DEVELOPMENT OF THE REGIONAL MONITORING SYSTEM (Q2050928): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,) |
(Changed an Item: Discontinued project) |
||
Property / instance of: Kohesio project / rank | Property / instance of: Kohesio project / rank | ||
Deprecated rank | |||
Property / instance of | |||
Property / instance of: Discontinued Kohesio Project / rank | |||
Normal rank |
Latest revision as of 19:35, 8 April 2023
Project Q2050928 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | DEVELOPMENT OF THE REGIONAL MONITORING SYSTEM |
Project Q2050928 in Italy |
Statements
4,215,731.49 Euro
0 references
8,431,462.99 Euro
0 references
50.0 percent
0 references
23 March 2017
0 references
19 February 2020
0 references
ENTE DI GOVERNO DELL'AMBITO DELLA SARDEGNA
0 references
SISTEMI DI DISTRIBUZIONE GESTITI DA ABBANOA SPA SONO STATI OGGETTO DI RECENTI FINANZIAMENTI ACCORDATI DA DEL. CIPE 27/2015 E DC N.8 DEL 10.04.2014, MIRATI ALLA RIQUALIFICAZIONE DELLE RETI IDRICHE MEDIANTE LA SOSTITUZIONE DELLE CONDOTTE VETUSTE. IL COMPLETAMENTO DELLE AZIONI DI CONTENIMENTO DELLE PERDITE IDRICHE RICHIEDE L¿ATTIVAZIONE DI UNA ESTESA RETE DI MONITORAGGIO E CONTROLLO ATTIVO DEL FUNZIONAMENTO DELLE RETI E DEGLI IMPIANTI, FINALIZZATA ALLA OTTIMIZZAZIONE DELLE ATTIVITà DI GESTIONE E ALLA PRESERVAZIONE NEL TEMPO DEI RISULTATI RAGGIUNTI. SI PREVEDE IL POSIZIONAMENTO DI ALMENO 1500 PERIFERICHE REMOTE SU SCALA REGIONALE, DOTATE DI MISURATORI E SISTEMI DI TRASMISSIONE COLLEGATI CON IL SUPERVISORE CENTRALE GIà IN USO PRESSO ABBANOA SPA, PER LE ATTIVITà DI TELEMISURA DELLE GRANDEZZE IDRAULICHE E REGOLAZIONE IN TEMPO REALE DELLE PRESTAZIONI DEGLI IMPIANTI E DELLE APPARECCHIATURE DISLOCATE IN RETE. (Italian)
0 references
DISTRIBUTION SYSTEMS OPERATED BY ABBANOA SPA HAVE BEEN THE SUBJECT OF RECENT LOANS GRANTED BY THE COMPANY ABBANOA. CIPE 27/2015 AND DC N.8 OF 10.04.2014, AIMED AT UPGRADING THE WATER NETWORKS BY REPLACING OLD ONES. THE COMPLETION OF ACTIONS TO CONTAIN WATER LOSSES REQUIRES REPLICATION OF THE ACTIVATION OF AN EXTENSIVE NETWORK OF ACTIVE MONITORING AND CONTROL OF THE OPERATION OF NETWORKS AND INSTALLATIONS, WITH THE AIM OF OPTIMISING THE MANAGEMENT ACTIVITIES AND PRESERVING THE RESULTS ACHIEVED OVER TIME. IT IS PLANNED TO POSITION AT LEAST 1500 REMOTE OUTLYING REGIONS ON A REGIONAL SCALE, EQUIPPED WITH METERS AND TRANSMISSION SYSTEMS CONNECTED WITH THE CENTRAL SUPERVISOR IN USE WITH ABBANOA (ABBANOA), IN ORDER TO CARRY OUT THE MONITORING OF HYDRAULIC QUANTITIES AND REAL-TIME REGULATION OF NETWORK FACILITIES AND EQUIPMENT. (English)
0 references
