Reconstruction of the production facility of Alumistr SE (Q14315): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,) |
(Changed an Item) |
||
Property / priority axis | |||
Property / priority axis: Development of entrepreneurship and competitiveness of small and medium-sized enterprises / rank | |||
Normal rank | |||
Property / thematic objective | |||
Property / thematic objective: Competitiveness of SMEs / rank | |||
Normal rank |
Revision as of 16:23, 17 February 2023
Project Q14315 in Czech Republic
Language | Label | Description | Also known as |
---|---|---|---|
English | Reconstruction of the production facility of Alumistr SE |
Project Q14315 in Czech Republic |
Statements
5,584,245.75 Czech koruna
0 references
12,409,435.0 Czech koruna
0 references
45 percent
0 references
1 December 2016
0 references
17 December 2018
0 references
31 December 2018
0 references
ALUMISTR SE
0 references
66462
0 references
Projekt řeší rekonstrukci výrobního areálu společnosti Alumistr SE v Hrušovanech u Brna. V rámci projektu bude provedena rekonstrukce objektu pro výrobu hliníkových systémů pro stavebnictví. Hala je v současné době ve špatném technickém stavu, který nevyhovuje potřebám společnosti. Je částečně využívaná jako sklad materiálu, částečně je nevyužívaná. a. (Czech)
0 references
The project deals with the reconstruction of the production area of the company Alumistr SE in Hrušovany u Brna. As part of the project, the building will be reconstructed for the production of aluminium systems for construction. The hall is currently in poor technical condition, which does not meet the needs of society. It is partially used as a storage material, partly unused. (English)
22 October 2020
0 references
Le projet porte sur la reconstruction du site de production d’Alumistr SE à Hrušovany u Brna. Le projet réalisera une reconstruction du bâtiment pour la production de systèmes en aluminium pour l’industrie de la construction. La salle est actuellement en mauvais état technique, ce qui ne répond pas aux besoins de l’entreprise. Il est en partie utilisé comme réserve, en partie inutilisé. (French)
28 November 2021
0 references
Das Projekt befasst sich mit dem Wiederaufbau der Produktionsstätte der Alumistr SE in Hrušovany u Brna. Das Projekt wird eine Rekonstruktion des Gebäudes zur Herstellung von Aluminiumsystemen für die Bauindustrie durchführen. Die Halle befindet sich derzeit in einem schlechten technischen Zustand, was nicht den Bedürfnissen des Unternehmens entspricht. Es wird teilweise als Vorrat verwendet, teilweise nicht verwendet. (German)
2 December 2021
0 references
Het project heeft betrekking op de wederopbouw van de productielocatie van Alumistr SE in Hrušovany u Brna. Het project zal een reconstructie van het gebouw uitvoeren voor de productie van aluminiumsystemen voor de bouwsector. De hal is momenteel in slechte technische staat, die niet voldoet aan de behoeften van het bedrijf. Het wordt gedeeltelijk gebruikt als voorraad, deels ongebruikt. (Dutch)
13 December 2021
0 references
Il progetto si occupa della ricostruzione del sito di produzione dell'Alumistr SE a Hrušovany u Brna. Il progetto effettuerà una ricostruzione dell'edificio per la produzione di sistemi in alluminio per l'industria delle costruzioni. La sala è attualmente in cattive condizioni tecniche, che non soddisfa le esigenze dell'azienda. È in parte usato come scorta, in parte inutilizzato. (Italian)
14 January 2022
0 references
