Renovation of the building of the Primary School in Buczyn for thermal modernisation and change of heat generator (Q95478): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed an Item)
Property / fund
 
Property / fund: European Regional Development Fund / rank
 
Normal rank

Revision as of 02:17, 7 June 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Renovation of the building of the Primary School in Buczyn for thermal modernisation and change of heat generator
Project in Poland financed by DG Regio

    Statements

    0 references
    999,379.55 zloty
    0 references
    239,851.092 Euro
    13 January 2020
    0 references
    1,250,641.38 zloty
    0 references
    300,153.93119999993 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    31 December 2015
    0 references
    9 November 2017
    0 references
    GMINA RADWANICE
    0 references
    Przedmiotem projektu jest termomodernizacja jednego budynku – Szkoły Podstawowej w Buczynie. Dotychczas opracowano audyt energetyczny, dokumentację techniczną i studium wykonalności. Roboty budowlane nie zostały rozpoczęte. W dniu 2016-02-22 Gmina Radwanice dokonała zgłoszenia robót budowlanych dla całego zakresu projektu. W dniu 2016-03-15 Starosta Polkowicki zaświadczył, że nie wnosi sprzeciwu do wykonania robót budowlanych. Wnioskodawcą, Inwestorem, Beneficjentem i Operatorem przedmiotowej inwestycji będzie Gmina Radwanice, która produkty projektu będzie użytkowała poprzez swoją jednostkę organizacyjną Szkołę Podstawową w Buczynie. Projekt obejmuje prace przygotowawcze tj. Audyt energetyczny (Zadanie nr 1), Studium wykonalności (Zadanie nr 2), Roboty budowlane – budynek SP w Buczynie (Zadanie nr 3), Nadzór inwestorski (Zadanie nr 4), Promocja projektu (Zadanie nr 5). Zakres rzeczowy obejmuje: montaż pompy ciepła z wymiennikiem gruntowym, modernizację instalacji c.o. i c.w.u., wymianę stolarki drzwiowej i okiennej, docieplenie przegród i dachu, stropów i ściany w gruncie. Zakres projektu jest oparty o ustalenia z audytu w zakresie gwarantującym osiągnięcie wymaganych przez program limitów, w tym w zakresie oszczędności energii i ograniczenia emisji CO2 oraz osiągnięcie wskaźników. Zaplanowanie sterowanie systemem grzewczym za pomocą automatyki pogodowej oraz zaworów podpionowych i termostatycznych. Ogrzewanie wodne z grzejnikami członowym i lub płytowymi z regulacją centralną i miejscowej z zaworem termostatycznym o działaniu proporcjonalno-całkującym PI z funkcjami adaptacyjną i optymalizującą. Przewidziano strefowanie instalacji z podziałem na część wschodnią i zachodnią. Efekty projektu: oszczędność energii końcowej: 234 685,38 kWh/rok 844,87 GJ/rok; tj.: 71,8%, pierwotnej: 221 101,64 kWh/rok 795,97 GJ/rok; tj.: 53,2%,szacowany roczny spadek emisji CO2: 55,57 MgCO2/rok, tj.: 50,1%.Projekt nie generuje dochodów,nie jest objęty pomocą publiczną i nie jest duży. (Polish)
    0 references
    The project is the thermal renovation of one building — the Primary School in Buczyn. Until now, an energy audit, technical documentation and a feasibility study have been developed. The works have not started. On 2016-02-22, Radwaice made a construction report for the whole scope of the project. On 2016-03-15, the Starosta Polkowicki declared that he had no objections to the execution of the works. The applicant, the Investor, the Beneficiary and the Operation of the investment in question will be the Municipality of Radwanice, which will use its organisational unit to use the Primary School in Bulgaria through its organisational unit. The project involves preparatory work, i.e. Energy audit (Task No 1), Feasibility Study (Task No 2), Construction works — SP Building in Buczyn (Task No 3), Investor Supervisory (Task 4), Project Promotion (Task No 5). The material scope consists of: installation of a heat pump with ground exchanger, modernisation of the heating and cooling installations, replacement of door and window frames, insulation of bulkheads and roof, ceilings and walls on the ground. The scope of the project shall be based on audit findings with a view to ensuring that the limits required by the programme are met, including on energy savings and CO2 emission reductions and on the achievement of indicators. To plan the control of the heating system by weather and substatic valves and thermostatic control. Water heating with variable and/or shallow water-based heaters with thermo-static valve, which shall be equipped with adaptive and optimised PI with adaptation and optimisation functions. Provision is made for the zoning of installations broken down into the east and west. Results of the project: final energy savings: 234 685.38 kWh/844,87 GJ/year; i.e.: 71.8 % primary: 221 101.64 kWh/795,97 GJ/year; i.e.: 53.2 %, estimated annual decrease in CO2 emissions: 55,57 MgCO2/rok, i.e.: 50.1 %.The project does not generate revenue, is not covered by state aid and is not large. (English)
    0 references

    Identifiers

    RPDS.03.03.01-02-0008/16
    0 references