The construction of a glass museum, including the barrier-free approach and the reconstruction of the depository in Kastrana Horch (Q60470): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed an Item)
Property / programme
 
Property / programme: Integrated Regional Programme - CZ - ERDF / rank
 
Normal rank

Revision as of 02:13, 26 March 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
The construction of a glass museum, including the barrier-free approach and the reconstruction of the depository in Kastrana Horch
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    37,372,326.04 Czech koruna
    0 references
    1,494,893.0415999999 Euro
    1 October 2020
    0 references
    43,967,442.41 Czech koruna
    0 references
    1,758,697.6963999998 Euro
    1 October 2020
    0 references
    85.0 percent
    0 references
    31 December 2020
    0 references
    Muzeum Šumavy Sušice, příspěvková organizace
    0 references
    0 references
    34201
    0 references
    V objektu čp. 141 v Kašp. Horách vznikne nové sklářské muzeum. Dosavadní expozice už nevyhovuje svým rozsahem ani koncepcí, nedokáže představit sklářskou sbírku v plném rozsahu a sklářskou tematiku ve všech souvislostech historického vývoje. Při rekonstrukci objektu r. 2011 byla už provedena potřebná stavební úprava pro instalaci výtahu, který nyní bude vybudován. V roce 2012 jsme získali také nový objekt depozitáře. Po provedení kompletní rekonstrukce zde vznikne depozitář pro sbírky muzea. (Czech)
    0 references
    At the building site. 141 in Kashp. A new glass museum will be created by the mountains. The previous exposure is no longer fit for scope or concept and is not able to present a full and glass collection in all its historical context. The construction of the 2011 building has already made the necessary construction work for the installation of the lift, which will now be built. In 2012, we also acquired a new depositary object. Once a full reconstruction has been carried out, a depositary for the collection of the museum will be created. (English)
    0 references

    Identifiers

    CZ.06.3.33/0.0/0.0/17_099/0007840
    0 references