Extension of Voivodeship Road No. 194 Wyrzysk-Gołańcz in Wyrzysk (Q135163): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Import item from Poland)
(‎Changed label, description and/or aliases in ga, da, el, sv, ro, sl, lt, hu, fi, sk, et, mt, lv, bg, pt, hr, cs, nl, fr, de, it, es, and other parts)
label / galabel / ga
 
Síneadh ar Bhóthar Voivodeship Uimh. 194 Wyrzysk-Gołańcz i Wyrzysk
label / dalabel / da
 
Udvidelse af Voivodeship Road No. 194 Wyrzysk-Gołańcz i Wyrzysk
label / ellabel / el
 
Επέκταση της οδού Voivodeship No. 194 Wyrzysk-Gołańcz στο Wyrzysk
label / svlabel / sv
 
Förlängning av Voivodeship Road nr 194 Wyrzysk-Gołańcz i Wyrzysk
label / rolabel / ro
 
Extinderea drumului Voievodatului nr. 194 Wyrzysk-Gołańcz din Wyrzysk
label / sllabel / sl
 
Podaljšanje Voivodeship Road št. 194 Wyrzysk-Gołańcz v Wyrzysku
label / ltlabel / lt
 
Vaivadijos kelio Nr. 194 Wyrzysk-Gołańcz Vyrzyske pratęsimas
label / hulabel / hu
 
A Wyrzysk-Gołańcz 194. számú vajdasági út meghosszabbítása Wyrzyskben
label / filabel / fi
 
Voivodeship Road nro 194 Wyrzysk-Gołańczin laajennus Wyrzyskissa
label / sklabel / sk
 
Rozšírenie Voivodeship Road č. 194 Wyrzysk-Gołańcz vo Wyrzysku
label / etlabel / et
 
Vojevoodkonna maantee nr 194 Wyrzysk-Gołańcz pikendamine Wyrzyskis
label / mtlabel / mt
 
Estensjoni tat-Triq Voivodeship Nru 194 Wyrzysk-Gołańcz f’Wyrzysk
label / lvlabel / lv
 
Vojevodistes ceļa Nr. 194 Wyrzysk-Gołańcz pagarināšana Vižskā
label / bglabel / bg
 
Разширяване на Войводския път № 194 Wyrzysk-Gołańcz в Wyrzysk
label / ptlabel / pt
 
Extensão da estrada de voivodia n.º 194 Wyrzysk-Gołańcz em Wyrzysk
label / hrlabel / hr
 
Proširenje ceste vojvodstva br. 194 Wyrzysk-Gołańcz u Wyrzysku
label / cslabel / cs
 
Rozšíření Voivodeship Road č. 194 Wyrzysk-Gołańcz ve Wyrzysku
description / bgdescription / bg
 
Проект Q135163 в Полша
description / hrdescription / hr
 
Projekt Q135163 u Poljskoj
description / hudescription / hu
 
Projekt Q135163 Lengyelországban
description / csdescription / cs
 
Projekt Q135163 v Polsku
description / dadescription / da
 
Projekt Q135163 i Polen
description / nldescription / nl
 
Project Q135163 in Polen
description / etdescription / et
 
Projekt Q135163 Poolas
description / fidescription / fi
 
Projekti Q135163 Puolassa
description / frdescription / fr
 
Projet Q135163 en Pologne
description / dedescription / de
 
Projekt Q135163 in Polen
description / eldescription / el
 
Έργο Q135163 στην Πολωνία
description / gadescription / ga
 
Tionscadal Q135163 sa Pholainn
description / itdescription / it
 
Progetto Q135163 in Polonia
description / lvdescription / lv
 
Projekts Q135163 Polijā
description / ltdescription / lt
 
Projektas Q135163 Lenkijoje
description / mtdescription / mt
 
Proġett Q135163 fil-Polonja
description / ptdescription / pt
 
Projeto Q135163 na Polônia
description / rodescription / ro
 
Proiectul Q135163 în Polonia
description / skdescription / sk
 
Projekt Q135163 v Poľsku
description / sldescription / sl
 
Projekt Q135163 na Poljskem
description / esdescription / es
 
Proyecto Q135163 en Polonia
description / svdescription / sv
 
Projekt Q135163 i Polen
Property / summary
 
Tá an tionscadal lonnaithe i Wielkopolskie Voivodship, Contae Pilskie, Wyrzysk commune. Is é ábhar an staidéir ná leathnú an Bhóthair Voivodeship Uimh 194 ar fhad 2 171.94 m i Wyrzysk. Faoi láthair, tá díghrádú suntasach á dhéanamh ar bhóthar Uimh. 194 ar an gcuid trasnaithe de Wyrzysk. Ar an mbóthar, stoptar an trácht ag stadanna bus ar an mbóthar. Tá droch-riocht teicniúil ag an dromchla — tá dífhoirmiú, bumps, scoilteanna fadaimseartha agus trasnach, lochtanna iomadúla agus paistí ann. Tá drochbhail theicniúil ar na cosáin atá ann cheana freisin. Cuireann an easpa córais díhiodráitithe fheidhmiúil leis an meath ar dhálaí sábháilteachta ar bhóithre. Áirítear leis an infheistíocht:- ceartú geoiméadracht an bhóthair cúige ag crosbhealach ul. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. Mar thoradh ar an infheistíocht i 2017, atógfar 2 171.94 m de bhóthar voivodship Uimh. 194 agus lintéir agus struchtúr droichid. (Irish)
Property / summary: Tá an tionscadal lonnaithe i Wielkopolskie Voivodship, Contae Pilskie, Wyrzysk commune. Is é ábhar an staidéir ná leathnú an Bhóthair Voivodeship Uimh 194 ar fhad 2 171.94 m i Wyrzysk. Faoi láthair, tá díghrádú suntasach á dhéanamh ar bhóthar Uimh. 194 ar an gcuid trasnaithe de Wyrzysk. Ar an mbóthar, stoptar an trácht ag stadanna bus ar an mbóthar. Tá droch-riocht teicniúil ag an dromchla — tá dífhoirmiú, bumps, scoilteanna fadaimseartha agus trasnach, lochtanna iomadúla agus paistí ann. Tá drochbhail theicniúil ar na cosáin atá ann cheana freisin. Cuireann an easpa córais díhiodráitithe fheidhmiúil leis an meath ar dhálaí sábháilteachta ar bhóithre. Áirítear leis an infheistíocht:- ceartú geoiméadracht an bhóthair cúige ag crosbhealach ul. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. Mar thoradh ar an infheistíocht i 2017, atógfar 2 171.94 m de bhóthar voivodship Uimh. 194 agus lintéir agus struchtúr droichid. (Irish) / rank
 
