Elimination of SEZ Jablonec nad Nissou- galvanised mill (Q62501): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): The project concerns the removal of the construction of a former galvanic house in Jablonec, nad Nisou. The Object is placed in close proximity to the city centre and the site is currently abandoned and there is no production activity. the buildings and buildings are in a brownish condition. Residential areas are located in the immediate vicinity. The total area has a surface area of about 3.549 m², with a fenced off, with entrance from the Mcal...) |
(Changed an Item) |
||
Property / programme | |||
Property / programme: Environment - CZ - ERDF/CF / rank | |||
Normal rank |
Revision as of 08:25, 26 March 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Elimination of SEZ Jablonec nad Nissou- galvanised mill |
Project in Czech Republic financed by DG Regio |
Statements
12,116,663.3 Czech koruna
0 references
14,254,898.0 Czech koruna
0 references
85 percent
0 references
1 October 2018
0 references
EVOSA spol. s r.o.
0 references
46342
0 references
Předmětem projektu je odstranění stavby bývalé galvanovny v Jablonci nad Nisou. Objetky se nacházív těsné blízkosti centra města a areál je v současné době opuštěn a neprobíhá žádná výrobní činnost.Budovy a objekty jsou v zanedbaném stavu. Obytná zona se nachází v bezprostřední blízkosti. Celýareál zaujímá plochu cca 3.549 m2, je oplocený, s vjezdem z Mlýnské ulice. Popis ekologiké zátěže jedetailně uveden v samostatné příloze Analýza rizik. (Czech)
0 references
The project concerns the removal of the construction of a former galvanic house in Jablonec, nad Nisou. The Object is placed in close proximity to the city centre and the site is currently abandoned and there is no production activity. the buildings and buildings are in a brownish condition. Residential areas are located in the immediate vicinity. The total area has a surface area of about 3.549 m², with a fenced off, with entrance from the Mcalf. The description of the greening burden is set out in a separate annex in the risk analysis. (English)
0 references
Identifiers
CZ.05.3.24/0.0/0.0/17_065/0005322
0 references