INTEGRATED INTERVENTIONS FOR THE COMPLETION OF THE COASTAL DEFENCE WORKS (BETWEEN THE MOUTH FIUMARA SANTCÂ BECOMES Â OF THE ZONE) (Q2013150): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed an Item) |
||||||||||||||
Property / location (string) | |||||||||||||||
Property / location (string): TUTTI I COMUNI / rank | |||||||||||||||
Property / location (string) | |||||||||||||||
Property / location (string): MONTEBELLO JONICO / rank | |||||||||||||||
Property / coordinate location | |||||||||||||||
| |||||||||||||||
Property / coordinate location: 37°58'57.97"N, 15°45'28.80"E / rank | |||||||||||||||
Property / contained in NUTS | |||||||||||||||
Property / contained in NUTS: Province of Reggio Calabria / rank | |||||||||||||||
Property / date of last update | |||||||||||||||
| |||||||||||||||
Property / date of last update: 8 April 2023 / rank | |||||||||||||||
Property / date of last update | |||||||||||||||
24 April 2023
| |||||||||||||||
Property / date of last update: 24 April 2023 / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / location (string) | |||||||||||||||
CALABRIA | |||||||||||||||
Property / location (string): CALABRIA / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / coordinate location | |||||||||||||||
39°3'23.76"N, 16°31'29.96"E
| |||||||||||||||
Property / coordinate location: 39°3'23.76"N, 16°31'29.96"E / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / coordinate location: 39°3'23.76"N, 16°31'29.96"E / qualifier | |||||||||||||||
Property / contained in NUTS | |||||||||||||||
Property / contained in NUTS: Province of Catanzaro / rank | |||||||||||||||
Normal rank |
Revision as of 17:49, 24 April 2023
Project Q2013150 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | INTEGRATED INTERVENTIONS FOR THE COMPLETION OF THE COASTAL DEFENCE WORKS (BETWEEN THE MOUTH FIUMARA SANTCÂ BECOMES Â OF THE ZONE) |
Project Q2013150 in Italy |
Statements
1,350,000.0 Euro
0 references
1,800,000.0 Euro
0 references
75.0 percent
0 references
30 June 2017
0 references
31 December 2021
0 references
REGIONE CALABRIA
0 references
INTERVENTI INTEGRATI PER IL COMPLETAMENTO DELLE OPERE DI DIFESA COSTIERA (TRA FOCE FIUMARA SANT¿ANNà ¿ FAVAZZINA) (Italian)
0 references
INTEGRATED INTERVENTIONS FOR THE COMPLETION OF THE COASTAL DEFENCE WORKS (BETWEEN THE MOUTH FIUMARA SANTCÂ BECOMES Â OF THE ZONE) (English)
0 references
INTERVENTIONS INTÉGRÉES POUR L’ACHÈVEMENT DES TRAVAUX DE DÉFENSE CÔTIÈRE (ENTRE L’EMBOUCHURE DE FIUMARA SANTÂ’ANNÃ"FAVAZZINA) (French)
14 December 2021
0 references
GEÏNTEGREERDE INTERVENTIES VOOR DE VOLTOOIING VAN KUSTVERDEDIGINGSWERKEN (TUSSEN DE MONDING VAN FIUMARA SANTÂ’ANNÃ Â’FAVAZZINA) (Dutch)
22 December 2021
0 references
INTEGRIERTE INTERVENTIONEN ZUR FERTIGSTELLUNG DER KÜSTENSCHUTZARBEITEN (ZWISCHEN DER MÜNDUNG VON FIUMARA SANT¿ANNà ¿FAVAZZINA) (German)
24 December 2021
0 references