Normal rank
Property / summary: Tá an tionscadal lonnaithe i Wielkopolskie Voivodship, Contae Pilskie, Wyrzysk commune. Is é ábhar an staidéir ná leathnú an Bhóthair Voivodeship Uimh 194 ar fhad 2 171.94 m i Wyrzysk. Faoi láthair, tá díghrádú suntasach á dhéanamh ar bhóthar Uimh. 194 ar an gcuid trasnaithe de Wyrzysk. Ar an mbóthar, stoptar an trácht ag stadanna bus ar an mbóthar. Tá droch-riocht teicniúil ag an dromchla — tá dífhoirmiú, bumps, scoilteanna fadaimseartha agus trasnach, lochtanna iomadúla agus paistí ann. Tá drochbhail theicniúil ar na cosáin atá ann cheana freisin. Cuireann an easpa córais díhiodráitithe fheidhmiúil leis an meath ar dhálaí sábháilteachta ar bhóithre. Áirítear leis an infheistíocht:- ceartú geoiméadracht an bhóthair cúige ag crosbhealach ul. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. Mar thoradh ar an infheistíocht i 2017, atógfar 2 171.94 m de bhóthar voivodship Uimh. 194 agus lintéir agus struchtúr droichid. (Irish) / qualifier
 
point in time: 3 November 2022
Timestamp+2022-11-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Projektet er beliggende i Wielkopolskie Voivodship, Pilskie County, Wyrzysk kommune. Emnet for undersøgelsen er udvidelsen af Voivodeship Road No. 194 på længden af 2 171,94 m i Wyrzysk. I øjeblikket viser vej nr. 194 på krydset af Wyrzysk en betydelig nedbrydning. På vejen stoppes trafikken af busstoppesteder på vejen. Overfladen er kendetegnet ved dårlig teknisk stand — der er deformationer, bump, langsgående og tværgående revner, talrige defekter og patches. De eksisterende fortove er også i dårlig teknisk stand. Manglen på et funktionelt dehydreringssystem bidrager til forværringen af trafiksikkerheden. Investeringen omfatter:- korrektion af geometrien på provinsvejen i skæringspunktet mellem ul. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. Som følge af investeringen i 2017 vil 2 171,94 m voivodskabsvej nr. 194 og kulveller og brostruktur blive genopbygget. (Danish)
Property / summary: Projektet er beliggende i Wielkopolskie Voivodship, Pilskie County, Wyrzysk kommune. Emnet for undersøgelsen er udvidelsen af Voivodeship Road No. 194 på længden af 2 171,94 m i Wyrzysk. I øjeblikket viser vej nr. 194 på krydset af Wyrzysk en betydelig nedbrydning. På vejen stoppes trafikken af busstoppesteder på vejen. Overfladen er kendetegnet ved dårlig teknisk stand — der er deformationer, bump, langsgående og tværgående revner, talrige defekter og patches. De eksisterende fortove er også i dårlig teknisk stand. Manglen på et funktionelt dehydreringssystem bidrager til forværringen af trafiksikkerheden. Investeringen omfatter:- korrektion af geometrien på provinsvejen i skæringspunktet mellem ul. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. Som følge af investeringen i 2017 vil 2 171,94 m voivodskabsvej nr. 194 og kulveller og brostruktur blive genopbygget. (Danish) / rank
 
Normal rank
Property / summary: Projektet er beliggende i Wielkopolskie Voivodship, Pilskie County, Wyrzysk kommune. Emnet for undersøgelsen er udvidelsen af Voivodeship Road No. 194 på længden af 2 171,94 m i Wyrzysk. I øjeblikket viser vej nr. 194 på krydset af Wyrzysk en betydelig nedbrydning. På vejen stoppes trafikken af busstoppesteder på vejen. Overfladen er kendetegnet ved dårlig teknisk stand — der er deformationer, bump, langsgående og tværgående revner, talrige defekter og patches. De eksisterende fortove er også i dårlig teknisk stand. Manglen på et funktionelt dehydreringssystem bidrager til forværringen af trafiksikkerheden. Investeringen omfatter:- korrektion af geometrien på provinsvejen i skæringspunktet mellem ul. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. Som følge af investeringen i 2017 vil 2 171,94 m voivodskabsvej nr. 194 og kulveller og brostruktur blive genopbygget. (Danish) / qualifier
 
point in time: 3 November 2022
Timestamp+2022-11-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Το έργο βρίσκεται στο Wielkopolskie Voivodship, στην κομητεία Pilskie, στην κοινότητα Wyrzysk. Αντικείμενο της μελέτης είναι η επέκταση της οδού Βοϊβοδάτου αρ. 194 σε μήκος 2 171,94 m στο Wyrzysk. Επί του παρόντος, η οδός αριθ. 194 στο τμήμα διέλευσης του Wyrzysk παρουσιάζει σημαντική υποβάθμιση. Στο δρόμο, η κυκλοφορία διακόπτεται με στάσεις λεωφορείων στο δρόμο. Η επιφάνεια χαρακτηρίζεται από κακή τεχνική κατάσταση — υπάρχουν παραμορφώσεις, προσκρούσεις, διαμήκεις και εγκάρσιες ρωγμές, πολυάριθμα ελαττώματα και μπαλώματα. Τα υπάρχοντα πεζοδρόμια βρίσκονται επίσης σε κακή τεχνική κατάσταση. Η έλλειψη λειτουργικού συστήματος αφυδάτωσης συμβάλλει στην επιδείνωση των συνθηκών οδικής ασφάλειας. Η επένδυση περιλαμβάνει:- διόρθωση της γεωμετρίας της επαρχιακής οδού στη διασταύρωση του Ουλ. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. Ως αποτέλεσμα της επένδυσης το 2017, θα ανοικοδομηθούν 2 171,94 μ. βοεβοδάτου αρ. 194 και θα ανακατασκευαστούν οι οχτώστρες και η κατασκευή γεφυρών. (Greek)
Property / summary: Το έργο βρίσκεται στο Wielkopolskie Voivodship, στην κομητεία Pilskie, στην κοινότητα Wyrzysk. Αντικείμενο της μελέτης είναι η επέκταση της οδού Βοϊβοδάτου αρ. 194 σε μήκος 2 171,94 m στο Wyrzysk. Επί του παρόντος, η οδός αριθ. 194 στο τμήμα διέλευσης του Wyrzysk παρουσιάζει σημαντική υποβάθμιση. Στο δρόμο, η κυκλοφορία διακόπτεται με στάσεις λεωφορείων στο δρόμο. Η επιφάνεια χαρακτηρίζεται από κακή τεχνική κατάσταση — υπάρχουν παραμορφώσεις, προσκρούσεις, διαμήκεις και εγκάρσιες ρωγμές, πολυάριθμα ελαττώματα και μπαλώματα. Τα υπάρχοντα πεζοδρόμια βρίσκονται επίσης σε κακή τεχνική κατάσταση. Η έλλειψη λειτουργικού συστήματος αφυδάτωσης συμβάλλει στην επιδείνωση των συνθηκών οδικής ασφάλειας. Η επένδυση περιλαμβάνει:- διόρθωση της γεωμετρίας της επαρχιακής οδού στη διασταύρωση του Ουλ. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. Ως αποτέλεσμα της επένδυσης το 2017, θα ανοικοδομηθούν 2 171,94 μ. βοεβοδάτου αρ. 194 και θα ανακατασκευαστούν οι οχτώστρες και η κατασκευή γεφυρών. (Greek) / rank
 
