Renovation of the building at ul. 1 May 83 in Wałbrzych (Q96263): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): The purpose of the project is to take measures to improve the technical condition of the building located in Wałbrzych at ul. 1 May 83. At present, the building is in a poor state, according to the technical review, the technical consumption of the plant is 54.12 %. This has a very negative impact on the appearance of the city as a whole, its attractiveness for investment and tourism and the general living conditions in the degraded area. The pr...)
(‎Changed an Item)
Property / programme
 
Property / programme: Dolno?l?skie Voivodeship - ERDF/ESF / rank
 
Normal rank

Revision as of 14:21, 26 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Renovation of the building at ul. 1 May 83 in Wałbrzych
Project in Poland financed by DG Regio

    Statements

    0 references
    458,230.38 zloty
    0 references
    109,975.29119999999 Euro
    13 January 2020
    0 references
    682,587.22 zloty
    0 references
    163,820.93279999998 Euro
    13 January 2020
    0 references
    74.99 percent
    0 references
    23 December 2016
    0 references
    31 July 2019
    0 references
    WSPÓLNOTA MIESZKANIOWA PRZY UL. 1 MAJA 83 W WAŁBRZYCHU
    0 references
    Przedmiotem projektu jest przeprowadzenie działań mających na celu poprawę stanu technicznego budynku znajdujące się w Wałbrzychu na ul. 1 Maja 83. W chwili obecnej stan budynku jest zły, zgodnie z przeglądem technicznym zużycie techniczne obiektu wynosi 54,12%. Wpływa to bardzo negatywnie na wygląd całego miasta, jego atrakcyjność inwestycyjną i turystyczną oraz ogólne warunki życia na obszarze zdegradowanym. Postępująca degradacja infrastruktury technicznej miasta wywołuje ogólne zniechęcenie, poczucie wykluczenia społecznego i kumulacje środowisk patogennych wśród jego mieszkańców. Inwestycja realizowana będzie w oparciu o zadania związane z: - dokumentacją projektu (w tym studium wykonalności) - pracami budowlanymi (prace związane z rewitalizacją oraz udogodnienia dla osób niepełnosprawnych), - informacją i promocją - nadzorem inwestorskim - zarządzaniem projektem. Projekt realizowany będzie samodzielnie. Beneficjentem, Operatorem i Inwestorem projektu jest Wspólnota Mieszkaniowa przy ul. 1 Maja 83 w Wałbrzychu. Grupą docelową przedmiot. projektu są mieszkańcy miasta Wałbrzych, a z rezultatów projektu skorzystają przede wszystkim mieszkańcy budynku przy ul. 1 Maja 83 w Wałbrzychu, który poddany zostanie rewitalizacji. Lokatorzy budynku zamieszkują łącznie 19 mieszkań. W projekcie występują koszty niekwalifikowane ze względu na powierzchnie użytkową w budynku. Koszty kwalifikowalności wydatków zostały proporcjonalnie obcięte. Zgodnie z Wytycznymi trwałość projektu zostanie zachowana przez okres minimum 5 lat od momentu rozliczenia projektu. Realizacja projektu pozwoli na realizację założonych celów Gminnego Programu Rewitalizacji dla Miasta Wałbrzych na lata 2016-2025, jak również umożliwi likwidację zidentyfikowanych problemów występ. na tym obszarze. Zrealizowanie projektu przyczyni się do: poprawy stanu technicznego budynku, wzrostu jakości życia mieszkańców, wyhamowania patologii i wykluczeń, rozwoju i wzmocnienia więzi lokalnych (widoczny char (Polish)
    0 references
    The purpose of the project is to take measures to improve the technical condition of the building located in Wałbrzych at ul. 1 May 83. At present, the building is in a poor state, according to the technical review, the technical consumption of the plant is 54.12 %. This has a very negative impact on the appearance of the city as a whole, its attractiveness for investment and tourism and the general living conditions in the degraded area. The progressive degradation of a city’s technical infrastructure has an overall discouragement, a sense of social exclusion and the accumulation of pathogenic organisms among its inhabitants. The investment will be carried out on the basis of tasks related to: Project documentation (including feasibility study) — construction works (rehabilitation works and facilities for disabled persons), information and promotion — investment management — project management. The project will be carried out on its own. The beneficiary, the Operator and the Project Investor is the Housing Community at ul. 1 May 83 in Wałbrzych. The object of the project is the inhabitants of the city of Wałbrzych, and the project results will benefit, in particular, the inhabitants of the building at ul. 1 May 83 in Wałbrzych, which will be revitalised. The tenants of the building are home to a total of 19 dwellings. The project has costs which are not eligible for use in building areas in the building. The costs of eligibility of expenditure have been proportionally cut. According to the Guidelines, the durability of the project will be maintained for a minimum of 5 years after the project has been cleared. The implementation of the project will help to achieve the objectives set by the Municipal Rehabilitation Programme for the city of Wałbrzych for the period 2016-2025, as well as to address the identified problems in the area. The project will contribute to: improvement of the technical condition of the building, the increase in the quality of life of the population, the stopping of pathology and the exclusion, development and strengthening of local links (the fact that the char can be found? (English)
    0 references

    Identifiers

    RPDS.06.03.04-02-0016/16
    0 references