RECONSTRUCTION AND EXTENSION OF PART OF THE EXISTING SCHOOL TO THE PUBLIC PRE-SCHOOL (Q102354): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): OBJECT. DEVELOPMENT AND RECONSTRUCTION OF THE ZSO BUILDING IN ZAPPOLICACH FOR THE RUNNING OF THE KINDERGARTEN FOR 100 CHILDREN. THE PROJECT WILL CONTRIBUTE TO THE DIRECT OBJECTIVE OF DEVELOPING EDUCATIONAL SERVICES. THIS WILL BE ACHIEVED THROUGH CONSTRUCTION AND INSTALLATION WORKS, ASSEMBLY WITH EQUIPMENT AND EQUIPMENT AND TEACHING AIDS FOR THE OPERATION OF THE NURSERY. THE PROJECT FOR THE EXTENSION AND CONVERSION OF A BUILDING INCLUDES A TWO-ST...)
(‎Changed an Item)
Property / programme
 
Property / programme: ?ódzkie Voivodeship - ERDF/ESF / rank
 
Normal rank

Revision as of 17:20, 26 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
RECONSTRUCTION AND EXTENSION OF PART OF THE EXISTING SCHOOL TO THE PUBLIC PRE-SCHOOL
Project in Poland financed by DG Regio

    Statements

    0 references
    2,923,748.22 zloty
    0 references
    701,699.5728 Euro
    13 January 2020
    0 references
    4,495,286.95 zloty
    0 references
    1,078,868.868 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    8 February 2016
    0 references
    31 December 2019
    0 references
    GMINA ZAPOLICE
    0 references