El proyecto trata de la reconstrucción de la planta de producción de Alumistr SE en Hrušovany u Brna. El proyecto llevará a cabo una reconstrucción del edificio para la producción de sistemas de aluminio para la industria de la construcción. La sala se encuentra actualmente en malas condiciones técnicas, lo que no satisface las necesidades de la empresa. Se utiliza en parte como reserva, en parte no utilizada. (Spanish)
15 January 2022
0 references
Projektet vedrører genopbygningen af produktionsområdet for virksomheden Alumistr SE i Hrušovany u Brna. Som en del af projektet vil bygningen blive rekonstrueret til produktion af aluminiumanlæg til byggeri. Hallen er i øjeblikket i dårlig teknisk stand, som ikke opfylder samfundets behov. Det anvendes delvis som lagermateriale, delvis ubrugt. (Danish)
3 July 2022
0 references
Το έργο αφορά την ανακατασκευή της περιοχής παραγωγής της εταιρείας Alumistr SE στο Hrušovany u Brna. Στο πλαίσιο του έργου, το κτίριο θα ανακατασκευαστεί για την παραγωγή συστημάτων αλουμινίου για κατασκευή. Η αίθουσα βρίσκεται επί του παρόντος σε κακή τεχνική κατάσταση, η οποία δεν ανταποκρίνεται στις ανάγκες της κοινωνίας. Χρησιμοποιείται εν μέρει ως υλικό αποθήκευσης, εν μέρει αχρησιμοποίητο. (Greek)
3 July 2022
0 references
Projekt se bavi rekonstrukcijom proizvodnog područja tvrtke Alumistr SE u Hrušovany u Brni. U sklopu projekta, zgrada će biti rekonstruirana za proizvodnju aluminijskih sustava za gradnju. Dvorana je trenutno u lošem tehničkom stanju, što ne zadovoljava potrebe društva. Djelomično se koristi kao skladišni materijal, djelomično neiskorišten. (Croatian)
3 July 2022
0 references
Proiectul se referă la reconstrucția zonei de producție a societății Alumistr SE din Hrušovany u Brna. Ca parte a proiectului, clădirea va fi reconstruită pentru producția de sisteme de aluminiu pentru construcții. Sala este în prezent într-o stare tehnică precară, ceea ce nu răspunde nevoilor societății. Este utilizat parțial ca material de depozitare, parțial neutilizat. (Romanian)
3 July 2022
0 references
Projekt sa zaoberá rekonštrukciou výrobnej plochy spoločnosti Alumistr SE v Hrušovany u Brna. V rámci projektu bude budova rekonštruovaná na výrobu hliníkových systémov pre výstavbu. Hala je v súčasnosti v zlom technickom stave, ktorý nezodpovedá potrebám spoločnosti. Čiastočne sa používa ako skladovací materiál, čiastočne nepoužitý. (Slovak)
3 July 2022
0 references
Il-proġett jittratta r-rikostruzzjoni taż-żona tal-produzzjoni tal-kumpanija Alumistr SE f’Hrušovany u Brna. Bħala parti mill-proġett, il-bini se jinbena mill-ġdid għall-produzzjoni ta’ sistemi tal-aluminju għall-kostruzzjoni. Is-sala bħalissa tinsab f’kundizzjoni teknika fqira, li ma tissodisfax il-ħtiġijiet tas-soċjetà. Jintuża parzjalment bħala materjal għall-ħżin, parzjalment mhux użat. (Maltese)
3 July 2022
0 references
O projeto trata da reconstrução da área de produção da empresa Alumistr SE em Hrušovany u Brna. No âmbito do projeto, o edifício será reconstruído para a produção de sistemas de alumínio para construção. O salão encontra-se atualmente em mau estado técnico, o que não satisfaz as necessidades da sociedade. É parcialmente utilizado como material de armazenamento, parcialmente não utilizado. (Portuguese)
3 July 2022
0 references
Hankkeessa käsitellään Alumistr SE:n tuotantoalueen jälleenrakentamista Hrušovany u Brnassa. Rakennus rekonstruoidaan osana hanketta alumiinijärjestelmien valmistamista varten. Sali on tällä hetkellä huonossa teknisessä kunnossa, mikä ei vastaa yhteiskunnan tarpeita. Sitä käytetään osittain varastointimateriaalina, osittain käyttämättömänä. (Finnish)
3 July 2022
