Smart lighting control using a 2-conductivity/supply rail (Q78249): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed an Item)
Property / fund
 
Property / fund: European Regional Development Fund / rank
 
Normal rank

Revision as of 21:28, 6 June 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Smart lighting control using a 2-conductivity/supply rail
Project in Poland financed by DG Regio

    Statements

    0 references
    340,083.76 zloty
    0 references
    81,620.1024 Euro
    13 January 2020
    0 references
    484,633.0 zloty
    0 references
    116,311.92 Euro
    13 January 2020
    0 references
    70.17 percent
    0 references
    1 September 2017
    0 references
    31 October 2018
    0 references
    WOJNAROWSCY SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    0 references

    50°12'49.3"N, 19°0'21.2"E
    0 references
    Numer_referencyjny_programu_pomocowego: SA.41471(2015/X) Przeznaczenie_pomocy_publicznej: art. 25 rozporządzenia KE nr 651/2014 z dnia 17 czerwca 2014 r. uznające niektóre rodzaje pomocy za zgodne z rynkiem wewnętrznym w stosowaniu art. 107 i 108 Traktatu (Dz. Urz. UE L 187/1 z 26.06.2014). Celem projektu jest stworzenie algorytmów i przetestowanie podstawowych elementów systemu sterowania oświetleniem bazujących na pomyśle sterowania źródeł z wydzielonej linii zasilająco sterującej. Uzyskujemy przez to pełną funkcjonalność oferowaną przez dostępne systemy (np. DALI) bez konieczności prowadzenia dodatkowej linii sterującej i z bezpośrednim dostępem do elementów systemów z aplikacji mobilnej tak jak w technologii bezprzewodowej. Istotną cechą jest niepowielanie bloku dopasowującego zasilanie do wymagań dla obciążenia linii zasilającej dla każdego urządzenia co obniża koszt systemu i pozwala na zmniejszenie rozmiarów driverów, pozwalające na ich implementacje również w retrofitach źródeł tradycyjnych i LED. Efektem projektu ma być opracowanie i przetestowanie podstawowych elementów systemu: -Zasilacza centralnego 1000W -Drivera uniwersalnego do opraw 50W/1.4A (programowalny) -Drivera do źródeł LED ( 10W programowalny) -Czujnika ruchu i natężenia oświetlenia. -Kontrolera element sterującego (do puszki przyciski+ pokrętło) Wraz z ich oprogramowaniem wbudowanym i wykorzystanymi algorytmami sterowania i transmisji danych.. Podstawowe fazy projektu: Jakkolwiek projekt jest podzielony na etapy, takie jak: -specyfikacja protokołu i implementacja stosu, -wykonanie prototypów driverów i testowanie algorytmu sterującego SMPS, -projekt i prototypowanie zasilacza centralnego/sterownika -prototypy i testy elementów czujnikowych -testy systemu; to w istocie, ze względu na silne zależności pomiędzy elementami będzie to proces iteracyjny, w harmonogramie przewidzieliśmy po 2 ruchome "okna" nakorektę rozwiązań sprzętowych. (Polish)
    0 references
    Reference_reference_programme_aids:SA.41471 (2015/X) _public:Article 25 of Commission Regulation (EC) No 651/2014 of 17 June 2014 declaring certain categories of aid compatible with the internal market in the application of Article 107 and 108 of the Treaty (OJ(OJ LEU L 187/1, 26.06.2014).The aim of the project is to establish algorithms and test core elements of the lighting control system based on the success of the source control lines of a separate line for the control.We make use of the full functionality offered by the available systems (e.g.:They) without the need for an additional control line and direct access to systems elements from mobile applications such as in wireless technology.An important feature is the non-duplication of the matching bin to the requirements for the load line load for each device, which reduces the cost of the system and allows for a reduction in the size of the driver, which allows them to be implemented also in conventional and LED origin.The result of the project is to develop and test the core elements of the system:— Universal PSU 1000W Drita Drita Drita to LED (10W software) to LED (W programmable) -TIC, and lighting intensity.— Control control (to the can of buttons + knob) and their control software and data transmission algorithms.The basic phases of the project are as follows:However, the project is divided in phases, such as:— specification of the protocol and implementation of the stack, the implementation of prototype drives and testing of the SMPS control algorithm, the central power supply/controller protocol/prototypes and the testing of sensor elements and system tests;in fact, because of the strong links between the elements, we will have an iterative process in the schedule of 2 mobile “windows” adjusting equipment solutions. (English)
    0 references

    Identifiers

    POIR.01.01.01-00-0718/17
    0 references