Normal rank
Property / summary: Το έργο βρίσκεται στο Wielkopolskie Voivodship, στην κομητεία Pilskie, στην κοινότητα Wyrzysk. Αντικείμενο της μελέτης είναι η επέκταση της οδού Βοϊβοδάτου αρ. 194 σε μήκος 2 171,94 m στο Wyrzysk. Επί του παρόντος, η οδός αριθ. 194 στο τμήμα διέλευσης του Wyrzysk παρουσιάζει σημαντική υποβάθμιση. Στο δρόμο, η κυκλοφορία διακόπτεται με στάσεις λεωφορείων στο δρόμο. Η επιφάνεια χαρακτηρίζεται από κακή τεχνική κατάσταση — υπάρχουν παραμορφώσεις, προσκρούσεις, διαμήκεις και εγκάρσιες ρωγμές, πολυάριθμα ελαττώματα και μπαλώματα. Τα υπάρχοντα πεζοδρόμια βρίσκονται επίσης σε κακή τεχνική κατάσταση. Η έλλειψη λειτουργικού συστήματος αφυδάτωσης συμβάλλει στην επιδείνωση των συνθηκών οδικής ασφάλειας. Η επένδυση περιλαμβάνει:- διόρθωση της γεωμετρίας της επαρχιακής οδού στη διασταύρωση του Ουλ. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. Ως αποτέλεσμα της επένδυσης το 2017, θα ανοικοδομηθούν 2 171,94 μ. βοεβοδάτου αρ. 194 και θα ανακατασκευαστούν οι οχτώστρες και η κατασκευή γεφυρών. (Greek) / qualifier
 
point in time: 3 November 2022
Timestamp+2022-11-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Projektet ligger i Wielkopolskie Voivodship, Pilskie County, Wyrzysk kommun. Ämnet för studien är utvidgningen av Voivodeship Road nr 194 på längden av 2 171,94 m i Wyrzysk. Just nu, väg nr 194 på korsningen av Wyrzysk uppvisar betydande nedbrytning. På vägen stoppas trafiken av busshållplatser på vägen. Ytan kännetecknas av dåligt tekniskt skick – det finns deformationer, stötar, längsgående och tvärgående sprickor, många defekter och fläckar. De befintliga trottoarerna är också i dåligt tekniskt skick. Avsaknaden av ett funktionellt uttorkningssystem bidrar till försämrade trafiksäkerhetsförhållanden. Investeringen omfattar:- korrigering av den provinsiella vägens geometri vid korsningen mellan ul. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. Som ett resultat av investeringen 2017 kommer 2 171,94 m vojvodskeppsväg nr 194 och kulverter och brostruktur att byggas om. (Swedish)
Property / summary: Projektet ligger i Wielkopolskie Voivodship, Pilskie County, Wyrzysk kommun. Ämnet för studien är utvidgningen av Voivodeship Road nr 194 på längden av 2 171,94 m i Wyrzysk. Just nu, väg nr 194 på korsningen av Wyrzysk uppvisar betydande nedbrytning. På vägen stoppas trafiken av busshållplatser på vägen. Ytan kännetecknas av dåligt tekniskt skick – det finns deformationer, stötar, längsgående och tvärgående sprickor, många defekter och fläckar. De befintliga trottoarerna är också i dåligt tekniskt skick. Avsaknaden av ett funktionellt uttorkningssystem bidrar till försämrade trafiksäkerhetsförhållanden. Investeringen omfattar:- korrigering av den provinsiella vägens geometri vid korsningen mellan ul. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. Som ett resultat av investeringen 2017 kommer 2 171,94 m vojvodskeppsväg nr 194 och kulverter och brostruktur att byggas om. (Swedish) / rank
 
Normal rank
Property / summary: Projektet ligger i Wielkopolskie Voivodship, Pilskie County, Wyrzysk kommun. Ämnet för studien är utvidgningen av Voivodeship Road nr 194 på längden av 2 171,94 m i Wyrzysk. Just nu, väg nr 194 på korsningen av Wyrzysk uppvisar betydande nedbrytning. På vägen stoppas trafiken av busshållplatser på vägen. Ytan kännetecknas av dåligt tekniskt skick – det finns deformationer, stötar, längsgående och tvärgående sprickor, många defekter och fläckar. De befintliga trottoarerna är också i dåligt tekniskt skick. Avsaknaden av ett funktionellt uttorkningssystem bidrar till försämrade trafiksäkerhetsförhållanden. Investeringen omfattar:- korrigering av den provinsiella vägens geometri vid korsningen mellan ul. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. Som ett resultat av investeringen 2017 kommer 2 171,94 m vojvodskeppsväg nr 194 och kulverter och brostruktur att byggas om. (Swedish) / qualifier
 
point in time: 3 November 2022
Timestamp+2022-11-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Proiectul este situat în Voievodatul Wielkopolskie, județul Pilskie, comuna Wyrzysk. Obiectul studiului este extinderea Drumului Voievodatului nr. 194 pe lungimea de 2 171,94 m în Wyrzysk. În prezent, drumul nr. 194 de pe secțiunea de trecere a orașului Wyrzysk prezintă o degradare semnificativă. Pe drum, traficul este oprit de stațiile de autobuz pe drum. Suprafața se caracterizează printr-o stare tehnică slabă – există deformări, umflături, fisuri longitudinale și transversale, numeroase defecte și patch-uri. Trotuarele existente sunt, de asemenea, într-o stare tehnică precară. Lipsa unui sistem funcțional de deshidratare contribuie la deteriorarea condițiilor de siguranță rutieră. Investiția include:- corectarea geometriei drumului provincial la intersecția ul. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. Ca urmare a investiției din 2017, vor fi reconstruite 2 171,94 m de drum al voievodatului nr. 194 și de poduri și structuri de poduri. (Romanian)
Property / summary: Proiectul este situat în Voievodatul Wielkopolskie, județul Pilskie, comuna Wyrzysk. Obiectul studiului este extinderea Drumului Voievodatului nr. 194 pe lungimea de 2 171,94 m în Wyrzysk. În prezent, drumul nr. 194 de pe secțiunea de trecere a orașului Wyrzysk prezintă o degradare semnificativă. Pe drum, traficul este oprit de stațiile de autobuz pe drum. Suprafața se caracterizează printr-o stare tehnică slabă – există deformări, umflături, fisuri longitudinale și transversale, numeroase defecte și patch-uri. Trotuarele existente sunt, de asemenea, într-o stare tehnică precară. Lipsa unui sistem funcțional de deshidratare contribuie la deteriorarea condițiilor de siguranță rutieră. Investiția include:- corectarea geometriei drumului provincial la intersecția ul. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. Ca urmare a investiției din 2017, vor fi reconstruite 2 171,94 m de drum al voievodatului nr. 194 și de poduri și structuri de poduri. (Romanian) / rank
 