LES SYSTÈMES DE DISTRIBUTION GÉRÉS PAR ABBANOA SPA ONT FAIT L’OBJET D’UN FINANCEMENT RÉCENT ACCORDÉ PAR DEL. CIPE 27/2015 ET DC N.8 DU 10.04.2014, VISANT À MODERNISER LES RÉSEAUX D’EAU EN REMPLAÇANT LES ANCIENS GAZODUCS. L’ACHÈVEMENT DES ACTIONS VISANT À CONTENIR LES PERTES D’EAU NÉCESSITE L’ACTIVATION D’UN VASTE RÉSEAU DE SURVEILLANCE ET DE CONTRÔLE ACTIFS DE L’EXPLOITATION DES RÉSEAUX ET DES INSTALLATIONS, VISANT À OPTIMISER LES ACTIVITÉS DE GESTION ET À PRÉSERVER AU FIL DU TEMPS LES RÉSULTATS OBTENUS. IL EST PRÉVU DE POSITIONNER AU MOINS 1500 PÉRIPHÉRIQUES À DISTANCE À L’ÉCHELLE RÉGIONALE, ÉQUIPÉS DE COMPTEURS ET DE SYSTÈMES DE TRANSMISSION RELIÉS AU SUPERVISEUR CENTRAL DÉJÀ EN SERVICE À ABBANOA SPA, POUR LES ACTIVITÉS DE MESURE À DISTANCE DES GRANDEURS HYDRAULIQUES ET DE RÉGULATION EN TEMPS RÉEL DES PERFORMANCES DES SYSTÈMES ET ÉQUIPEMENTS DÉPLOYÉS SUR LE RÉSEAU. (French)
16 December 2021
0 references
DE DISTRIBUTIESYSTEMEN DIE DOOR ABBANOA SPA WORDEN BEHEERD, ZIJN ONLANGS DOOR DEL VERSTREKT. CIPE 27/2015 EN DC N.8 VAN 10.4.2014 HADDEN TOT DOEL DE WATERNETWERKEN TE MODERNISEREN DOOR OUDE PIJPLEIDINGEN TE VERVANGEN. DE VOLTOOIING VAN DE MAATREGELEN OM WATERVERLIEZEN TE BEPERKEN VEREIST DE ACTIVERING VAN EEN UITGEBREID NETWERK VAN ACTIEVE MONITORING EN CONTROLE VAN DE EXPLOITATIE VAN NETWERKEN EN INSTALLATIES, DAT GERICHT IS OP HET OPTIMALISEREN VAN DE BEHEERSACTIVITEITEN EN HET BEHOUD VAN DE BEREIKTE RESULTATEN IN DE LOOP VAN DE TIJD. HET IS DE BEDOELING OM TEN MINSTE 1500 AFGELEGEN RANDAPPARATUUR OP REGIONALE SCHAAL TE PLAATSEN, UITGERUST MET METERS EN TRANSMISSIESYSTEMEN DIE VERBONDEN ZIJN MET DE CENTRALE TOEZICHTHOUDER DIE REEDS IN DE SPA VAN ABBANOA IN GEBRUIK IS, VOOR DE ACTIVITEITEN VAN HET METEN OP AFSTAND VAN HYDRAULISCHE HOEVEELHEDEN EN DE REAL-TIME REGULERING VAN DE PRESTATIES VAN SYSTEMEN EN APPARATUUR DIE IN HET NETWERK WORDEN INGEZET. (Dutch)
23 December 2021
0 references
DIE VON ABBANOA SPA VERWALTETEN VERTRIEBSSYSTEME WURDEN KÜRZLICH VON DEL FINANZIERT. CIPE 27/2015 UND DC N.8 VOM 10.4.2014 ZUR MODERNISIERUNG DER WASSERNETZE DURCH DEN AUSTAUSCH ALTER PIPELINES. DER ABSCHLUSS DER MASSNAHMEN ZUR EINDÄMMUNG VON WASSERVERLUSTEN ERFORDERT DIE AKTIVIERUNG EINES UMFANGREICHEN NETZES AKTIVER ÜBERWACHUNG UND KONTROLLE DES BETRIEBS VON NETZEN UND ANLAGEN, MIT DEM ZIEL, DIE MANAGEMENTAKTIVITÄTEN ZU OPTIMIEREN UND DIE ERZIELTEN ERGEBNISSE IM LAUFE DER ZEIT ZU ERHALTEN. ES IST GEPLANT, MINDESTENS 1500 ENTFERNTE PERIPHERIEGERÄTE AUF REGIONALER EBENE ZU POSITIONIEREN, DIE MIT ZÄHLERN UND ÜBERTRAGUNGSSYSTEMEN AUSGESTATTET SIND, DIE MIT DEM BEREITS IN ABBANOA SPA EINGESETZTEN ZENTRALBETREUER VERBUNDEN SIND, FÜR DIE TÄTIGKEITEN DER FERNMESSUNG VON HYDRAULIKMENGEN UND ECHTZEIT-REGELUNGEN FÜR DIE LEISTUNG DER IM NETZ EINGESETZTEN SYSTEME UND GERÄTE. (German)
24 December 2021
0 references
