Renovation of the former school in Goląca Upper with Change of Use (Q126055): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): The object of the project is the renovation and fitting-out of the building after the former school in Goląż of Upper Silesia with a change in the use of the building and the development of the site around the building. The aim of the project is to give new features to the degraded building and to the socio-economic development of the regeneration area. The project will carry out construction work inside and outside the building, including: repl...)
(‎Changed an Item)
Property / programme
 
Property / programme: ?l?skie Voivodeship - ERDF/ESF / rank
 
Normal rank

Revision as of 14:24, 26 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Renovation of the former school in Goląca Upper with Change of Use
Project in Poland financed by DG Regio

    Statements

    0 references
    547,589.16 zloty
    0 references
    131,421.3984 Euro
    13 January 2020
    0 references
    1,294,182.68 zloty
    0 references
    310,603.84319999994 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    25 February 2016
    0 references
    31 December 2021
    0 references
    GMINA PSARY
    0 references
    Przedmiotem projektu jest remont i wyposażenie budynku po byłej szkoły w Goląszy Górnej ze zmianą sposobu użytkowania oraz zagospodarowanie terenu wokół budynku. Celem projektu jest nadanie nowych funkcji zdegradowanemu budynkowi oraz rozwój społeczno-gospodarczego obszaru rewitalizacji. W ramach projektu zostaną przeprowadzone prace budowlane wewnątrz i na zewnątrz budynku, w tym: wymiana, remont instalacji elektrycznej, okablowania, włączników i gniazd, instalacja kanalizacji, remont sanitariatów, prace dotyczące zagospodarowania terenu przy budynku, wykonanie przyłączy wody oraz kanalizacji, a także wyposażenie budynku w niezbędne środki trwałe. Dzięki realizacji projektu możliwa będzie zmiana sposobu użytkowania budynku na cele społeczno-gospodarcze, w tym utworzenie klubu aktywnego mieszkańca, w ramach którego będzie działał klub seniora oraz bawialnia dla dzieci. (Polish)
    0 references
    The object of the project is the renovation and fitting-out of the building after the former school in Goląż of Upper Silesia with a change in the use of the building and the development of the site around the building. The aim of the project is to give new features to the degraded building and to the socio-economic development of the regeneration area. The project will carry out construction work inside and outside the building, including: replacement, repair of electrical installations, cables, switches and sockets, installation of drains, sanitation, building work on the building, construction of water connections and sanitation, as well as equipping the building with the necessary fixed assets. By implementing the project, it will be possible to change the way in which the building will be used for socio-economic purposes, including the creation of an active head club, in the course of which the elderly club and the children play an active club. (English)
    0 references

    Identifiers

    RPSL.10.03.01-24-0011/18
    0 references