Normal rank
Property / summary: Proiectul este situat în Voievodatul Wielkopolskie, județul Pilskie, comuna Wyrzysk. Obiectul studiului este extinderea Drumului Voievodatului nr. 194 pe lungimea de 2 171,94 m în Wyrzysk. În prezent, drumul nr. 194 de pe secțiunea de trecere a orașului Wyrzysk prezintă o degradare semnificativă. Pe drum, traficul este oprit de stațiile de autobuz pe drum. Suprafața se caracterizează printr-o stare tehnică slabă – există deformări, umflături, fisuri longitudinale și transversale, numeroase defecte și patch-uri. Trotuarele existente sunt, de asemenea, într-o stare tehnică precară. Lipsa unui sistem funcțional de deshidratare contribuie la deteriorarea condițiilor de siguranță rutieră. Investiția include:- corectarea geometriei drumului provincial la intersecția ul. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. Ca urmare a investiției din 2017, vor fi reconstruite 2 171,94 m de drum al voievodatului nr. 194 și de poduri și structuri de poduri. (Romanian) / qualifier
 
point in time: 3 November 2022
Timestamp+2022-11-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Projekt se nahaja v vojvodstvu Wielkopolskie, okrožje Pilskie, občina Wyrzysk. Predmet študije je razširitev Voivodeship Road št. 194 na dolžino 2 171,94 m v Wyrzysku. Cesta št. 194 na odseku križišča Wyrzysk trenutno kaže znatno degradacijo. Na cesti se promet ustavi z avtobusnimi postajališči na cesti. Za površino je značilno slabo tehnično stanje – obstajajo deformacije, izbokline, vzdolžne in prečne razpoke, številne napake in obliži. Tudi obstoječe pločnike so v slabem tehničnem stanju. Pomanjkanje funkcionalnega sistema za dehidracijo prispeva k poslabšanju razmer na področju varnosti v cestnem prometu. Naložba vključuje:- popravek geometrije pokrajinske ceste na križišču ul. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. Zaradi investicije v letu 2017 bo obnovljenih 2 171,94 m vojvodske ceste št. 194 ter stružnice in mostne konstrukcije. (Slovenian)
Property / summary: Projekt se nahaja v vojvodstvu Wielkopolskie, okrožje Pilskie, občina Wyrzysk. Predmet študije je razširitev Voivodeship Road št. 194 na dolžino 2 171,94 m v Wyrzysku. Cesta št. 194 na odseku križišča Wyrzysk trenutno kaže znatno degradacijo. Na cesti se promet ustavi z avtobusnimi postajališči na cesti. Za površino je značilno slabo tehnično stanje – obstajajo deformacije, izbokline, vzdolžne in prečne razpoke, številne napake in obliži. Tudi obstoječe pločnike so v slabem tehničnem stanju. Pomanjkanje funkcionalnega sistema za dehidracijo prispeva k poslabšanju razmer na področju varnosti v cestnem prometu. Naložba vključuje:- popravek geometrije pokrajinske ceste na križišču ul. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. Zaradi investicije v letu 2017 bo obnovljenih 2 171,94 m vojvodske ceste št. 194 ter stružnice in mostne konstrukcije. (Slovenian) / rank
 
Normal rank
Property / summary: Projekt se nahaja v vojvodstvu Wielkopolskie, okrožje Pilskie, občina Wyrzysk. Predmet študije je razširitev Voivodeship Road št. 194 na dolžino 2 171,94 m v Wyrzysku. Cesta št. 194 na odseku križišča Wyrzysk trenutno kaže znatno degradacijo. Na cesti se promet ustavi z avtobusnimi postajališči na cesti. Za površino je značilno slabo tehnično stanje – obstajajo deformacije, izbokline, vzdolžne in prečne razpoke, številne napake in obliži. Tudi obstoječe pločnike so v slabem tehničnem stanju. Pomanjkanje funkcionalnega sistema za dehidracijo prispeva k poslabšanju razmer na področju varnosti v cestnem prometu. Naložba vključuje:- popravek geometrije pokrajinske ceste na križišču ul. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. Zaradi investicije v letu 2017 bo obnovljenih 2 171,94 m vojvodske ceste št. 194 ter stružnice in mostne konstrukcije. (Slovenian) / qualifier
 
point in time: 3 November 2022
Timestamp+2022-11-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Projektas vykdomas Wielkopolskie vaivadijoje, Pilskie apskrityje, Vyrzysko savivaldybėje. Tyrimo objektas – vaivadijos kelio Nr. 194 pratęsimas dėl 2 171,94 m ilgio Wyrzysk. Šiuo metu Vyrzysko sankryžos ruože kelio Nr. 194 būklė labai blogėja. Kelyje eismas sustabdomas autobusų stotelėmis kelyje. Paviršius pasižymi prasta technine būkle – yra deformacijos, iškilimai, išilginiai ir skersiniai įtrūkimai, daugybė defektų ir pleistrų. Esami šaligatviai taip pat yra prastos techninės būklės. Funkcinės dehidratacijos sistemos nebuvimas prisideda prie kelių eismo saugos sąlygų blogėjimo. Investicijos apima:- provincijos kelio geometrijos pataisą ul sankirtoje. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. Dėl investicijų 2017 m. bus atstatytas 2 171,94 m vaivadijos kelias Nr. 194 ir pralaidos bei tilto konstrukcija. (Lithuanian)
Property / summary: Projektas vykdomas Wielkopolskie vaivadijoje, Pilskie apskrityje, Vyrzysko savivaldybėje. Tyrimo objektas – vaivadijos kelio Nr. 194 pratęsimas dėl 2 171,94 m ilgio Wyrzysk. Šiuo metu Vyrzysko sankryžos ruože kelio Nr. 194 būklė labai blogėja. Kelyje eismas sustabdomas autobusų stotelėmis kelyje. Paviršius pasižymi prasta technine būkle – yra deformacijos, iškilimai, išilginiai ir skersiniai įtrūkimai, daugybė defektų ir pleistrų. Esami šaligatviai taip pat yra prastos techninės būklės. Funkcinės dehidratacijos sistemos nebuvimas prisideda prie kelių eismo saugos sąlygų blogėjimo. Investicijos apima:- provincijos kelio geometrijos pataisą ul sankirtoje. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. Dėl investicijų 2017 m. bus atstatytas 2 171,94 m vaivadijos kelias Nr. 194 ir pralaidos bei tilto konstrukcija. (Lithuanian) / rank
 
Normal rank
Property / summary: Projektas vykdomas Wielkopolskie vaivadijoje, Pilskie apskrityje, Vyrzysko savivaldybėje. Tyrimo objektas – vaivadijos kelio Nr. 194 pratęsimas dėl 2 171,94 m ilgio Wyrzysk. Šiuo metu Vyrzysko sankryžos ruože kelio Nr. 194 būklė labai blogėja. Kelyje eismas sustabdomas autobusų stotelėmis kelyje. Paviršius pasižymi prasta technine būkle – yra deformacijos, iškilimai, išilginiai ir skersiniai įtrūkimai, daugybė defektų ir pleistrų. Esami šaligatviai taip pat yra prastos techninės būklės. Funkcinės dehidratacijos sistemos nebuvimas prisideda prie kelių eismo saugos sąlygų blogėjimo. Investicijos apima:- provincijos kelio geometrijos pataisą ul sankirtoje. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. Dėl investicijų 2017 m. bus atstatytas 2 171,94 m vaivadijos kelias Nr. 194 ir pralaidos bei tilto konstrukcija. (Lithuanian) / qualifier
 