LOS SISTEMAS DE DISTRIBUCIÓN GESTIONADOS POR ABBANOA SPA HAN SIDO OBJETO DE FINANCIACIÓN RECIENTE CONCEDIDA POR DEL. CIPE 27/2015 Y DC N.8 DE 10.4.2014, DESTINADOS A MEJORAR LAS REDES DE AGUA MEDIANTE LA SUSTITUCIÓN DE LOS ANTIGUOS GASODUCTOS. LA REALIZACIÓN DE LAS ACCIONES PARA CONTENER LAS PÉRDIDAS DE AGUA REQUIERE LA ACTIVACIÓN DE UNA EXTENSA RED DE SEGUIMIENTO ACTIVO Y CONTROL DEL FUNCIONAMIENTO DE LAS REDES Y PLANTAS, CON EL OBJETIVO DE OPTIMIZAR LAS ACTIVIDADES DE GESTIÓN Y PRESERVAR CON EL TIEMPO LOS RESULTADOS OBTENIDOS. ESTÁ PREVISTO COLOCAR AL MENOS 1500 PERIFÉRICOS REMOTOS A ESCALA REGIONAL, EQUIPADOS CON CONTADORES Y SISTEMAS DE TRANSMISIÓN CONECTADOS CON EL SUPERVISOR CENTRAL YA EN USO EN EL SPA DE ABBANOA, PARA LAS ACTIVIDADES DE MEDICIÓN A DISTANCIA DE LAS CANTIDADES HIDRÁULICAS Y LA REGULACIÓN EN TIEMPO REAL DEL RENDIMIENTO DE LOS SISTEMAS Y EQUIPOS DESPLEGADOS EN LA RED. (Spanish)
25 January 2022
0 references
ABBANOA SPA KÄITATAVAD JAOTUSSÜSTEEMID ON ETTEVÕTJA ABBANOA POOLT HILJUTI ANTUD LAENE. CIPE 27/2015 JA DC N.8 (10.4.2014), MILLE EESMÄRK OLI AJAKOHASTADA VEEVÕRKE VANADE VÕRKUDE ASENDAMISE TEEL. VEEKAO OHJELDAMISE MEETMETE LÕPULEVIIMINE NÕUAB ULATUSLIKU VÕRGUSTIKU AKTIVEERIMIST, MIS HÕLMAB VÕRKUDE JA RAJATISTE TOIMIMISE AKTIIVSET SEIRET JA KONTROLLI, EESMÄRGIGA OPTIMEERIDA MAJANDAMISTEGEVUST JA SÄILITADA AJA JOOKSUL SAAVUTATUD TULEMUSED. KAVAS ON PAIGUTADA PIIRKONDLIKUL TASANDIL VÄHEMALT 1500 ÄÄREPOOLSET PIIRKONDA, MIS ON VARUSTATUD ABBANOAGA (ABBANOA) KASUTATAVA KESKSE JÄRELEVALVEASUTUSEGA ÜHENDATUD ARVESTITE JA ÜLEKANDESÜSTEEMIDEGA, ET JÄLGIDA HÜDRAULILISI KOGUSEID NING REGULEERIDA VÕRGUSEADMEID JA -SEADMEID REAALAJAS. (Estonian)
27 July 2022
0 references
ABBANOA SPA VALDOMOMS PASKIRSTYMO SISTEMOMS NESENIAI BUVO SUTEIKTOS PASKOLOS, KURIAS SUTEIKĖ BENDROVĖ ABBANOA. 2014 M. BALANDŽIO 10 D. CIPE 27/2015 IR DC N.8 BUVO SIEKIAMA MODERNIZUOTI VANDENS TINKLUS PAKEIČIANT SENUS TINKLUS. NORINT UŽBAIGTI VANDENS NUOSTOLIŲ RIBOJIMO VEIKSMUS, REIKIA AKTYVUOTI PLATŲ TINKLŲ IR ĮRENGINIŲ AKTYVIOS STEBĖSENOS IR KONTROLĖS TINKLĄ, SIEKIANT OPTIMIZUOTI VALDYMO VEIKLĄ IR IŠSAUGOTI PER TAM TIKRĄ LAIKĄ PASIEKTUS REZULTATUS. PLANUOJAMA, KAD BENT 1500 ATOKIŲ REGIONŲ REGIONINIU MASTU BUS ĮRENGTI SU ABBANOA (ABBANOA) NAUDOJAMAIS SKAITIKLIAIS IR PERDAVIMO SISTEMOMIS, KAD BŪTŲ GALIMA STEBĖTI HIDRAULINIUS KIEKIUS IR TIKRUOJU LAIKU REGULIUOTI TINKLO ĮRENGINIUS IR ĮRANGĄ. (Lithuanian)
27 July 2022
0 references