0 references
Projekt dotyczy przebudowy obszaru produkcyjnego firmy Alumistr SE w Hrušovany u Brna. W ramach projektu budynek zostanie przebudowany do produkcji systemów aluminiowych dla budownictwa. Sala znajduje się obecnie w złym stanie technicznym, co nie odpowiada potrzebom społeczeństwa. Jest częściowo używany jako materiał do przechowywania, częściowo nieużywany. (Polish)
3 July 2022
0 references
Projekt se ukvarja z obnovo proizvodnega območja podjetja Alumistr SE v Hrušovany u Brna. V okviru projekta bo stavba rekonstruirana za proizvodnjo aluminijastih konstrukcijskih sistemov. Dvorana je trenutno v slabem tehničnem stanju, kar ne ustreza potrebam družbe. Delno se uporablja kot material za shranjevanje, delno neuporabljen. (Slovenian)
3 July 2022
0 references
Projektas skirtas įmonės „Alumistr SE“ gamybos vietovės rekonstrukcijai Hrušovany u Brna. Vykdant projektą, pastatas bus rekonstruotas aliuminio sistemų gamybai. Šiuo metu salė yra prastos techninės būklės, kuri neatitinka visuomenės poreikių. Iš dalies naudojamas kaip saugojimo medžiaga, iš dalies nenaudojamas. (Lithuanian)
3 July 2022
0 references
Projekts attiecas uz uzņēmuma Alumistr SE ražošanas apgabala rekonstrukciju Hrušovany u Brna. Projekta ietvaros ēka tiks rekonstruēta alumīnija sistēmu ražošanai būvniecībai. Zāle šobrīd ir sliktā tehniskā stāvoklī, kas neatbilst sabiedrības vajadzībām. To daļēji izmanto kā uzglabāšanas materiālu, daļēji neizmantotu. (Latvian)
3 July 2022
0 references
Проектът се отнася до реконструкцията на производствения район на дружеството Alumistr SE в Hrušovany u Brna. Като част от проекта, сградата ще бъде реконструирана за производство на алуминиеви системи за строителство. Залата в момента е в лошо техническо състояние, което не отговаря на нуждите на обществото. Частично се използва като материал за съхранение, частично неизползван. (Bulgarian)
3 July 2022
0 references
A projekt az Alumistr SE vállalat termelési területének újjáépítésével foglalkozik Hrušovany u Brna-ban. A projekt részeként az épületet az építőipari alumíniumrendszerek gyártása céljából rekonstruálják. A terem jelenleg rossz műszaki állapotban van, ami nem felel meg a társadalom igényeinek. Részben tároló anyagként, részben fel nem használt anyagként használják fel. (Hungarian)
3 July 2022
0 references
Déileálann an tionscadal le hatógáil limistéar táirgthe na cuideachta Alumistr SE in Hrušovany u Brna. Mar chuid den tionscadal, déanfar an foirgneamh a atógáil chun córais alúmanaim a tháirgeadh le haghaidh tógála. Tá drochbhail theicniúil ar an halla faoi láthair, rud nach gcomhlíonann riachtanais na sochaí. Tá sé in úsáid go páirteach mar ábhar stórála, nach bhfuil in úsáid go páirteach. (Irish)
3 July 2022
0 references
Projektet handlar om återuppbyggnad av produktionsområdet för företaget Alumistr SE i Hrušovany u Brna. Som en del av projektet kommer byggnaden att rekonstrueras för produktion av aluminiumsystem för byggnation. Salen är för närvarande i dåligt tekniskt skick, vilket inte uppfyller samhällets behov. Den används delvis som lagringsmaterial, delvis oanvänd. (Swedish)
3 July 2022
0 references
Projekt hõlmab ettevõtte Alumistr SE tootmispiirkonna rekonstrueerimist Hrušovany u Brnas. Projekti raames rekonstrueeritakse hoone ehitamiseks mõeldud alumiiniumsüsteemide tootmiseks. Saal on praegu halvas tehnilises seisukorras, mis ei vasta ühiskonna vajadustele. Seda kasutatakse osaliselt ladustamismaterjalina, osaliselt kasutamata. (Estonian)
3 July 2022
0 references
Identifiers
CZ.01.2.07/0.0/0.0/16_058/0007626
0 references