point in time: 3 November 2022
Timestamp+2022-11-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
A projekt Wielkopolskie vajdaságban, Pilskie megyében, Wyrzysk községben található. A tanulmány tárgya a 194. számú vajdasági út kiterjesztése Wyrzyskben 2 171,94 m hosszúsággal. Jelenleg Wyrzysk kereszteződésében a 194-es út jelentős romlást mutat. Az úton a forgalom megáll a buszmegállók az úton. A felületet rossz műszaki állapot jellemzi – vannak deformációk, dudorok, hosszanti és keresztirányú repedések, számos hiba és folt. A meglévő járdák is rossz műszaki állapotban vannak. A funkcionális dehidratációs rendszer hiánya hozzájárul a közúti közlekedésbiztonsági feltételek romlásához. A beruházás magában foglalja: – a tartományi út geometriájának korrekciója az ul metszéspontján. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. A 2017-es beruházás eredményeként a 194. sz. vajdasági út 2 171,94 m-es szakaszát, valamint a hídszerkezetet újjáépítik. (Hungarian)
Property / summary: A projekt Wielkopolskie vajdaságban, Pilskie megyében, Wyrzysk községben található. A tanulmány tárgya a 194. számú vajdasági út kiterjesztése Wyrzyskben 2 171,94 m hosszúsággal. Jelenleg Wyrzysk kereszteződésében a 194-es út jelentős romlást mutat. Az úton a forgalom megáll a buszmegállók az úton. A felületet rossz műszaki állapot jellemzi – vannak deformációk, dudorok, hosszanti és keresztirányú repedések, számos hiba és folt. A meglévő járdák is rossz műszaki állapotban vannak. A funkcionális dehidratációs rendszer hiánya hozzájárul a közúti közlekedésbiztonsági feltételek romlásához. A beruházás magában foglalja: – a tartományi út geometriájának korrekciója az ul metszéspontján. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. A 2017-es beruházás eredményeként a 194. sz. vajdasági út 2 171,94 m-es szakaszát, valamint a hídszerkezetet újjáépítik. (Hungarian) / rank
 
Normal rank
Property / summary: A projekt Wielkopolskie vajdaságban, Pilskie megyében, Wyrzysk községben található. A tanulmány tárgya a 194. számú vajdasági út kiterjesztése Wyrzyskben 2 171,94 m hosszúsággal. Jelenleg Wyrzysk kereszteződésében a 194-es út jelentős romlást mutat. Az úton a forgalom megáll a buszmegállók az úton. A felületet rossz műszaki állapot jellemzi – vannak deformációk, dudorok, hosszanti és keresztirányú repedések, számos hiba és folt. A meglévő járdák is rossz műszaki állapotban vannak. A funkcionális dehidratációs rendszer hiánya hozzájárul a közúti közlekedésbiztonsági feltételek romlásához. A beruházás magában foglalja: – a tartományi út geometriájának korrekciója az ul metszéspontján. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. A 2017-es beruházás eredményeként a 194. sz. vajdasági út 2 171,94 m-es szakaszát, valamint a hídszerkezetet újjáépítik. (Hungarian) / qualifier
 
point in time: 3 November 2022
Timestamp+2022-11-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Hanke sijaitsee Wielkopolskien voivodikunnassa, Pilskien läänissä, Wyrzyskin kunnassa. Tutkimuksen kohteena on Voivodeship Road nro 194:n laajennus, jonka pituus on 2 171,94 m Wyrzyskissa. Tällä hetkellä Wyrzyskin risteyksellä oleva tie nro 194 hajoaa merkittävästi. Tiellä liikenne pysähtyy bussipysäkeillä tiellä. Pinnalle on ominaista huono tekninen kunto – on muodonmuutoksia, kuoppia, pitkittäis- ja poikittaishalkeamia, lukuisia vikoja ja laastareita. Nykyiset jalkakäytävät ovat myös huonossa teknisessä kunnossa. Toiminnallisen nestehukkajärjestelmän puuttuminen heikentää liikenneturvallisuusolosuhteita. Investointi sisältää:- maakuntien tien geometrian korjaus ul:n risteyksessä. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. Vuoden 2017 investoinnin tuloksena rakennetaan uudelleen 2 171,94 m voivodilaivatie nro 194 sekä rummut ja siltarakenne. (Finnish)
Property / summary: Hanke sijaitsee Wielkopolskien voivodikunnassa, Pilskien läänissä, Wyrzyskin kunnassa. Tutkimuksen kohteena on Voivodeship Road nro 194:n laajennus, jonka pituus on 2 171,94 m Wyrzyskissa. Tällä hetkellä Wyrzyskin risteyksellä oleva tie nro 194 hajoaa merkittävästi. Tiellä liikenne pysähtyy bussipysäkeillä tiellä. Pinnalle on ominaista huono tekninen kunto – on muodonmuutoksia, kuoppia, pitkittäis- ja poikittaishalkeamia, lukuisia vikoja ja laastareita. Nykyiset jalkakäytävät ovat myös huonossa teknisessä kunnossa. Toiminnallisen nestehukkajärjestelmän puuttuminen heikentää liikenneturvallisuusolosuhteita. Investointi sisältää:- maakuntien tien geometrian korjaus ul:n risteyksessä. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. Vuoden 2017 investoinnin tuloksena rakennetaan uudelleen 2 171,94 m voivodilaivatie nro 194 sekä rummut ja siltarakenne. (Finnish) / rank
 
Normal rank
Property / summary: Hanke sijaitsee Wielkopolskien voivodikunnassa, Pilskien läänissä, Wyrzyskin kunnassa. Tutkimuksen kohteena on Voivodeship Road nro 194:n laajennus, jonka pituus on 2 171,94 m Wyrzyskissa. Tällä hetkellä Wyrzyskin risteyksellä oleva tie nro 194 hajoaa merkittävästi. Tiellä liikenne pysähtyy bussipysäkeillä tiellä. Pinnalle on ominaista huono tekninen kunto – on muodonmuutoksia, kuoppia, pitkittäis- ja poikittaishalkeamia, lukuisia vikoja ja laastareita. Nykyiset jalkakäytävät ovat myös huonossa teknisessä kunnossa. Toiminnallisen nestehukkajärjestelmän puuttuminen heikentää liikenneturvallisuusolosuhteita. Investointi sisältää:- maakuntien tien geometrian korjaus ul:n risteyksessä. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. Vuoden 2017 investoinnin tuloksena rakennetaan uudelleen 2 171,94 m voivodilaivatie nro 194 sekä rummut ja siltarakenne. (Finnish) / qualifier
 
point in time: 3 November 2022
Timestamp+2022-11-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Projekt sa nachádza vo Wielkopolskom vojvodstve, Pilskie County v obci Wyrzysk. Predmetom štúdie je rozšírenie Voivodeship Road č. 194 na dĺžku 2 171,94 m vo Wyrzysku. V súčasnosti vykazuje cesta č. 194 na križovatke Wyrzysk významnú degradáciu. Na ceste je premávka zastavená autobusovými zastávkami na ceste. Povrch sa vyznačuje zlým technickým stavom – existujú deformácie, hrbole, pozdĺžne a priečne praskliny, početné chyby a škvrny. Existujúce chodníky sú tiež v zlom technickom stave. Nedostatok funkčného systému dehydratácie prispieva k zhoršeniu podmienok bezpečnosti cestnej premávky. Investícia zahŕňa:- korekciu geometrie provinčnej cesty na križovatke ul. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. V dôsledku investície v roku 2017 bude prestavaných 2 171,94 m náboženskej cesty č. 194 a prestavby a mostné stavby. (Slovak)
Property / summary: Projekt sa nachádza vo Wielkopolskom vojvodstve, Pilskie County v obci Wyrzysk. Predmetom štúdie je rozšírenie Voivodeship Road č. 194 na dĺžku 2 171,94 m vo Wyrzysku. V súčasnosti vykazuje cesta č. 194 na križovatke Wyrzysk významnú degradáciu. Na ceste je premávka zastavená autobusovými zastávkami na ceste. Povrch sa vyznačuje zlým technickým stavom – existujú deformácie, hrbole, pozdĺžne a priečne praskliny, početné chyby a škvrny. Existujúce chodníky sú tiež v zlom technickom stave. Nedostatok funkčného systému dehydratácie prispieva k zhoršeniu podmienok bezpečnosti cestnej premávky. Investícia zahŕňa:- korekciu geometrie provinčnej cesty na križovatke ul. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. V dôsledku investície v roku 2017 bude prestavaných 2 171,94 m náboženskej cesty č. 194 a prestavby a mostné stavby. (Slovak) / rank
 