DISTRIBUCIJSKI SUSTAVI KOJIMA UPRAVLJA ABBANOA SPA BILI SU PREDMET NEDAVNIH ZAJMOVA KOJE JE ODOBRILO DRUŠTVO ABBANOA. CIPE 27/2015 I DC N.8 OD 10. TRAVNJA 2014., ČIJI JE CILJ NADOGRADNJA VODNIH MREŽA ZAMJENOM STARIH. DOVRŠENJE MJERA ZA OGRANIČAVANJE GUBITAKA VODE ZAHTIJEVA PONAVLJANJE AKTIVACIJE OPSEŽNE MREŽE AKTIVNOG PRAĆENJA I KONTROLE RADA MREŽA I INSTALACIJA S CILJEM OPTIMIZACIJE AKTIVNOSTI UPRAVLJANJA I OČUVANJA REZULTATA POSTIGNUTIH TIJEKOM VREMENA. PLANIRA SE POZICIONIRANJE NAJMANJE 1500 UDALJENIH REGIJA NA REGIONALNOJ RAZINI, OPREMLJENIH BROJILIMA I PRIJENOSNIM SUSTAVIMA POVEZANIMA SA SREDIŠNJIM NADZORNIKOM U UPORABI S ABBANOOM (ABBANOA), KAKO BI SE PROVELO PRAĆENJE HIDRAULIČKIH KOLIČINA I REGULIRANJE MREŽNIH OBJEKATA I OPREME U STVARNOM VREMENU. (Croatian)
27 July 2022
0 references
ΤΑ ΔΊΚΤΥΑ ΔΙΑΝΟΜΉΣ ΠΟΥ ΔΙΑΧΕΙΡΊΖΕΤΑΙ Η ABBANOA SPA ΑΠΟΤΈΛΕΣΑΝ ΑΝΤΙΚΕΊΜΕΝΟ ΠΡΌΣΦΑΤΩΝ ΔΑΝΕΊΩΝ ΠΟΥ ΧΟΡΉΓΗΣΕ Η ΕΤΑΙΡΕΊΑ ABBANOA. CIPE 27/2015 ΚΑΙ DC N.8 ΤΗΣ 10.04.2014, ΜΕ ΣΤΌΧΟ ΤΗΝ ΑΝΑΒΆΘΜΙΣΗ ΤΩΝ ΔΙΚΤΎΩΝ ΎΔΡΕΥΣΗΣ ΜΕ ΤΗΝ ΑΝΤΙΚΑΤΆΣΤΑΣΗ ΤΩΝ ΠΑΛΑΙΏΝ. Η ΟΛΟΚΛΉΡΩΣΗ ΤΩΝ ΔΡΆΣΕΩΝ ΓΙΑ ΤΟΝ ΠΕΡΙΟΡΙΣΜΌ ΤΩΝ ΑΠΩΛΕΙΏΝ ΝΕΡΟΎ ΑΠΑΙΤΕΊ ΑΝΑΠΑΡΑΓΩΓΉ ΤΗΣ ΕΝΕΡΓΟΠΟΊΗΣΗΣ ΕΝΌΣ ΕΚΤΕΤΑΜΈΝΟΥ ΔΙΚΤΎΟΥ ΕΝΕΡΓΟΎ ΠΑΡΑΚΟΛΟΎΘΗΣΗΣ ΚΑΙ ΕΛΈΓΧΟΥ ΤΗΣ ΛΕΙΤΟΥΡΓΊΑΣ ΔΙΚΤΎΩΝ ΚΑΙ ΕΓΚΑΤΑΣΤΆΣΕΩΝ, ΜΕ ΣΤΌΧΟ ΤΗ ΒΕΛΤΙΣΤΟΠΟΊΗΣΗ ΤΩΝ ΔΙΑΧΕΙΡΙΣΤΙΚΏΝ ΔΡΑΣΤΗΡΙΟΤΉΤΩΝ ΚΑΙ ΤΗ ΔΙΑΤΉΡΗΣΗ ΤΩΝ ΑΠΟΤΕΛΕΣΜΆΤΩΝ ΠΟΥ ΕΠΙΤΥΓΧΆΝΟΝΤΑΙ ΜΕ ΤΗΝ ΠΆΡΟΔΟ ΤΟΥ ΧΡΌΝΟΥ. ΠΡΟΒΛΈΠΕΤΑΙ Η ΤΟΠΟΘΈΤΗΣΗ ΤΟΥΛΆΧΙΣΤΟΝ 1500 ΑΠΟΜΑΚΡΥΣΜΈΝΩΝ ΑΠΟΜΑΚΡΥΣΜΈΝΩΝ ΠΕΡΙΟΧΏΝ ΣΕ ΠΕΡΙΦΕΡΕΙΑΚΉ ΚΛΊΜΑΚΑ, ΕΞΟΠΛΙΣΜΈΝΕΣ ΜΕ ΜΕΤΡΗΤΈΣ ΚΑΙ ΣΥΣΤΉΜΑΤΑ ΜΕΤΆΔΟΣΗΣ ΣΥΝΔΕΔΕΜΈΝΑ ΜΕ ΤΟΝ ΚΕΝΤΡΙΚΌ ΕΠΌΠΤΗ ΣΕ ΧΡΉΣΗ ΜΕ ΤΗΝ ABBANOA (ABBANOA), ΜΕ ΣΚΟΠΌ ΤΗΝ ΠΑΡΑΚΟΛΟΎΘΗΣΗ ΤΩΝ ΥΔΡΑΥΛΙΚΏΝ ΠΟΣΟΤΉΤΩΝ ΚΑΙ ΤΗ ΡΎΘΜΙΣΗ ΣΕ ΠΡΑΓΜΑΤΙΚΌ ΧΡΌΝΟ ΤΩΝ ΕΓΚΑΤΑΣΤΆΣΕΩΝ ΚΑΙ ΤΟΥ ΕΞΟΠΛΙΣΜΟΎ ΔΙΚΤΎΟΥ. (Greek)
27 July 2022
0 references
DISTRIBUČNÉ SÚSTAVY PREVÁDZKOVANÉ KÚPEĽMI ABBANOA BOLI PREDMETOM NEDÁVNYCH PÔŽIČIEK POSKYTNUTÝCH SPOLOČNOSŤOU ABBANOA. CIPE 27/2015 A DC N.8 Z 10. APRÍLA 2014 ZAMERANÉ NA MODERNIZÁCIU VODNÝCH SIETÍ NAHRADENÍM STARÝCH. DOKONČENIE OPATRENÍ NA OBMEDZENIE STRÁT VODY SI VYŽADUJE OPAKOVANIE AKTIVÁCIE ROZSIAHLEJ SIETE AKTÍVNEHO MONITOROVANIA A KONTROLY PREVÁDZKY SIETÍ A ZARIADENÍ S CIEĽOM OPTIMALIZOVAŤ RIADIACE ČINNOSTI A ZACHOVAŤ VÝSLEDKY DOSIAHNUTÉ V PRIEBEHU ČASU. PLÁNUJE SA UMIESTNIŤ NAJMENEJ 1500 VZDIALENÝCH ODĽAHLÝCH REGIÓNOV V REGIONÁLNOM MERADLE VYBAVENÝCH MERAČMI A PRENOSOVÝMI SÚSTAVAMI PRIPOJENÝMI K ÚSTREDNÉMU DOZORNÉMU ORGÁNU, KTORÝ POUŽÍVA ABBANOA (ABBANOA), S CIEĽOM VYKONÁVAŤ MONITOROVANIE HYDRAULICKÝCH MNOŽSTIEV A REGULÁCIU SIEŤOVÝCH ZARIADENÍ A ZARIADENÍ V REÁLNOM ČASE. (Slovak)
27 July 2022
0 references
