CONSTRUCTION OF A PARAMASSI TUNNEL — LOT SP 31 OF RIPA (Q2040752): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,)
(‎Changed an Item: Discontinued project)
 
Property / instance of: Kohesio project / rankProperty / instance of: Kohesio project / rank
Normal rank
Deprecated rank
Property / instance of
 
Property / instance of: Discontinued Kohesio Project / rank
 
Normal rank

Latest revision as of 18:36, 8 April 2023

Project Q2040752 in Italy
Language Label Description Also known as
English
CONSTRUCTION OF A PARAMASSI TUNNEL — LOT SP 31 OF RIPA
Project Q2040752 in Italy

    Statements

    0 references
    1,347,934.74 Euro
    0 references
    3,207,000.0 Euro
    0 references
    42.03 percent
    0 references
    7 March 2016
    0 references
    31 December 2019
    0 references
    REGIONE LIGURIA
    0 references
    0 references
    0 references

    44°8'30.08"N, 9°53'19.28"E
    0 references
    REALIZZAZIONE DEL PRIMO LOTTO DELLA S.P.31 STRADA DELLA RIPA NEL TRATTO CHIUSO AL TRAFFICO DAL 17 AGOSTO 2015 (SP) E OGGI RIAPERTO A SENSO UNICO ALTERNATO (Italian)
    0 references
    IMPLEMENTATION OF THE FIRST BATCH OF THE RIPA ROAD IN THE CLOSED SECTION OF THE TRAFFIC FROM 17 AUGUST 2015 (SP) AND NOW REOPENED ON A SOLE ALTERNATE BASIS (English)
    0 references
    RÉALISATION DU PREMIER LOT DE LA ROUTE S.P.31 RIPA DANS LE TRONÇON FERMÉ À LA CIRCULATION À PARTIR DU 17 AOÛT 2015 (SP) ET MAINTENANT ROUVERT EN ALTERNANCE ALLER SIMPLE (French)
    16 December 2021
    0 references
    REALISATIE VAN HET EERSTE PERCEEL VAN DE S.P.31 RIPA WEG IN HET GEDEELTE AFGESLOTEN VOOR VERKEER VANAF 17 AUGUSTUS 2015 (SP) EN NU OPNIEUW GEOPEND IN AFWISSELEND EENRICHTINGSVERKEER (Dutch)
    23 December 2021
    0 references
    REALISIERUNG DES ERSTEN LOSES DER S.P.31 RIPA STRASSE IM ABSCHNITT GESCHLOSSEN FÜR DEN VERKEHR AB DEM 17. AUGUST 2015 (SP) UND NUN WIEDER IN WECHSELNDER EINBAHN WIEDER GEÖFFNET (German)
    24 December 2021
    0 references
    REALIZACIÓN DEL PRIMER LOTE DE LA CARRETERA S.P.31 RIPA EN EL TRAMO CERRADO AL TRÁFICO DEL 17 DE AGOSTO DE 2015 (SP) Y AHORA REABIERTO EN UNA SOLA VÍA ALTERNADA (Spanish)
    25 January 2022
    0 references
    GENNEMFØRELSE AF DEN FØRSTE DEL AF RIPA-VEJEN I DEN LUKKEDE DEL AF TRAFIKKEN FRA DEN 17. AUGUST 2015 (SP) OG NU GENÅBNET PÅ EN ENKELT ALTERNATIV BASIS (Danish)
    5 July 2022
    0 references
    ΕΦΑΡΜΟΓΉ ΤΗΣ ΠΡΏΤΗΣ ΠΑΡΤΊΔΑΣ ΤΗΣ ΟΔΟΎ RIPA ΣΤΟ ΚΛΕΙΣΤΌ ΤΜΉΜΑ ΤΗΣ ΚΥΚΛΟΦΟΡΊΑΣ ΑΠΌ ΤΙΣ 17 ΑΥΓΟΎΣΤΟΥ 2015 (SP) ΚΑΙ ΠΛΈΟΝ ΞΑΝΑΝΟΊΧΤΗΚΕ ΣΕ ΜΟΝΑΔΙΚΉ ΕΝΑΛΛΑΚΤΙΚΉ ΒΆΣΗ (Greek)
    5 July 2022
    0 references
    PROVEDBA PRVE SERIJE CESTE RIPA U ZATVORENOM DIJELU PROMETA OD 17. KOLOVOZA 2015. (SP) I SADA PONOVNO OTVORENA NA SAMOJ ALTERNATIVNOJ OSNOVI (Croatian)
    5 July 2022
    0 references
    PUNEREA ÎN APLICARE A PRIMULUI LOT AL DRUMULUI RIPA ÎN SECȚIUNEA ÎNCHISĂ A TRAFICULUI ÎNCEPÂND CU 17 AUGUST 2015 (SP) ȘI REDESCHISĂ ÎN PREZENT PE BAZĂ ALTERNATIVĂ UNICĂ (Romanian)