Normal rank
Property / summary: Projekt sa nachádza vo Wielkopolskom vojvodstve, Pilskie County v obci Wyrzysk. Predmetom štúdie je rozšírenie Voivodeship Road č. 194 na dĺžku 2 171,94 m vo Wyrzysku. V súčasnosti vykazuje cesta č. 194 na križovatke Wyrzysk významnú degradáciu. Na ceste je premávka zastavená autobusovými zastávkami na ceste. Povrch sa vyznačuje zlým technickým stavom – existujú deformácie, hrbole, pozdĺžne a priečne praskliny, početné chyby a škvrny. Existujúce chodníky sú tiež v zlom technickom stave. Nedostatok funkčného systému dehydratácie prispieva k zhoršeniu podmienok bezpečnosti cestnej premávky. Investícia zahŕňa:- korekciu geometrie provinčnej cesty na križovatke ul. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. V dôsledku investície v roku 2017 bude prestavaných 2 171,94 m náboženskej cesty č. 194 a prestavby a mostné stavby. (Slovak) / qualifier
 
point in time: 3 November 2022
Timestamp+2022-11-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Projekt asub Wielkopolskie vojevoodkonnas, Pilskie maakonnas, Wyrzyski kommuunis. Uuringu teemaks on vojevoodkonna tee nr 194 pikendamine Wyrzyskis 2 171,94 m pikkusel. Praegu halveneb Wyrzyski ristumislõigu maantee nr 194 märkimisväärselt. Maanteel peatub liiklus maanteel bussipeatustega. Pinda iseloomustab halb tehniline seisund – on deformatsioone, muhke, piki- ja põiki pragusid, arvukaid defekte ja plaastreid. Ka olemasolevad kõnniteed on halvas tehnilises seisukorras. Funktsionaalse dehüdratsioonisüsteemi puudumine aitab kaasa liiklusohutuse halvenemisele. Investeering hõlmab:- provintsi maantee geomeetria korrigeerimist ul ristumiskohas. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. 2017. aasta investeeringu tulemusena ehitatakse ümber 2 171,94 m vojevoodkonnamaanteed nr 194 ning kultivaatorid ja sillakonstruktsioonid. (Estonian)
Property / summary: Projekt asub Wielkopolskie vojevoodkonnas, Pilskie maakonnas, Wyrzyski kommuunis. Uuringu teemaks on vojevoodkonna tee nr 194 pikendamine Wyrzyskis 2 171,94 m pikkusel. Praegu halveneb Wyrzyski ristumislõigu maantee nr 194 märkimisväärselt. Maanteel peatub liiklus maanteel bussipeatustega. Pinda iseloomustab halb tehniline seisund – on deformatsioone, muhke, piki- ja põiki pragusid, arvukaid defekte ja plaastreid. Ka olemasolevad kõnniteed on halvas tehnilises seisukorras. Funktsionaalse dehüdratsioonisüsteemi puudumine aitab kaasa liiklusohutuse halvenemisele. Investeering hõlmab:- provintsi maantee geomeetria korrigeerimist ul ristumiskohas. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. 2017. aasta investeeringu tulemusena ehitatakse ümber 2 171,94 m vojevoodkonnamaanteed nr 194 ning kultivaatorid ja sillakonstruktsioonid. (Estonian) / rank
 
Normal rank
Property / summary: Projekt asub Wielkopolskie vojevoodkonnas, Pilskie maakonnas, Wyrzyski kommuunis. Uuringu teemaks on vojevoodkonna tee nr 194 pikendamine Wyrzyskis 2 171,94 m pikkusel. Praegu halveneb Wyrzyski ristumislõigu maantee nr 194 märkimisväärselt. Maanteel peatub liiklus maanteel bussipeatustega. Pinda iseloomustab halb tehniline seisund – on deformatsioone, muhke, piki- ja põiki pragusid, arvukaid defekte ja plaastreid. Ka olemasolevad kõnniteed on halvas tehnilises seisukorras. Funktsionaalse dehüdratsioonisüsteemi puudumine aitab kaasa liiklusohutuse halvenemisele. Investeering hõlmab:- provintsi maantee geomeetria korrigeerimist ul ristumiskohas. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. 2017. aasta investeeringu tulemusena ehitatakse ümber 2 171,94 m vojevoodkonnamaanteed nr 194 ning kultivaatorid ja sillakonstruktsioonid. (Estonian) / qualifier
 
point in time: 3 November 2022
Timestamp+2022-11-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Il-proġett jinsab fil-muniċipalità ta’ Wielkopolskie Voivodship, il-Kontea ta’ Pilskie, Wyrzysk. Is-suġġett tal-istudju huwa l-estensjoni tat-Triq Voivodeship Nru 194 fuq it-tul ta’ 2 171.94 m f’Wyrzysk. Bħalissa, it-triq Nru 194 dwar is-sezzjoni tal-qsim ta’ Wyrzysk qed turi degradazzjoni sinifikanti. Fit-triq, it-traffiku jitwaqqaf mill-waqfiet tal-karozzi tal-linja fit-triq. Il-wiċċ huwa kkaratterizzat minn kundizzjoni teknika ħażina — hemm deformazzjonijiet, ħotob, xquq lonġitudinali u trasversali, diversi difetti u rqajja’. Il-bankini eżistenti jinsabu wkoll f’kundizzjoni teknika ħażina. In-nuqqas ta’ sistema ta’ deidratazzjoni funzjonali jikkontribwixxi għad-deterjorament tal-kundizzjonijiet tas-sikurezza fit-toroq. L-investiment jinkludi:- korrezzjoni tal-ġeometrija tat-triq provinċjali fl-intersezzjoni ta’ ul. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. B’riżultat tal-investiment fl-2017, se jinbnew mill-ġdid 2 171.94 m ta’ triq voivodship Nru 194 u strutturi ta’ kanali u pontijiet. (Maltese)
Property / summary: Il-proġett jinsab fil-muniċipalità ta’ Wielkopolskie Voivodship, il-Kontea ta’ Pilskie, Wyrzysk. Is-suġġett tal-istudju huwa l-estensjoni tat-Triq Voivodeship Nru 194 fuq it-tul ta’ 2 171.94 m f’Wyrzysk. Bħalissa, it-triq Nru 194 dwar is-sezzjoni tal-qsim ta’ Wyrzysk qed turi degradazzjoni sinifikanti. Fit-triq, it-traffiku jitwaqqaf mill-waqfiet tal-karozzi tal-linja fit-triq. Il-wiċċ huwa kkaratterizzat minn kundizzjoni teknika ħażina — hemm deformazzjonijiet, ħotob, xquq lonġitudinali u trasversali, diversi difetti u rqajja’. Il-bankini eżistenti jinsabu wkoll f’kundizzjoni teknika ħażina. In-nuqqas ta’ sistema ta’ deidratazzjoni funzjonali jikkontribwixxi għad-deterjorament tal-kundizzjonijiet tas-sikurezza fit-toroq. L-investiment jinkludi:- korrezzjoni tal-ġeometrija tat-triq provinċjali fl-intersezzjoni ta’ ul. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. B’riżultat tal-investiment fl-2017, se jinbnew mill-ġdid 2 171.94 m ta’ triq voivodship Nru 194 u strutturi ta’ kanali u pontijiet. (Maltese) / rank
 