ABBANOA SPA:N KÄYTTÄMÄT JAKELUJÄRJESTELMÄT OVAT OLLEET ABBANOA-YHTIÖN ÄSKETTÄIN MYÖNTÄMIEN LAINOJEN KOHTEENA. CIPE 27/2015 JA DC N.8, 10.4.2014, TAVOITTEENA VESIVERKOSTOJEN PARANTAMINEN KORVAAMALLA VANHAT VESIVERKOT. VESIHÄVIKIN HILLITSEMISEEN TÄHTÄÄVIEN TOIMIEN LOPPUUN SAATTAMINEN EDELLYTTÄÄ VERKKOJEN JA LAITTEISTOJEN TOIMINNAN AKTIIVISEN SEURANNAN JA VALVONNAN LAAJAA VERKOSTOA, JONKA TAVOITTEENA ON OPTIMOIDA HALLINTATOIMET JA SÄILYTTÄÄ AJAN MITTAAN SAAVUTETUT TULOKSET. SUUNNITTEILLA ON SIJOITTAA VÄHINTÄÄN 1500 SYRJÄISTÄ ALUETTA ALUEELLISESSA MITTAKAAVASSA, JOTKA ON VARUSTETTU MITTAREILLA JA SIIRTOJÄRJESTELMILLÄ, JOTKA ON LIITETTY KESKUSVALVOJAN KANSSA ABBANOAN (ABBANOA) KANSSA, JOTTA VOIDAAN VALVOA HYDRAULISIA MÄÄRIÄ JA VERKKOLAITTEISTOJEN JA -LAITTEIDEN REAALIAIKAISTA SÄÄNTELYÄ. (Finnish)
27 July 2022
0 references
SYSTEMY DYSTRYBUCYJNE OBSŁUGIWANE PRZEZ ABBANOA SPA BYŁY PRZEDMIOTEM NIEDAWNYCH POŻYCZEK UDZIELONYCH PRZEZ SPÓŁKĘ ABBANOA. CIPE 27/2015 I DC N.8 Z DNIA 10 KWIETNIA 2014 R. MIAŁY NA CELU MODERNIZACJĘ SIECI WODOCIĄGOWYCH POPRZEZ ZASTĄPIENIE STARYCH SIECI. ZAKOŃCZENIE DZIAŁAŃ MAJĄCYCH NA CELU OGRANICZENIE STRAT WODY WYMAGA POWIELENIA URUCHOMIENIA ROZLEGŁEJ SIECI AKTYWNEGO MONITOROWANIA I KONTROLI EKSPLOATACJI SIECI I INSTALACJI W CELU OPTYMALIZACJI DZIAŁAŃ W ZAKRESIE ZARZĄDZANIA I ZACHOWANIA WYNIKÓW OSIĄGNIĘTYCH W CZASIE. PLANUJE SIĘ UMIESZCZENIE CO NAJMNIEJ 1500 ODLEGŁYCH REGIONÓW PERYFERYJNYCH NA SKALĘ REGIONALNĄ, WYPOSAŻONYCH W LICZNIKI I SYSTEMY PRZESYŁOWE POŁĄCZONE Z CENTRALNYM PRZEŁOŻONYM WYKORZYSTYWANYCH Z ABBANOA (ABBANOA), W CELU MONITOROWANIA ILOŚCI HYDRAULICZNYCH I REGULACJI W CZASIE RZECZYWISTYM OBIEKTÓW I URZĄDZEŃ SIECIOWYCH. (Polish)
27 July 2022
0 references
AZ ABBANOA SPA ÁLTAL MŰKÖDTETETT ELOSZTÓRENDSZEREK AZ ABBANOA VÁLLALAT ÁLTAL A KÖZELMÚLTBAN NYÚJTOTT KÖLCSÖNÖK TÁRGYÁT KÉPEZTÉK. A CIPE 27/2015 ÉS A DC N.8 (2014. ÁPRILIS 10.) CÉLJA A VÍZHÁLÓZATOK KORSZERŰSÍTÉSE A RÉGIEK FELVÁLTÁSA RÉVÉN. A VÍZVESZTESÉGEK MEGFÉKEZÉSÉT CÉLZÓ INTÉZKEDÉSEK VÉGREHAJTÁSÁHOZ MEG KELL ISMÉTELNI A HÁLÓZATOK ÉS LÉTESÍTMÉNYEK MŰKÖDÉSÉNEK AKTÍV NYOMON KÖVETÉSÉRE ÉS ELLENŐRZÉSÉRE SZOLGÁLÓ KITERJEDT HÁLÓZAT AKTIVÁLÁSÁT AZZAL A CÉLLAL, HOGY OPTIMALIZÁLJÁK A GAZDÁLKODÁSI TEVÉKENYSÉGEKET ÉS MEGŐRIZZÉK AZ ELÉRT EREDMÉNYEKET. A TERVEK SZERINT AZ ABBANOA-VAL (ABBANOA) MŰKÖDŐ KÖZPONTI FELÜGYELETTEL ÖSSZEKAPCSOLT MÉRŐKKEL ÉS ÁTVITELI RENDSZEREKKEL FELSZERELT, LEGALÁBB 1500 TÁVOLI LEGKÜLSŐ RÉGIÓ REGIONÁLIS SZINTEN HELYEZKEDIK EL ANNAK ÉRDEKÉBEN, HOGY ELVÉGEZZÉK A HIDRAULIKUS MENNYISÉGEK ELLENŐRZÉSÉT ÉS A HÁLÓZATI LÉTESÍTMÉNYEK ÉS BERENDEZÉSEK VALÓS IDEJŰ SZABÁLYOZÁSÁT. (Hungarian)
27 July 2022
0 references
DISTRIBUČNÍ SYSTÉMY PROVOZOVANÉ LÁZNĚMI ABBANOA BYLY PŘEDMĚTEM NEDÁVNÝCH PŮJČEK POSKYTNUTÝCH SPOLEČNOSTÍ ABBANOA. CIPE 27/2015 A DC N.8 ZE DNE 10. DUBNA 2014 SE ZAMĚŘILY NA MODERNIZACI VODOVODNÍCH SÍTÍ NAHRAZENÍM STARÝCH SÍTÍ. DOKONČENÍ OPATŘENÍ K OMEZENÍ ZTRÁT VODY VYŽADUJE ZOPAKOVÁNÍ AKTIVACE ROZSÁHLÉ SÍTĚ AKTIVNÍHO MONITOROVÁNÍ A KONTROLY PROVOZU SÍTÍ A ZAŘÍZENÍ S CÍLEM OPTIMALIZOVAT ČINNOSTI ŘÍZENÍ A ZACHOVAT DOSAŽENÉ VÝSLEDKY V PRŮBĚHU ČASU. PLÁNUJE SE UMÍSTĚNÍ NEJMÉNĚ 1500 VZDÁLENÝCH ODLEHLÝCH REGIONŮ V REGIONÁLNÍM MĚŘÍTKU VYBAVENÝCH MĚŘIČI A PŘENOSOVÝMI SYSTÉMY SPOJENÝMI S ÚSTŘEDNÍM ORGÁNEM DOHLEDU, KTERÝ POUŽÍVÁ ABBANOA (ABBANOA), ABY BYLO MOŽNÉ SLEDOVAT HYDRAULICKÉ VELIČINY A REGULACI SÍŤOVÝCH ZAŘÍZENÍ A ZAŘÍZENÍ V REÁLNÉM ČASE. (Czech)