INTERVENCIONES INTEGRADAS PARA LA REALIZACIÓN DE OBRAS DE DEFENSA COSTERA (ENTRE LA DESEMBOCADURA DE FIUMARA SANT¿ANNÀ?FAVAZZINA) (Spanish)
24 January 2022
0 references
INTEGREREDE INTERVENTIONER TIL FÆRDIGGØRELSE AF KYSTFORSVARSARBEJDET (MELLEM FIUMARA SANTCS MUNDING BLIVER ZONEN) (Danish)
4 July 2022
0 references
ΟΛΟΚΛΗΡΩΜΈΝΕΣ ΕΠΕΜΒΆΣΕΙΣ ΓΙΑ ΤΗΝ ΟΛΟΚΛΉΡΩΣΗ ΤΩΝ ΠΑΡΆΚΤΙΩΝ ΑΜΥΝΤΙΚΏΝ ΕΡΓΑΣΙΏΝ (ΜΕΤΑΞΎ ΤΟΥ ΣΤΌΜΑΤΟΣ FIUMARA SANTC ΓΊΝΕΤΑΙ ΤΗΣ ΖΏΝΗΣ) (Greek)
4 July 2022
0 references
INTEGRIRANE INTERVENCIJE ZA DOVRŠETAK OBALNIH OBRAMBENIH RADOVA (IZMEĐU UŠĆA FIUMARA SANTC POSTAJE ZONA) (Croatian)
4 July 2022
0 references
INTERVENȚII INTEGRATE PENTRU FINALIZAREA LUCRĂRILOR DE APĂRARE COSTIERĂ (ÎNTRE GURA FIUMARA SANTC DEVINE ZONA) (Romanian)
4 July 2022
0 references
INTEGROVANÉ ZÁSAHY NA DOKONČENIE POBREŽNÝCH OBRANNÝCH PRÁC (MEDZI ÚSTÍM FIUMARA SANTC SA STÁVA ZÓNA) (Slovak)
4 July 2022
0 references
INTERVENTI INTEGRATI GĦAT-TLESTIJA TAX-XOGĦLIJIET TA’ DIFIŻA KOSTALI (BEJN IL-ĦALQ FIUMARA SANTC ISIR TAŻ-ŻONA) (Maltese)
4 July 2022
0 references
INTERVENÇÕES INTEGRADAS PARA A CONCLUSÃO DAS OBRAS DE DEFESA COSTEIRA (ENTRE A FOZ FIUMARA SANTC TORNA-SE DA ZONA) (Portuguese)
4 July 2022
0 references
RANNIKKOALUEIDEN PUOLUSTUSTÖIDEN LOPPUUNSAATTAMISEEN TÄHTÄÄVÄT INTEGROIDUT TOIMET (SUUN VÄLISSÄ FIUMARA SANTC TULEE VYÖHYKKEELTÄ) (Finnish)
4 July 2022
0 references
ZINTEGROWANE INTERWENCJE NA ZAKOŃCZENIE PRAC W ZAKRESIE OBRONY WYBRZEŻA (POMIĘDZY UJŚCIEM FIUMARA SANTC STAJE SIĘ STREFĄ) (Polish)
4 July 2022
0 references
INTEGRIRANI POSEGI ZA DOKONČANJE OBALNIH OBRAMBNIH DEL (MED USTJEM FIUMARA SANTC POSTANE OBMOČJE) (Slovenian)
4 July 2022
0 references
INTEGROVANÉ ZÁSAHY PRO DOKONČENÍ POBŘEŽNÍCH OBRANNÝCH PRACÍ (MEZI ÚSTÍM FIUMARA SANTC SE STÁVÁ ZÓNA) (Czech)
4 July 2022
0 references
INTEGRUOTOS INTERVENCIJOS, SKIRTOS PAKRANČIŲ GYNYBOS DARBAMS UŽBAIGTI (TARP ŽIOČIŲ FIUMARA SANTC TAMPA ZONOS) (Lithuanian)
4 July 2022
0 references
INTEGRĒTA IEJAUKŠANĀS PIEKRASTES AIZSARDZĪBAS DARBU PABEIGŠANAI (STARP IETEKU FIUMARA SANTC KĻŪST PAR ZONU) (Latvian)
4 July 2022
0 references
ИНТЕГРИРАНИ ИНТЕРВЕНЦИИ ЗА ЗАВЪРШВАНЕ НА ДЕЙНОСТИТЕ ПО КРАЙБРЕЖНАТА ОТБРАНА (МЕЖДУ УСТИЕТО FIUMARA SANTC СЕ ПРЕВРЪЩА В ЗОНА) (Bulgarian)
4 July 2022
0 references
INTEGRÁLT BEAVATKOZÁSOK A PARTVÉDELMI MUNKÁLATOK BEFEJEZÉSÉHEZ (A FIUMARA SANTC SZÁJA KÖZÖTT A ZÓNA RÉSZÉVÉ VÁLIK) (Hungarian)
4 July 2022
0 references
IDIRGHABHÁLACHA COMHTHÁITE CHUN NA HOIBREACHA COSANTA CÓSTA A CHUR I GCRÍCH (IDIR BÉAL FIUMARA SANTC A THIOCFAIDH CHUN BHEITH SA CHRIOS) (Irish)
4 July 2022
0 references
INTEGRERADE INSATSER FÖR SLUTFÖRANDET AV KUSTFÖRSVARET (MELLAN MYNNINGEN FIUMARA SANTC BLIR AV ZONEN) (Swedish)
4 July 2022
0 references
INTEGREERITUD SEKKUMISED RANNIKUKAITSETÖÖDE LÕPULEVIIMISEKS (SUU VAHEL FIUMARA SANTC MUUTUB TSOONIST) (Estonian)
4 July 2022
0 references
24 April 2023
0 references
CALABRIA
0 references
Identifiers
J65B17000330006
0 references