Blacksmith: in the green light (Q65443): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): The project aims at extending the waste separation system in the catchment area. By way of this step, the municipality seeks to make the most of the improvement in the implementation of the waste separation system in Bílý Újezd and its local parts, thus increasing the amount of municipal waste recovered. In addition, such wastes will be weighed for further material processing and recovery operations., Adding English summary)
(‎Changed an Item)
Property / programme
 
Property / programme: Environment - CZ - ERDF/CF / rank
 
Normal rank

Revision as of 08:42, 26 March 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Blacksmith: in the green light
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    2,658,528.0 Czech koruna
    0 references
    106,341.12 Euro
    10 January 2020
    0 references
    3,127,680.0 Czech koruna
    0 references
    125,107.2 Euro
    10 January 2020
    0 references
    85 percent
    0 references
    15 May 2018
    0 references
    30 November 2019
    0 references
    Vít Kovář
    0 references
    0 references

    50°17'18.02"N, 16°11'46.14"E
    0 references
    51801
    0 references
    Záměrem projektu je rozšířit systém separace odpadů ve spádové oblasti. Tímto krokem se obec snaží maximálně přispět k tomu, aby se dosud zavedený systém separace odpadů v obci Bílý Újezd a jejích místních částech zdokonalil a navýšilo se tak množství vytříděného komunálního odpadu. Dále budou tyto odpady odváženy k dalšímu materiálovému zpracování a využití. (Czech)
    0 references
    The project aims at extending the waste separation system in the catchment area. By way of this step, the municipality seeks to make the most of the improvement in the implementation of the waste separation system in Bílý Újezd and its local parts, thus increasing the amount of municipal waste recovered. In addition, such wastes will be weighed for further material processing and recovery operations. (English)
    0 references

    Identifiers

    CZ.05.3.29/0.0/0.0/16_041/0003927
    0 references