27 July 2022
0 references
ABBANOA SPA PĀRVALDĪTAJĀM IZPLATĪŠANAS SISTĒMĀM NESEN TIKA PIEŠĶIRTI AIZDEVUMI, KO PIEŠĶĪRA UZŅĒMUMS ABBANOA. CIPE 27/2015 UN DC N.8, 10.04.2014., KURU MĒRĶIS IR MODERNIZĒT ŪDENS TĪKLUS, AIZSTĀJOT VECOS TĪKLUS. LAI PABEIGTU DARBĪBAS, KURU MĒRĶIS IR IEROBEŽOT ŪDENS ZUDUMUS, IR JĀATKĀRTO PLAŠA TĪKLA AKTIVIZĒŠANA, KURĀ AKTĪVI UZRAUGA UN KONTROLĒ TĪKLU UN IEKĀRTU DARBĪBU, LAI OPTIMIZĒTU APSAIMNIEKOŠANAS DARBĪBAS UN SAGLABĀTU LAIKA GAITĀ SASNIEGTOS REZULTĀTUS. IR PLĀNOTS IZVIETOT VISMAZ 1500 ATTĀLĀKOS REĢIONUS REĢIONĀLĀ MĒROGĀ, KAS APRĪKOTI AR SKAITĪTĀJIEM UN PĀRVADES SISTĒMĀM, KURAS SAVIENOTAS AR CENTRĀLO UZRAUDZĪTĀJU UN KURAS IZMANTO KOPĀ AR ABBANOA (ABBANOA), LAI VEIKTU HIDRAULISKO DAUDZUMU UZRAUDZĪBU UN TĪKLA IEKĀRTU UN IEKĀRTU REĀLLAIKA REGULĒŠANU. (Latvian)
27 July 2022
0 references
BHÍ CÓRAIS DÁILEACHÁIN ARNA N-OIBRIÚ AG ABBANOA SPA INA N-ÁBHAR D’IASACHTAÍ A DHEONAIGH AN CHUIDEACHTA ABBANOA LE DÉANAÍ. CIPE 27/2015 AGUS DC N.8 AN 10.04.2014, DÍRITHE AR NA LÍONRAÍ UISCE A UASGHRÁDÚ TRÍ SHEANLÍONRAÍ A ATHSHOLÁTHAR. CHUN GNÍOMHAÍOCHTAÍ A CHUR I GCRÍCH CHUN CAILLTEANAIS UISCE A SHRIANADH, IS GÁ MACASAMHLÚ A DHÉANAMH AR GHNÍOMHACHTÚ LÍONRA FHAIRSING FAIREACHÁIN AGUS RIALAITHE GHNÍOMHAIGH AR OIBRIÚ LÍONRAÍ AGUS SUITEÁLACHA, D’FHONN NA GNÍOMHAÍOCHTAÍ BAINISTÍOCHTA A BHARRFHEABHSÚ AGUS NA TORTHAÍ A BAINEADH AMACH LE HIMEACHT AMA A CHAOMHNÚ. TÁ SÉ BEARTAITHE 1500 RÉIGIÚN IARGÚLTA AR A LAGHAD A SHUÍ AR SCÁLA RÉIGIÚNACH, ATÁ FEISTITHE LE MÉADAIR AGUS CÓRAIS TARCHURTHA ATÁ NASCTHA LEIS AN MAOIRSEOIR LÁRNACH IN ÚSÁID LE ABBANOA (ABBANOA), CHUN FAIREACHÁN A DHÉANAMH AR CHAINNÍOCHTAÍ HIODRÁLACHA AGUS AR RIALÁIL FÍOR-AMA AR SHAORÁIDÍ AGUS AR THREALAMH LÍONRA. (Irish)
27 July 2022
0 references
DISTRIBUCIJSKI SISTEMI, KI JIH UPRAVLJA ABBANOA SPA, SO BILI PREDMET NEDAVNIH POSOJIL, KI JIH JE ODOBRILA DRUŽBA ABBANOA. CIPE 27/2015 IN DC N.8 Z DNE 10. APRILA 2014 STA BILA NAMENJENA NADGRADNJI VODNIH OMREŽIJ Z ZAMENJAVO STARIH. ZA DOKONČANJE UKREPOV ZA ZAJEZITEV IZGUB VODE JE POTREBNA PONOVITEV AKTIVACIJE OBSEŽNE MREŽE AKTIVNEGA SPREMLJANJA IN NADZORA OBRATOVANJA OMREŽIJ IN NAPRAV, DA BI OPTIMIZIRALI UPRAVLJAVSKE DEJAVNOSTI IN OHRANILI DOSEŽENE REZULTATE. NAČRTUJE SE NAMESTITEV VSAJ 1500 ODDALJENIH REGIJ NA REGIONALNI RAVNI, OPREMLJENIH S ŠTEVCI IN PRENOSNIMI SISTEMI, KI SO POVEZANI S CENTRALNIM NADZORNIKOM V UPORABI Z ABBANOO (ABBANOA), ZA SPREMLJANJE HIDRAVLIČNIH KOLIČIN IN REGULACIJO OMREŽNIH NAPRAV IN OPREME V REALNEM ČASU. (Slovenian)