    5 July 2022
    0 references
    REALIZÁCIA PRVEJ SÉRIE CESTY RIPA V UZAVRETOM ÚSEKU DOPRAVY OD 17. AUGUSTA 2015 (SP) A TERAZ SA ZNOVU OTVORILA AKO JEDINÁ ALTERNATÍVA (Slovak)
    5 July 2022
    0 references
    L-IMPLIMENTAZZJONI TAL-EWWEL LOTT TAT-TRIQ RIPA FIS-SEZZJONI MAGĦLUQA TAT-TRAFFIKU MIS-17 TA’ AWWISSU 2015 (SP) U ISSA NFETAĦ MILL-ĠDID FUQ BAŻI ALTERNATTIVA UNIKA (Maltese)
    5 July 2022
    0 references
    IMPLEMENTAÇÃO DO PRIMEIRO LOTE DA ESTRADA RIPA NO TROÇO FECHADO DO TRÁFEGO A PARTIR DE 17 DE AGOSTO DE 2015 (SP) E AGORA REABERTO NUMA BASE ÚNICA ALTERNATIVA (Portuguese)
    5 July 2022
    0 references
    RIPA-TIEN ENSIMMÄISEN ERÄN TOTEUTTAMINEN LIIKENTEEN SULJETULLA OSUUDELLA 17. ELOKUUTA 2015 ALKAEN (SP) JA NYT AVATTU UUDELLEEN AINOANA VAIHTOEHTONA (Finnish)
    5 July 2022
    0 references
    REALIZACJA PIERWSZEJ PARTII DROGI RIPA NA ZAMKNIĘTYM ODCINKU RUCHU OD 17 SIERPNIA 2015 R. (SP), A OBECNIE PONOWNIE OTWARTA NA ZASADZIE JEDYNEJ ALTERNATYWY (Polish)
    5 July 2022
    0 references
    IZVEDBA PRVEGA SKLOPA CESTE RIPA V ZAPRTEM ODSEKU PROMETA OD 17. AVGUSTA 2015 (SP) IN JE BILA ZDAJ PONOVNO ODPRTA IZKLJUČNO IZMENIČNO (Slovenian)
    5 July 2022
    0 references
    REALIZACE PRVNÍ SÉRIE SILNICE RIPA V UZAVŘENÉM ÚSEKU DOPRAVY OD 17. SRPNA 2015 (SP) A NYNÍ ZNOVU OTEVŘENA POUZE NA ALTERNATIVNÍM ZÁKLADĚ (Czech)
    5 July 2022
    0 references
    PIRMOJO KELIO RIPA PAKETO ĮGYVENDINIMAS UŽDAROJE EISMO ATKARPOJE NUO 2015 M. RUGPJŪČIO 17 D. (SP) IR DABAR ATNAUJINAMAS TIK PAKAITINIU PAGRINDU (Lithuanian)
    5 July 2022
    0 references
    RIPA CEĻA PIRMĀS PARTIJAS ĪSTENOŠANA SLĒGTĀ SATIKSMES POSMĀ NO 2015. GADA 17. AUGUSTA (SP) UN TAGAD TIEK ATSĀKTA TIKAI PĒC KĀRTAS (Latvian)
    5 July 2022
    0 references
    ВЪВЕЖДАНЕ НА ПЪРВАТА ПАРТИДА ОТ ПЪТЯ „РИПА“ В ЗАТВОРЕНИЯ УЧАСТЪК ОТ ТРАФИКА, СЧИТАНО ОТ 17 АВГУСТ 2015 Г. (SP), И СЕГА Е ПОДНОВЕНО ЕДИНСТВЕНО НА АЛТЕРНАТИВНА ОСНОВА (Bulgarian)
    5 July 2022
    0 references
    A RIPA ÚT ELSŐ TÉTELÉNEK MEGVALÓSÍTÁSA A FORGALOM LEZÁRT SZAKASZÁN 2015. AUGUSZTUS 17-TŐL (SP), ÉS MOST EGYETLEN ALTERNATÍV MÓDON ÚJRA MEGNYITVA (Hungarian)
    5 July 2022
    0 references
    CUR I BHFEIDHM AN CHÉAD BHAISC DE BHÓTHAR RIPA SA CHUID DÚNTA DEN TRÁCHT ÓN 17 LÚNASA 2015 (SP) AGUS A ATHOSCLAÍODH ANOIS AR BHONN MALARTACH AMHÁIN (Irish)
    5 July 2022
    0 references
    GENOMFÖRANDE AV DEN FÖRSTA OMGÅNGEN AV RIPA-VÄGEN I DEN STÄNGDA DELEN AV TRAFIKEN FRÅN OCH MED DEN 17 AUGUSTI 2015 (SP) OCH NU ÅTERÖPPNAS PÅ ANNAT SÄTT (Swedish)
    5 July 2022
    0 references
    RIPA TEE ESIMESE PARTII RAKENDAMINE LIIKLUSE SULETUD OSAS ALATES 17. AUGUSTIST 2015 (SP) JA NÜÜD TAASAVATUD ALTERNATIIVSELT (Estonian)
    5 July 2022
    0 references
    VEZZANO LIGURE
    0 references

    Identifiers

    G27H17001030003
    0 references