Normal rank
Property / summary: Il-proġett jinsab fil-muniċipalità ta’ Wielkopolskie Voivodship, il-Kontea ta’ Pilskie, Wyrzysk. Is-suġġett tal-istudju huwa l-estensjoni tat-Triq Voivodeship Nru 194 fuq it-tul ta’ 2 171.94 m f’Wyrzysk. Bħalissa, it-triq Nru 194 dwar is-sezzjoni tal-qsim ta’ Wyrzysk qed turi degradazzjoni sinifikanti. Fit-triq, it-traffiku jitwaqqaf mill-waqfiet tal-karozzi tal-linja fit-triq. Il-wiċċ huwa kkaratterizzat minn kundizzjoni teknika ħażina — hemm deformazzjonijiet, ħotob, xquq lonġitudinali u trasversali, diversi difetti u rqajja’. Il-bankini eżistenti jinsabu wkoll f’kundizzjoni teknika ħażina. In-nuqqas ta’ sistema ta’ deidratazzjoni funzjonali jikkontribwixxi għad-deterjorament tal-kundizzjonijiet tas-sikurezza fit-toroq. L-investiment jinkludi:- korrezzjoni tal-ġeometrija tat-triq provinċjali fl-intersezzjoni ta’ ul. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. B’riżultat tal-investiment fl-2017, se jinbnew mill-ġdid 2 171.94 m ta’ triq voivodship Nru 194 u strutturi ta’ kanali u pontijiet. (Maltese) / qualifier
 
point in time: 3 November 2022
Timestamp+2022-11-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Projekts atrodas Wielkopolskie vojevodistē, Pilskie apriņķī, Wyrzysk komūnā. Pētījuma priekšmets ir Vojevodistes ceļa Nr. 194 paplašināšana uz 2 171,94 m garumu Viržiskā. Šobrīd, ceļš Nr. 194 uz krustojuma posmā Viršinskas uzrāda ievērojamu degradāciju. Uz ceļa satiksme tiek apturēta ar autobusu pieturām uz ceļa. Virsmu raksturo slikts tehniskais stāvoklis — ir deformācijas, izciļņi, gareniskas un šķērsvirziena plaisas, daudzi defekti un plāksteri. Esošie ietves ir arī sliktā tehniskā stāvoklī. Funkcionālas dehidratācijas sistēmas trūkums veicina ceļu satiksmes drošības apstākļu pasliktināšanos. Investīcija ietver:- provinces ceļa ģeometrijas korekciju ul krustojumā. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. Investīciju rezultātā 2017. gadā tiks pārbūvēti 2 171,94 m vojevodistes ceļš Nr. 194 un caurtekas un tiltu konstrukcija. (Latvian)
Property / summary: Projekts atrodas Wielkopolskie vojevodistē, Pilskie apriņķī, Wyrzysk komūnā. Pētījuma priekšmets ir Vojevodistes ceļa Nr. 194 paplašināšana uz 2 171,94 m garumu Viržiskā. Šobrīd, ceļš Nr. 194 uz krustojuma posmā Viršinskas uzrāda ievērojamu degradāciju. Uz ceļa satiksme tiek apturēta ar autobusu pieturām uz ceļa. Virsmu raksturo slikts tehniskais stāvoklis — ir deformācijas, izciļņi, gareniskas un šķērsvirziena plaisas, daudzi defekti un plāksteri. Esošie ietves ir arī sliktā tehniskā stāvoklī. Funkcionālas dehidratācijas sistēmas trūkums veicina ceļu satiksmes drošības apstākļu pasliktināšanos. Investīcija ietver:- provinces ceļa ģeometrijas korekciju ul krustojumā. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. Investīciju rezultātā 2017. gadā tiks pārbūvēti 2 171,94 m vojevodistes ceļš Nr. 194 un caurtekas un tiltu konstrukcija. (Latvian) / rank
 
Normal rank
Property / summary: Projekts atrodas Wielkopolskie vojevodistē, Pilskie apriņķī, Wyrzysk komūnā. Pētījuma priekšmets ir Vojevodistes ceļa Nr. 194 paplašināšana uz 2 171,94 m garumu Viržiskā. Šobrīd, ceļš Nr. 194 uz krustojuma posmā Viršinskas uzrāda ievērojamu degradāciju. Uz ceļa satiksme tiek apturēta ar autobusu pieturām uz ceļa. Virsmu raksturo slikts tehniskais stāvoklis — ir deformācijas, izciļņi, gareniskas un šķērsvirziena plaisas, daudzi defekti un plāksteri. Esošie ietves ir arī sliktā tehniskā stāvoklī. Funkcionālas dehidratācijas sistēmas trūkums veicina ceļu satiksmes drošības apstākļu pasliktināšanos. Investīcija ietver:- provinces ceļa ģeometrijas korekciju ul krustojumā. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. Investīciju rezultātā 2017. gadā tiks pārbūvēti 2 171,94 m vojevodistes ceļš Nr. 194 un caurtekas un tiltu konstrukcija. (Latvian) / qualifier
 
point in time: 3 November 2022
Timestamp+2022-11-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Проектът се намира в Wielkopolskie Voivodship, Pilskie County, Wyrzysk commune. Предмет на изследването е удължаването на Войводския път № 194 по дължина от 2 171,94 m в Wyrzysk. В момента път № 194 в пресечната част на Wyrzysk показва значително влошаване. На пътя движението се спира с автобусни спирки на пътя. Повърхността се характеризира с лошо техническо състояние — има деформации, натъртвания, надлъжни и напречни пукнатини, многобройни дефекти и петна. Съществуващите настилки също са в лошо техническо състояние. Липсата на функционална система за дехидратация допринася за влошаването на условията за пътна безопасност. Инвестицията включва:- корекция на геометрията на провинциалния път на пресечната точка на ул. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. В резултат на инвестицията през 2017 г. ще бъдат възстановени 2 171,94 м. воеводски път № 194 и водовъртежи и мостова конструкция. (Bulgarian)
Property / summary: Проектът се намира в Wielkopolskie Voivodship, Pilskie County, Wyrzysk commune. Предмет на изследването е удължаването на Войводския път № 194 по дължина от 2 171,94 m в Wyrzysk. В момента път № 194 в пресечната част на Wyrzysk показва значително влошаване. На пътя движението се спира с автобусни спирки на пътя. Повърхността се характеризира с лошо техническо състояние — има деформации, натъртвания, надлъжни и напречни пукнатини, многобройни дефекти и петна. Съществуващите настилки също са в лошо техническо състояние. Липсата на функционална система за дехидратация допринася за влошаването на условията за пътна безопасност. Инвестицията включва:- корекция на геометрията на провинциалния път на пресечната точка на ул. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. В резултат на инвестицията през 2017 г. ще бъдат възстановени 2 171,94 м. воеводски път № 194 и водовъртежи и мостова конструкция. (Bulgarian) / rank
 