27 July 2022
0 references
РАЗПРЕДЕЛИТЕЛНИТЕ СИСТЕМИ, УПРАВЛЯВАНИ ОТ ABBANOA SPA, СА БИЛИ ПРЕДМЕТ НА СКОРОШНИ ЗАЕМИ, ОТПУСНАТИ ОТ ДРУЖЕСТВОТО ABBANOA. CIPE 27/2015 И DC N.8 ОТ 10.4.2014 Г., НАСОЧЕНИ КЪМ МОДЕРНИЗИРАНЕ НА ВОДОСНАБДИТЕЛНИТЕ МРЕЖИ ЧРЕЗ ЗАМЯНА НА СТАРИТЕ. ИЗПЪЛНЕНИЕТО НА ДЕЙСТВИЯТА ЗА ОГРАНИЧАВАНЕ НА ЗАГУБИТЕ НА ВОДА ИЗИСКВА ВЪЗПРОИЗВЕЖДАНЕ НА АКТИВИРАНЕТО НА ШИРОКА МРЕЖА ЗА АКТИВЕН МОНИТОРИНГ И КОНТРОЛ НА ЕКСПЛОАТАЦИЯТА НА МРЕЖИТЕ И ИНСТАЛАЦИИТЕ, С ЦЕЛ ОПТИМИЗИРАНЕ НА УПРАВЛЕНСКИТЕ ДЕЙНОСТИ И ЗАПАЗВАНЕ НА ПОСТИГНАТИТЕ С ТЕЧЕНИЕ НА ВРЕМЕТО РЕЗУЛТАТИ. ПЛАНИРА СЕ ДА СЕ ПОЗИЦИОНИРАТ НАЙ-МАЛКО 1500 ОТДАЛЕЧЕНИ ОТДАЛЕЧЕНИ РЕГИОНА В РЕГИОНАЛЕН МАЩАБ, ОБОРУДВАНИ С ИЗМЕРВАТЕЛНИ УРЕДИ И ПРЕНОСНИ СИСТЕМИ, СВЪРЗАНИ С ЦЕНТРАЛНИЯ НАДЗОРЕН ОРГАН, КОЙТО СЕ ИЗПОЛЗВА С ABBANOA (ABBANOA), ЗА ДА СЕ ИЗВЪРШИ МОНИТОРИНГ НА ХИДРАВЛИЧНИТЕ КОЛИЧЕСТВА И РЕГУЛИРАНЕ В РЕАЛНО ВРЕМЕ НА МРЕЖОВИТЕ СЪОРЪЖЕНИЯ И ОБОРУДВАНЕ. (Bulgarian)
27 July 2022
0 references
IS-SISTEMI TA’ DISTRIBUZZJONI OPERATI MINN ABBANOA SPA KIENU S-SUĠĠETT TA’ SELF REĊENTI MOGĦTI MILL-KUMPANIJA ABBANOA. CIPE 27/2015 U DC N.8 TAL-10.04.2014, KELLHOM L-GĦAN LI JAĠĠORNAW IN-NETWERKS TAL-ILMA BILLI JISSOSTITWIXXU DAWK QODMA. IT-TLESTIJA TAL-AZZJONIJIET BIEX JITRAŻŻAN IT-TELF TAL-ILMA TEĦTIEĠ REPLIKAZZJONI TAL-ATTIVAZZJONI TA’ NETWERK ESTENSIV TA’ MONITORAĠĠ ATTIV U KONTROLL TAL-OPERAT TAN-NETWERKS U L-INSTALLAZZJONIJIET, BIL-GĦAN LI JIĠU OTTIMIZZATI L-ATTIVITAJIET TA’ ĠESTJONI U JIĠU PPRESERVATI R-RIŻULTATI MIKSUBA MATUL IŻ-ŻMIEN. HUWA PPJANAT LI JIĠU PPOŻIZZJONATI MILL-INQAS 1500 REĠJUN PERIFERIKU MILL-BOGĦOD FUQ SKALA REĠJONALI, MGĦAMMRA B’MITERS U SISTEMI TA’ TRAŻMISSJONI KONNESSI MAS-SUPERVIŻUR ĊENTRALI LI JINTUŻAW MAL-ABBANOA (ABBANOA), SABIEX JITWETTAQ IL-MONITORAĠĠ TAL-KWANTITAJIET IDRAWLIĊI U R-REGOLAMENTAZZJONI F’ĦIN REALI TAL-FAĊILITAJIET U T-TAGĦMIR TAN-NETWERK. (Maltese)
27 July 2022
0 references
OS SISTEMAS DE DISTRIBUIÇÃO EXPLORADOS PELA ABBANOA SPA FORAM OBJETO DE EMPRÉSTIMOS RECENTES CONCEDIDOS PELA EMPRESA ABBANOA. A CIPE 27/2015 E A DC N.8 DE 10.04.2014, VISAVAM A MODERNIZAÇÃO DAS REDES DE ÁGUA, SUBSTITUINDO AS ANTIGAS. A REALIZAÇÃO DE AÇÕES PARA CONTER AS PERDAS DE ÁGUA REQUER A REPLICAÇÃO DA ATIVAÇÃO DE UMA EXTENSA REDE DE MONITORAMENTO E CONTROLE ATIVO DA OPERAÇÃO DE REDES E INSTALAÇÕES, COM O OBJETIVO DE OTIMIZAR AS ATIVIDADES DE GESTÃO E PRESERVAR OS RESULTADOS ALCANÇADOS AO LONGO DO TEMPO. PREVÊ-SE POSICIONAR PELO MENOS 1500 REGIÕES PERIFÉRICAS REMOTAS À ESCALA REGIONAL, EQUIPADAS COM CONTADORES E SISTEMAS DE TRANSMISSÃO LIGADOS AO SUPERVISOR CENTRAL EM USO COM ABBANOA (ABBANOA), A FIM DE REALIZAR O MONITORAMENTO DAS QUANTIDADES HIDRÁULICAS E A REGULAÇÃO EM TEMPO REAL DAS INSTALAÇÕES E EQUIPAMENTOS DA REDE. (Portuguese)
