modification of heating systems, replacement of old furnaces, in the municipality of Kocmyrzów — Luborzyca. (Q112315): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed an Item) |
||
Property / fund | |||
Property / fund: European Regional Development Fund / rank | |||
Normal rank |
Revision as of 07:31, 7 June 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Improving energy efficiency through the modification of heating systems, replacement of old furnaces, in the municipality of Kocmyrzów — Luborzyca. |
Project in Poland financed by DG Regio |
Statements
4,429,532.44 zloty
0 references
4,496,945.68 zloty
0 references
1,079,266.9631999999 Euro
0.24 Euro
13 January 2020
0 references
98.5 percent
0 references
17 February 2017
0 references
16 February 2020
0 references
GMINA KOCMYRZÓW-LUBORZYCA
0 references
Przedmiotem projektu jest wymiana źródeł ciepła, nieekologicznych, starych kotłów na paliwa stałe na kotły gazowe lub na biomasę w indywidualnych gospodarstwach domowych w Gminie Kocmyrzów-Luborzyca. Gmina nie posiada sieci ciepłowniczej i do roku 2023 nie planuje się budowy. Projekt obejmował będzie dofinansowanie do wymiany starych pieców węglowych na piece nowej generacji na paliwa gazowe lub na biomasę. Planuje się, że w ramach projektu zmodernizowanych zostanie 195 źródeł ciepła (średni wskaźnik przyjęty szacunkowo biorąc pod uwagę wymianę pieca wraz z wykonaniem wewnętrznych instalacji w budynku, niezbędnych do prawidłowego funkcjonowania nowego systemu ogrzewania). Zgodnie z SZOOP warunkiem dostępowym wynikającym z dyrektywy dot. ekoprojektu jest redukcja CO2 co najmniej o 30 % w stosunku do istniejących instalacji. Zgodnie z warunkami, wspierane w ramach projektu będą urządzenia do ogrzewania charakteryzujące się obowiązującym od końca 2020 r. minimalnym poziomem efektywności energetycznej i normami emisji zanieczyszczeń, które zostały określone w środkach wykonawczych do dyrektywy 2009/125/WE z dnia 21 października 2009 r. ustanawiającej ogólne zasady ustalania wymogów dotyczących ekoprojektu dla produktów związanych z energią. Dla projektu minimalna redukcja CO2 w odniesieniu do istniejących instalacji będzie wynosić 78,87%. Budynki objęte projektem będą spełniać wymogi dotyczące energochłonności, zawarte w SzOOP. Wsparcie wymiany źródła ciepła będzie objęte umową z właścicielem budynku, uwarunkowane zapewnieniem odpowiedniej efektywności energetycznej, poddaniem budynku ocenie energetycznej (uproszczony audyt) oraz obowiązkiem trwałej likwidacji starego kotła i użytkowania wyłącznie kotła na który udzielono dotacji, z pouczeniem o możliwej kontroli lub weryfikacji zużycia paliwa do celów grzewczych. W ramach projektu planujemy również działania informacyjne dotyczące głównie likwidacji niskiej emisji gazów cieplarnianych i ochrony środowiska. (Polish)
0 references
The project consists of the replacement of heat sources, of non-organic heat generators, of old solid fuel boilers to natural gas boilers or to biomass in individual households in the municipality of Kocmyrzów-Luborzyca. The municipality does not have a network for district heating and no construction is planned for 2023. The project will include subsidies for the replacement of old coal furnaces for the next generation of gas-fired and/or biomass furnaces. It is planned that 195 heat generators will be modernised as part of the project (average rate estimated taking into account the replacement of the furnace and the completion of the internal installation of the building, which are necessary for the proper functioning of the new heating system). According to the SZOOP, an entry condition under the Ecodesign Directive is a reduction in CO2 of at least 30 % compared to the existing installations. Under the conditions, the project will support heating appliances with a minimum level of energy efficiency and pollutant emission standards in force since the end of 2020, as defined in the implementing measures of Directive 2009/125/EC of 21 October 2009 establishing a framework for the setting of ecodesign requirements for energy-related products. For the project, the minimum CO2 reduction for existing installations will be 78.87 %. The buildings covered by the project will meet the energy intensity requirements of the OOP. Support for the replacement of the heat source shall be subject to an agreement with the owner of the building, subject to the condition of adequate energy efficiency, the submission to the building assessment (simplified audit) and the obligation to permanently liquidate the old boiler and to use only the boiler to which the grant was awarded, with instructions for possible inspection or verification of the fuel consumption for heating purposes. The project also plans to raise awareness of low greenhouse gas emissions and environmental protection. (English)
0 references
Identifiers
RPMP.04.04.01-12-0431/17
0 references