Modernisation of pumping station Argów Iłów (Q109242): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): The primary objective of the project is to improve the prevention and minimisation of natural disasters, including flooding, in rural municipalities: Słubice, Saniki, Youth, Rybnik and ice in the ‘Iłowsko — Dobrzykowska’ valley. The scope of the investment includes the reconstruction of the building of the pumping station and its associated facilities in such a way as to ensure that the requirements of the applicable standards and regulations ar...) |
(Changed an Item) |
||
Property / programme | |||
Property / programme: Mazowieckie Voivodeship - ERDF/ESF / rank | |||
Normal rank |
Revision as of 13:28, 26 March 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Modernisation of pumping station Argów Iłów |
Project in Poland financed by DG Regio |
Statements
8,485,069.18 zloty
0 references
2,036,416.6031999998 Euro
0.24 Euro
13 January 2020
0 references
10,850,308.47 zloty
0 references
80.0 percent
0 references
8 April 2015
0 references
30 June 2021
0 references
PAŃSTWOWE GOSPODARSTWO WODNE WODY POLSKIE
0 references
Podstawowym celem projektu jest efektywniejsze zapobieganie katastrofom naturalnym, w tym powodziom i minimalizowanie ich skutków na terenie wiejskich Gmin: Słubice, Sanniki, Młodzieszyn, Rybno i Iłów w dolinie „Iłowsko –Dobrzykowskiej”. Zakres inwestycji obejmuje przebudowę budynku pompowni wraz z towarzyszącymi obiektami w sposób zapewniający spełnienie wymogów obowiązujących norm i przepisów. Zadaniem pompowni jest utrzymanie możliwości regulacji poziomu wody w zlewniach rzeki Jeżówki i Kanału H poprzez utrzymywanie na dopływie do pompowni wody na takim poziomie, aby ograniczyć, podczas wezbrań powodziowych, negatywne oddziaływanie wód filtrujących przez wały Wisły wód rzeki Jeżówki i Kanału H na tereny użytkowane rolniczo, położone w Dolinie. Pompownia jest wysoce wyeksploatowana, awaryjna oraz przestarzała technologicznie, w związku z czym istniejąca infrastruktura nie spełnia swojej roli. Ostatni remont wykonano w 1997r. W wyniku wieloletniej eksploatacji pompowni znacznemu zużyciu uległy zarówno pompy, armatura, instalacja elektryczna jak i elementy konstrukcji budowlanych. Z uwagi na powyższe przewiduje się przebudowę pompowni w zakresie: - budowlanym (budynku stacji pomp i budynku trafostacji ); - technologicznym (wymiana pomp wraz z armaturą, układu sterowania i automatyki, zainstalowanie monitoringu układu pracy pomp, zainstalowanie układu monitoringu stanów wody rzeki Wisły i w zbiorniku wyrównawczym oraz montaż napędów elektrycznych zasuw na przepuście wałowym); elektrycznym (wymiana instalacji elektrycznych wewnętrznych) oraz zagospodarowania terenu (wymiana i naprawa ogrodzenia, remont dróg wewnętrznych). W celu zapewnienia większego poziomu zabezpieczenia przeciwpowodziowego części Doliny oraz zlewni Kanału H i Rzeki Jeżówki, a także zmniejszenia wydatków związanych z utrzymaniem pompowni należy przeprowadzić przebudowę pompowni w w/w zakresie, czyniąc ją ponadto bardziej ekonomiczną i przyjazną środowisku. (Polish)
0 references
The primary objective of the project is to improve the prevention and minimisation of natural disasters, including flooding, in rural municipalities: Słubice, Saniki, Youth, Rybnik and ice in the ‘Iłowsko — Dobrzykowska’ valley. The scope of the investment includes the reconstruction of the building of the pumping station and its associated facilities in such a way as to ensure that the requirements of the applicable standards and regulations are met. It is the task of the pumping stations to maintain the water level in the catchment areas of the river basin and the H Canal by keeping water to the water pumping stations at such a level as to reduce, during flood surges, the negative effects of filtering waters by the Vistula river and the H Canal waters into the utilised agricultural area in the Valley. The pumping station is highly exploited, degraded and obsolete technology, and therefore the existing infrastructure does not fulfil its role. The last renovation was carried out in 1997. As a result of the multiannual operation of the pumping station, both pumps, fittings, electrical fittings and construction structures have been substantially affected. In view of the above, it is envisaged to upgrade the pumping station to the extent of: Construction (pump station building and hit building); — technology (replacement of pumps with fittings, control and automation systems, installation of the monitoring system for the pumps, the installation of a monitoring system for the water conditions of the river Wisła and in the compensatory tank and the installation of the electric drive units for the shaft pass); electrical (replacement of internal electrical installations) and site management (replacement and repair of fencing, renovation of internal roads). In order to ensure a higher level of protection against the flooding of part of the valley of the H and zes of the H Canal and of the river basin, and to reduce the expenditure relating to the maintenance of the pumping station, it is necessary to carry out the reconstruction of the pumping station at/on the site, making it more economically and environmentally friendly. (English)
0 references
Identifiers
RPMA.05.01.00-14-D165/19
0 references