Reconstruction of street tracks in the streets: Wierzbinia and 28 June 1956 (Q86083): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): The project and the execution of the demolition works for the reconstruction of the double-track tram line in the streets of Wierzbęcice and on 28 June 1956 in Poznań.The project involves the reconstruction of:track infrastructure, network infrastructure, stop infrastructure, underground installations (as far as the technical conditions of networks are laid down) and those of pedestrians that are an integral part of the urban area of the streets...) |
(Changed an Item) |
||
Property / programme | |||
Property / programme: Infrastructure and Environment - PL - ERDF/CF / rank | |||
Normal rank |
Revision as of 14:30, 26 March 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Reconstruction of street tracks in the streets: Wierzbinia and 28 June 1956 |
Project in Poland financed by DG Regio |
Statements
27,253,606.26 zloty
0 references
62,805,288.0 zloty
0 references
53.42 percent
0 references
1 January 2014
0 references
31 December 2022
0 references
MIASTO POZNAŃ
0 references
Projekt oraz wykonawstwo robót budolwanych dla przebudowy dwutorowej trasy tramwajowej w ciągu ulic Wierzbięcice i 28 Czerwca 1956 r. w Poznaniu. Projekt zakłada przebudowę: infrastruktury torowej, infrastruktury sieciowej, infrastruktury przystankowej, instalacji podziemnych (w zakresie przewidzianym warunkami techn. gestorów sieci) też nawierzchni drogowych i ciągów pieszych stanowiących integralną część przestrzeni użytkowej ulic objętych zakresem projektu. (Polish)
0 references
The project and the execution of the demolition works for the reconstruction of the double-track tram line in the streets of Wierzbęcice and on 28 June 1956 in Poznań.The project involves the reconstruction of:track infrastructure, network infrastructure, stop infrastructure, underground installations (as far as the technical conditions of networks are laid down) and those of pedestrians that are an integral part of the urban area of the streets covered by the scope of the project. (English)
0 references
Identifiers
POIS.06.01.00-00-0036/16
0 references