    51°32'27.6"N, 18°52'55.6"E
    0 references
    PRZEDMIOTEM PROJ. BĘDZIE ROZBUDOWYA I PRZEBUDOWA BUDYNKU ZSO W ZAPOLICACH Z PRZEZNACZENIEM NA FUNKCJONOWANIE PRZEDSZKOLA DLA 100 DZIECI. PROJEKT PRZYCZYNI SIĘ DO OSIĄGNIĘCIA CELU BEZPOŚREDNIEGO, JAKIM JEST ROZWÓJ USŁUG EDUKACYJNYCH. OSIĄGNIĘCIE TEGO CELU BĘDZIE MOŻLIWE DZIĘKI REALIZACJI ROBÓT BUDOWLANO-INSTALACYJNYCH, MONTAŻOWYCH Z WYPOSAŻENIEM I DOPOSAŻENIEM W SPRZĘT I POMOCE DYDAKTYCZNE NA POTRZEBY FUNKCJONOWANIA PRZEDSZKOLA. PROJEKT ROZBUDOWY I PRZEBUDOWY BUDYNKU OBEJMUJE OBIEKT DWUKONDYGNACYJNY W CZĘŚCI PROJEKTOWANEJ, CZĘŚCIOWO PODPIWNICZONY W CZĘŚCI PRZEBUDOWYWANEJ JEDNOKONDYGNACYJNEJ. ISTNIEJĄCA SZKOŁA ZOSTANIE ROZBUDOWANA O PRZEDSZKOLE PUBLICZNE, A W CZĘŚCI PRZEBUDOWYWANEJ, KTÓRA BĘDZIE ŁĄCZNIKIEM POMIĘDZY SZKOŁĄ A PRZEDSZKOLEM ZLOKALIZOWANO POKÓJ DYREKTORA, POMIESZCZENIE DO PRACY INDYWIDUALNEJ Z DZIEĆMI, POKÓJ INTENDENTKI, MAGAZYN I SANITARIATY, W PIWNICY MAGAZYN, MAGAZYN Z KOTŁOWNIĄ.W CZĘŚCI DOBUDOWANEJ NA PARTERZE ZLOKALIZOWANO POMIESZCZENIE STOŁÓWKI Z WĘZŁEM KUCHENNYM, SALĘ GRUPY PRZEDSZKOLNEJ Z MAGAZYNEM I SANITARIATAMI, SZATNIE I POMIESZCZENIA POMOCNICZE. POZIOM ZERO POSADZKI PARTERU PROJEKTOWANEJ BUDOWY POSADOWIONY ZOSTANIE POWYŻEJ 30CM PONAD POZIOM TERENU, DLA POKONANIA RÓŻNICY WYSOKOŚCI – PROJEKTOWANE STOPNIE I POCHYLNIA DLA NIEPEŁNOSPRAWNYCH - ZEWNĘTRZNE. NA PIĘTRZE ZLOKALIZOWANO P. NAUCZYCIELI, POM. SOCJALNE, POM. GOSPOD. ORAZ TRZY SALE GRUP PRZEDSZKOLNYCH Z MAGAZYNAMI I SANITARIATAMI. CAŁY TEREN ORAZ BUDYNEK SĄ DOSTĘPNE DLA OS. NIEPEŁNOSPRAWNYCH POPRZEZ ZASTOSOWANE POCHYLNI ZEWNĘTRZNYCH ORAZ WINDY W BUDYNKU, OS. NIEPEŁNOSPRAWNA MA MOŻLIWOŚĆ DOSTANIA SIĘ SAMODZIELNIE NA WSZYSTKIE POZIOMY CO ZASPOKOI POTRZEBY DZIECI Z NIEPEŁNOSPRAWNOŚCIĄ W G. ZAPOLICE KTÓRE OBECNIE SĄ W WIEKU 4 LAT Z ODROCZONYM OBOWIAZKIEM NAUKI W SZKOLE. GRUPA DOCELOWA: 100 DZIECI WOJ. ŁÓDZKIEGO. ZADANIA:ZWIĘKSZENIE DOSTĘPNOŚCI I JAKOŚCI USŁUG SPOŁECZNYCH OGRANICZAJĄCYCH UBÓSTWO I WYKLUCZENIE SPOŁECZNE (Polish)
    0 references
    OBJECT. DEVELOPMENT AND RECONSTRUCTION OF THE ZSO BUILDING IN ZAPPOLICACH FOR THE RUNNING OF THE KINDERGARTEN FOR 100 CHILDREN. THE PROJECT WILL CONTRIBUTE TO THE DIRECT OBJECTIVE OF DEVELOPING EDUCATIONAL SERVICES. THIS WILL BE ACHIEVED THROUGH CONSTRUCTION AND INSTALLATION WORKS, ASSEMBLY WITH EQUIPMENT AND EQUIPMENT AND TEACHING AIDS FOR THE OPERATION OF THE NURSERY. THE PROJECT FOR THE EXTENSION AND CONVERSION OF A BUILDING INCLUDES A TWO-STOREY FACILITY IN THE PART OF THE DESIGN, IN PART IN PART WITH PART OF THE ROLLING STOCK INTEGRATED INTO THE STRUCTURE. THE EXISTING SCHOOL WILL BE EXTENDED TO INCLUDE A PUBLIC PRE-SCHOOL AND, IN PART, TO BE BUILT, WHICH WILL BE THE LINK BETWEEN THE SCHOOL AND THE PRE-SCHOOL, THE ROOM OF THE DIRECTOR, A ROOM FOR INDIVIDUAL WORK WITH CHILDREN, A ROOM FOR INTENDENTKI, THE WAREHOUSE AND THE SANITARY FACILITY, IN THE WAREHOUSE BASEMENT, A STORAGE FACILITY ON THE GROUND FLOOR, WOULD BE LOCATED WITH A KITCHEN HUB, A NURSERY ROOM WITH A MAGAZINE AND SANITARIATAMI, CHANGING ROOMS AND SUPPORT FACILITIES. THE GROUND FLOOR FOR THE GROUND FLOOR FOR THE PLANNED CONSTRUCTION WILL BE OVER 30 CM ABOVE THE LEVEL OF THE GROUND, TO OVERCOME THE HEIGHT DIFFERENCE, THE PROJECTED GRADES AND THE RAMP FOR DISABLED — EXTERNAL. THE FLOOR IS LOCATED ON THE FLOOR OF P. TEACHERS, OF THE POM. SOCIAL, POM. GOSSYPOL. AND THREE ROOMS FOR THE PRE-SCHOOL GROUP WITH THE STORAGE FACILITIES AND THE SANITIATI. THE WHOLE SITE AND THE BUILDING ARE AVAILABLE FOR THE OS. DISABLED THROUGH THE USE OF THE OUTER SLIPS AND LIFTS IN THE BUILDING, OS. DISABLED CHILDREN HAVE THE POSSIBILITY TO REACH ALL LEVELS ON THEIR OWN, IN ORDER TO MEET THE NEEDS OF CHILDREN WITH DISABILITIES IN G. ZPOLIIE, WHO ARE NOW AT THE AGE OF 4 WITH DEFERRED TUITION IN SCHOOL. AUDIENCE: 100 CHILDREN OF WJ. ŁÓDZKIE. TASKS: IMPROVING ACCESSIBILITY AND QUALITY OF SOCIAL SERVICES THAT REDUCE POVERTY AND SOCIAL EXCLUSION (English)
    0 references

    Identifiers

    RPLD.07.04.02-10-0018/16
    0 references