Deep thermal modernisation of educational buildings in the municipality of Voluntary Lower Hall (Q112235): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed an Item) |
||
Property / fund | |||
Property / fund: European Regional Development Fund / rank | |||
Normal rank |
Revision as of 07:18, 7 June 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Deep thermal modernisation of educational buildings in the municipality of Voluntary Lower Hall |
Project in Poland financed by DG Regio |
Statements
383,501.98 zloty
0 references
649,160.03 zloty
0 references
60.0 percent
0 references
11 May 2016
0 references
29 December 2017
0 references
GMINA OCHOTNICA DOLNA
0 references
Przedmiot projektu/inwestycji: Przedmiotem projektu jest termomodernizacja 2 jednostek oświatowych, zlokalizowanych w 2 budynkach. - SP i Gimnazjum Jana Pawła II w Ochotnicy Dolnej- montaż kotła na pellet o mocy 200kw wraz z robotami budowlanymi w pomieszczeniu kotłowni, montaż 2695 m izolowanych rurociągów zasilających,montaż 113 sztuk grzejników wraz z głowicami termostatycznymi i zaworami powrotnymi, docieplenie stropu nad poddaszem, częściowa wymiana stolarki okiennej 18 sztuk i drzwiowej 2,58 m2. - SP im. Ks. Twardowskiego w Tylmanowej - montaż kotła na pellet o mocy 150kw wraz z robotami budowlanymi w pomieszczeniu kotłowni , montaż 49 głowic termostatycznych i 40 zaworów powrotnych, docieplenie stropu , częściowa wymiana stolarki okiennej 1,83 m2 i drzwiowej 2,27 m2. W obu budynkach zostaną zastosowane indywidualne liczniki ciepła,ciepłej wody. Projekt został podzielony na 2 główne zadania rozdzielone nazwą dwóch budynków, w których będzie przebiegał proces termomodernizacji. Realizacja projektu przyczyni się do likwidacji niskiej emisji, co w gminach Małopolski ma bardzo istotne znaczenie. Na podstawie Metodyki sporządzania audytów energetycznych dla budynków podlegających głębokiej modernizacji energetycznej w ramach Regionalnego Programu Operacyjnego Województwa Małopolskiego na lata 2014 – 2020 oraz obliczania efektu ekologicznego obliczono podstawowe wskaźniki dotyczące redukcji emisji CO2, zmniejszenia zapotrzebowania na energię końcową i pierwotną dla budynków oraz redukcję emisji pyłów PM10 i PM2,5. Emisja CO2 zostanie zredukowana o 84,85%, pyłów PM10 i PM2,5 o odpowiednio 88,52% i 95,23%. O 39,17% ulegnie zmniejszeniu roczne zapotrzebowanie na energię końcową dla modernizowanych budynków. (Polish)
0 references
Subject of the project/investment: The project is a thermal modernisation of 2 educational units, located in 2 buildings. — SP and Gimnazjum Jan Paul II, in the Dolnaided Voluntary Service — installation of a 200kw boiler together with construction works in a boiler room, installation of 2 695 m insulated supply pipelines, installation of 113 litres of radiators, including thermostatic heads and return valves, insulation of the ceiling structure, partial replacement of the window frames 18 and the door 2.58 m². — SP Ks. Twardowski, the assembly of a 150kw cord together with construction works on the boiler room, the installation of 49 thermostatic heads and 40 return valves, the insulation of the ceiling, the partial replacement of the window frames 1.83 m² and the door 2.27 m². Individual heat meters, warm water, will be used in both buildings. The project has been divided into 2 main tasks, separated by the name of two buildings in which the thermal modernisation process will take place. The implementation of the project will contribute to the elimination of low emissions, which is very important in the municipalities of Małopolskie Province. On the basis of the preparation of energy audits for buildings subject to deep energy modernisation under the Regional Operational Programme for the Małopolskie Province for the period 2014-2020 and the calculation of the ecological effect, the basic indicators for CO2 emissions reduction, the reduction in final and primary energy demand for buildings and the reduction of PM10 and PM2,5 emissions have been calculated. CO2 emissions will be reduced by 84.85 %, PM10 and PM2,5 by 88.52 % and 95.23 % respectively. The annual final energy demand for modernised buildings will be reduced by 39.17 %. (English)
0 references
Identifiers
RPMP.04.03.02-12-0213/16
0 references