“Construction of a photovoltaic installation in a lifting capacity in a marina 15 street” (Q137809): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): The project involves the construction of two photovoltaic installations which will constitute generating sets with renewable energy. The installations in question will have the following power: Installation of PV 1: 49,91 kWp installation PV 2: 49,91 kWp will generate electricity for their own account by the assumption of blocking the flow of electricity to the public electricity grid with the possibility to donate surplus electricity to the pub...) |
(Changed an Item) |
||
Property / programme | |||
Property / programme: Zachodniomorskie Voivodeship - ERDF/ESF / rank | |||
Normal rank |
Revision as of 19:39, 26 March 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | “Construction of a photovoltaic installation in a lifting capacity in a marina 15 street” |
Project in Poland financed by DG Regio |
Statements
426,966.11 zloty
0 references
800,504.91 zloty
0 references
83.0 percent
0 references
21 April 2016
0 references
30 June 2019
0 references
WOSIK KRZYSZTOF WEKAA-1
0 references
Przedmiotem projektu jest budowa dwóch instalacji fotowoltaicznych, które będą stanowiły zespoły prądotwórcze wykorzystujące energię odnawialną. Przedmiotowe instalacje będą miały moc: Instalacja PV 1: 49,91 kWp Instalacja PV 2: 49,91 kWp Instalacje wytwarzać będą energię elektryczną w całości na potrzeby własne poprzez założenie blokady wypływu energii elektrycznej do publicznej sieci elektrycznej z możliwością oddawania nadwyżek energii elektrycznej do publicznej sieci elektro-energetycznej w przyszłości tj. po zakończeniu sezonu tj. po 30 września 2019 roku. W ramach projektu Wnioskodawca wykona roboty budowlane dotyczące dachu budynku socjalnego na którym zostanie zamontowana jedna z instalacji PV. Zakres rzeczowy projektu: - Sporządzenie studium wykonalności - Sporządzenie projektów 2 instalacji fotowoltaicznych - Montaż 2 instalacji fotowoltaicznych - Roboty budowlano montażowe i instalacyjne Sposób wdrażania Projekt będzie realizowany w formule „zaprojektuj i wybuduj”, która będzie obejmowała sporządzenie projektów 2 instalacji PV, wykonanie robót dotyczących dachu budynku socjalnego oraz montaż 2 instalacji PV. Projekt realizowany będzie w III etapach: I etap obejmujący przygotowanie dokumentacji projektu: studium wykonalności, projektów 2 instalacji PV II etap obejmujący wymianę/wzmocnienie konstrukcji dachowej wraz z pokryciem na budynku socjalnym oraz montaż instalacji fotowoltaicznej o mocy 43,4 kWp na dachu tego budynku oraz 6,51 kWp na dachu budynku usług turystycznych (całość utworzy 1 instalację PV o sumaryczne mocy 49,91 kWp). III etap obejmujący montaż instalacji fotowoltaicznej o mocy 45,26 kWp na dachu budynku usług turystycznych z częścią gastronomiczną oraz 4,65 kWp na dachu budynku usług turystycznych (całość utworzy 1 instalację PV o mocy 49,91 kWp). Projekt ma charakter stacjonarny i będzie realizowany na nieruchomości stanowiących współwłasność Wnioskodawcy. (Polish)
0 references
The project involves the construction of two photovoltaic installations which will constitute generating sets with renewable energy. The installations in question will have the following power: Installation of PV 1: 49,91 kWp installation PV 2: 49,91 kWp will generate electricity for their own account by the assumption of blocking the flow of electricity to the public electricity grid with the possibility to donate surplus electricity to the public electricity grid in the future, i.e. after the end of the season, i.e. after the end of the season, i.e. after 30 September 2019. As part of the project, the Applicant will perform construction work on the roof of the social building on which one of the PV installation will be installed. Material scope of the project: — Drawing up a feasibility study — Drawing up of projects 2 of the photovoltaic installation — Installation of 2 photovoltaic installations — construction works for the installation and installation of construction projects and installation of the project will be carried out under the ‘design and demolition’ formula which will involve the drawing up of projects for 2 PV installations, the carrying out of works on the roof of the social building and the installation of 2 PV installations. The project will be implemented in Phase III: And the preparation of project documentation: feasibility study, projects 2 PV II installation phase including replacement/reinforcement of roof structure with a cover on the social housing building and installation of a 43,4 kWp photovoltaic installation on the roof of the building and 6,51 kWp on the roof of the building service (all will create 1 PV with total power 49,91 kWp). A stage III involving the installation of a 45,26 kWp of a photovoltaic installation on the roof of a building service with the catering part and 4,65 kWp on the roof of a travel service building (the whole will create 1 installation of PV with a capacity of 49,91 kWp). The project is of a stationary nature and will be carried out on the real estate jointly owned by the Applicant. (English)
0 references
Identifiers
RPZP.02.10.00-32-B200/17
0 references