Reducing the energy — culture House, Nišovice (Q71858): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): The project addresses the insulation of the envelope of the building and the replacement of a heating source for a cultural home in Nisovice in the county of Strakonice. The building stock is located on building land st. 24/2. These are the insulation of the wall walls, the exchange of windows and boiler doors (the rest are already PVC) and the insulation of flat roofs. The completely unsatisfactory heating source for diesel will be replaced by...)
(‎Changed an Item)
Property / programme
 
Property / programme: Environment - CZ - ERDF/CF / rank
 
Normal rank

Revision as of 17:30, 25 March 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Reducing the energy — culture House, Nišovice
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    914,178.4 Czech koruna
    0 references
    36,567.136 Euro
    10 January 2020
    0 references
    2,285,446.0 Czech koruna
    0 references
    91,417.84 Euro
    10 January 2020
    0 references
    40 percent
    0 references
    22 May 2017
    0 references
    28 February 2019
    0 references
    Obec Nišovice
    0 references
    0 references

    49°10'16.54"N, 13°53'45.78"E
    0 references
    38701
    0 references
    Projekt řeší zateplení obálky budovy a výměnu topného zdroje kulturního domu v Nisovicích v okrese Strakonice. Kulturní dům se nachází na stavebním pozemku st. 24/2. Jedná se o zateplení obvodových stěn, výměnu okna a dveří kotelny (ostatní výplně jsou již PVC) a zateplení plochých střech. Zcela nevyhovující topný zdroj na naftu bude vyměněn za automatický peletový kotel. Prostor sálu vytápěn teplovzdušně. (Czech)
    0 references
    The project addresses the insulation of the envelope of the building and the replacement of a heating source for a cultural home in Nisovice in the county of Strakonice. The building stock is located on building land st. 24/2. These are the insulation of the wall walls, the exchange of windows and boiler doors (the rest are already PVC) and the insulation of flat roofs. The completely unsatisfactory heating source for diesel will be replaced by an automatic pear-fired boiler. The room for heating warm air. (English)
    0 references

    Identifiers

    CZ.05.5.18/0.0/0.0/15_019/0001449
    0 references