Construction work for multi-family buildings in harmony I and II, Rybářská č. 1810, 1819 insulation of the building envelope and roof envelope (Q75691): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): The aim of the project is to reduce the energy performance of two apartment blocks of harmony I and II. I turn down the building and achieving a saving of the total energy supplied at a minimum of 30 % compared to the status before the measure is implemented, the achievement of class C in class C or better, and meeting the cost-optimal requirements for the cost-optimal levels referred to in points (a) or (b), section 2, Section 6 of Decree No 7...) |
(Changed an Item) |
||
Property / programme | |||
Property / programme: Integrated Regional Programme - CZ - ERDF / rank | |||
Normal rank |
Revision as of 19:03, 25 March 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction work for multi-family buildings in harmony I and II, Rybářská č. 1810, 1819 insulation of the building envelope and roof envelope |
Project in Czech Republic financed by DG Regio |
Statements
5,866,196.1 Czech koruna
0 references
19,553,987.0 Czech koruna
0 references
30 percent
0 references
12 July 2017
0 references
30 September 2018
0 references
MĚSTO NÁCHOD
0 references
54701
0 references
Cílem projektu je snížení energetické náročnosti dvou bytových domů HARMONIE I. a II. zateplením obálek budova a dosažením úspory celkové dodané energie v minimální výši 30 % oproti stavu před realizací opatření, dosažení klasifikační třídy celkové dodané energie C nebo lepší a zároveň splnění požadavků pro nákladově optimální úroveň podle písm. a) nebo b), odst. 2, §6, vyhlášky č. 78/2013 Sb., o energetické náročnosti budov. (Czech)
0 references
The aim of the project is to reduce the energy performance of two apartment blocks of harmony I and II. I turn down the building and achieving a saving of the total energy supplied at a minimum of 30 % compared to the status before the measure is implemented, the achievement of class C in class C or better, and meeting the cost-optimal requirements for the cost-optimal levels referred to in points (a) or (b), section 2, Section 6 of Decree No 78/2013 on the energy performance of buildings. (English)
0 references
Identifiers
CZ.06.2.11/0.0/0.0/16_098/0004825
0 references