27 July 2022
0 references
ABBANOA SPA'S DISTRIBUTIONSSYSTEMER HAR FOR NYLIG VÆRET GENSTAND FOR LÅN YDET AF SELSKABET ABBANOA. CIPE 27/2015 OG DC N.8 AF 10.4.2014, DER HAR TIL FORMÅL AT OPGRADERE VANDNETTENE VED AT ERSTATTE DE GAMLE. GENNEMFØRELSEN AF FORANSTALTNINGER TIL BEGRÆNSNING AF VANDSPILD KRÆVER GENTAGELSE AF AKTIVERINGEN AF ET OMFATTENDE NETVÆRK AF AKTIV OVERVÅGNING OG KONTROL AF DRIFTEN AF NET OG ANLÆG MED HENBLIK PÅ AT OPTIMERE FORVALTNINGSAKTIVITETERNE OG BEVARE DE OPNÅEDE RESULTATER OVER TID. DET ER PLANEN AT PLACERE MINDST 1500 FJERNTLIGGENDE REGIONER PÅ REGIONALT PLAN, UDSTYRET MED MÅLERE OG TRANSMISSIONSSYSTEMER, DER ER FORBUNDET MED DEN CENTRALE TILSYNSFØRENDE, OG SOM ER I BRUG MED ABBANOA (ABBANOA), MED HENBLIK PÅ AT FORETAGE OVERVÅGNING AF HYDRAULISKE MÆNGDER OG REALTIDSREGULERING AF NETFACILITETER OG -UDSTYR. (Danish)
27 July 2022
0 references
SISTEMELE DE DISTRIBUȚIE OPERATE DE ABBANOA SPA AU FĂCUT OBIECTUL UNOR ÎMPRUMUTURI RECENTE ACORDATE DE SOCIETATEA ABBANOA. CIPE 27/2015 ȘI DC N.8 DIN 10.4.2014 AU VIZAT MODERNIZAREA REȚELELOR DE APĂ PRIN ÎNLOCUIREA CELOR VECHI. FINALIZAREA ACȚIUNILOR DE LIMITARE A PIERDERILOR DE APĂ NECESITĂ REPLICAREA ACTIVĂRII UNEI REȚELE EXTINSE DE MONITORIZARE ȘI CONTROL ACTIV AL EXPLOATĂRII REȚELELOR ȘI INSTALAȚIILOR, CU SCOPUL DE A OPTIMIZA ACTIVITĂȚILE DE GESTIONARE ȘI DE A PĂSTRA REZULTATELE OBȚINUTE ÎN TIMP. SE PRECONIZEAZĂ POZIȚIONAREA LA SCARĂ REGIONALĂ A CEL PUȚIN 1500 DE REGIUNI PERIFERICE ÎNDEPĂRTATE, ECHIPATE CU CONTOARE ȘI SISTEME DE TRANSMISIE CONECTATE CU SUPRAVEGHETORUL CENTRAL AFLAT ÎN UZ CU ABBANOA (ABBANOA), ÎN VEDEREA MONITORIZĂRII CANTITĂȚILOR HIDRAULICE ȘI A REGLEMENTĂRII ÎN TIMP REAL A INSTALAȚIILOR ȘI ECHIPAMENTELOR DE REȚEA. (Romanian)
27 July 2022
0 references
DE DISTRIBUTIONSSYSTEM SOM DRIVS AV ABBANOA SPA HAR NYLIGEN BEVILJATS LÅN FRÅN FÖRETAGET ABBANOA. CIPE 27/2015 OCH DC N.8 AV DEN 10 APRIL 2014 SYFTADE TILL ATT UPPGRADERA VATTENNÄTEN GENOM ATT ERSÄTTA GAMLA. SLUTFÖRANDET AV ÅTGÄRDER FÖR ATT BEGRÄNSA VATTENFÖRLUSTER KRÄVER ATT ETT OMFATTANDE NÄTVERK FÖR AKTIV ÖVERVAKNING OCH KONTROLL AV DRIFTEN AV NÄT OCH ANLÄGGNINGAR UPPREPAS, I SYFTE ATT OPTIMERA FÖRVALTNINGSVERKSAMHETEN OCH BEVARA DE RESULTAT SOM UPPNÅTTS ÖVER TIDEN. MAN PLANERAR ATT PLACERA MINST 1 500 AVLÄGSET BELÄGNA REGIONER PÅ REGIONAL NIVÅ, UTRUSTADE MED MÄTARE OCH ÖVERFÖRINGSSYSTEM SOM ÄR ANSLUTNA TILL DEN CENTRALA ÖVERVAKAREN I ABBANOA (ABBANOA), FÖR ATT ÖVERVAKA HYDRAULISKA MÄNGDER OCH REALTIDSREGLERING AV NÄTANLÄGGNINGAR OCH NÄTUTRUSTNING. (Swedish)
27 July 2022
0 references
TUTTI I COMUNI
0 references
Identifiers
E74H14001340002
0 references