Normal rank
Property / summary: Проектът се намира в Wielkopolskie Voivodship, Pilskie County, Wyrzysk commune. Предмет на изследването е удължаването на Войводския път № 194 по дължина от 2 171,94 m в Wyrzysk. В момента път № 194 в пресечната част на Wyrzysk показва значително влошаване. На пътя движението се спира с автобусни спирки на пътя. Повърхността се характеризира с лошо техническо състояние — има деформации, натъртвания, надлъжни и напречни пукнатини, многобройни дефекти и петна. Съществуващите настилки също са в лошо техническо състояние. Липсата на функционална система за дехидратация допринася за влошаването на условията за пътна безопасност. Инвестицията включва:- корекция на геометрията на провинциалния път на пресечната точка на ул. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. В резултат на инвестицията през 2017 г. ще бъдат възстановени 2 171,94 м. воеводски път № 194 и водовъртежи и мостова конструкция. (Bulgarian) / qualifier
 
point in time: 3 November 2022
Timestamp+2022-11-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
O projeto está localizado em Wielkopolskie Voivodship, Condado de Pilskie, Wyrzysk. O tema do estudo é a extensão da Estrada Voivodia N.º 194 no comprimento de 2 171,94 m em Wyrzysk. De momento, a estrada n.º 194 na secção de passagem de Wyrzysk está a revelar uma degradação significativa. Na estrada, o trânsito é parado por paradas de Autocarros na estrada. A superfície é caracterizada por más condições técnicas — há deformações, solavancos, fissuras longitudinais e transversais, inúmeros defeitos e remendos. Os pavimentos existentes também se encontram em más condições técnicas. A falta de um sistema de desidratação funcional contribui para a deterioração das condições de segurança rodoviária. O investimento inclui:- correção da geometria da estrada provincial no cruzamento de ul. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. Como resultado do investimento em 2017, 2 171,94 m de voivodship estrada n.º 194 e sarjas e estrutura de pontes serão reconstruídos. (Portuguese)
Property / summary: O projeto está localizado em Wielkopolskie Voivodship, Condado de Pilskie, Wyrzysk. O tema do estudo é a extensão da Estrada Voivodia N.º 194 no comprimento de 2 171,94 m em Wyrzysk. De momento, a estrada n.º 194 na secção de passagem de Wyrzysk está a revelar uma degradação significativa. Na estrada, o trânsito é parado por paradas de Autocarros na estrada. A superfície é caracterizada por más condições técnicas — há deformações, solavancos, fissuras longitudinais e transversais, inúmeros defeitos e remendos. Os pavimentos existentes também se encontram em más condições técnicas. A falta de um sistema de desidratação funcional contribui para a deterioração das condições de segurança rodoviária. O investimento inclui:- correção da geometria da estrada provincial no cruzamento de ul. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. Como resultado do investimento em 2017, 2 171,94 m de voivodship estrada n.º 194 e sarjas e estrutura de pontes serão reconstruídos. (Portuguese) / rank
 
Normal rank
Property / summary: O projeto está localizado em Wielkopolskie Voivodship, Condado de Pilskie, Wyrzysk. O tema do estudo é a extensão da Estrada Voivodia N.º 194 no comprimento de 2 171,94 m em Wyrzysk. De momento, a estrada n.º 194 na secção de passagem de Wyrzysk está a revelar uma degradação significativa. Na estrada, o trânsito é parado por paradas de Autocarros na estrada. A superfície é caracterizada por más condições técnicas — há deformações, solavancos, fissuras longitudinais e transversais, inúmeros defeitos e remendos. Os pavimentos existentes também se encontram em más condições técnicas. A falta de um sistema de desidratação funcional contribui para a deterioração das condições de segurança rodoviária. O investimento inclui:- correção da geometria da estrada provincial no cruzamento de ul. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. Como resultado do investimento em 2017, 2 171,94 m de voivodship estrada n.º 194 e sarjas e estrutura de pontes serão reconstruídos. (Portuguese) / qualifier
 
point in time: 3 November 2022
Timestamp+2022-11-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Projekt se nalazi u Wielkopolskie Voivodship, Pilskie županija, Wyrzysk općina. Predmet studije je proširenje vojvodstva ceste br. 194 na duljinu 2 171,94 m u Wyrzysk. U ovom trenutku cesta br. 194 na dijelu prijelaza Wyrzysk pokazuje značajnu degradaciju. Na cesti je promet zaustavljen autobusnim stanicama na cesti. Površinu karakterizira loše tehničko stanje – postoje deformacije, neravnine, uzdužne i poprečne pukotine, brojni nedostaci i zakrpe. Postojeći pločnici su također u lošem tehničkom stanju. Nedostatak funkcionalnog sustava dehidracije pridonosi pogoršanju uvjeta sigurnosti na cestama. Investicija uključuje:- korekciju geometrije pokrajinske ceste na raskrižju ul. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. Kao rezultat ulaganja u 2017., 2 171,94 m voivodship ceste br. 194 i propusta i strukture mostova će biti obnovljena. (Croatian)
Property / summary: Projekt se nalazi u Wielkopolskie Voivodship, Pilskie županija, Wyrzysk općina. Predmet studije je proširenje vojvodstva ceste br. 194 na duljinu 2 171,94 m u Wyrzysk. U ovom trenutku cesta br. 194 na dijelu prijelaza Wyrzysk pokazuje značajnu degradaciju. Na cesti je promet zaustavljen autobusnim stanicama na cesti. Površinu karakterizira loše tehničko stanje – postoje deformacije, neravnine, uzdužne i poprečne pukotine, brojni nedostaci i zakrpe. Postojeći pločnici su također u lošem tehničkom stanju. Nedostatak funkcionalnog sustava dehidracije pridonosi pogoršanju uvjeta sigurnosti na cestama. Investicija uključuje:- korekciju geometrije pokrajinske ceste na raskrižju ul. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. Kao rezultat ulaganja u 2017., 2 171,94 m voivodship ceste br. 194 i propusta i strukture mostova će biti obnovljena. (Croatian) / rank
 
Normal rank
Property / summary: Projekt se nalazi u Wielkopolskie Voivodship, Pilskie županija, Wyrzysk općina. Predmet studije je proširenje vojvodstva ceste br. 194 na duljinu 2 171,94 m u Wyrzysk. U ovom trenutku cesta br. 194 na dijelu prijelaza Wyrzysk pokazuje značajnu degradaciju. Na cesti je promet zaustavljen autobusnim stanicama na cesti. Površinu karakterizira loše tehničko stanje – postoje deformacije, neravnine, uzdužne i poprečne pukotine, brojni nedostaci i zakrpe. Postojeći pločnici su također u lošem tehničkom stanju. Nedostatak funkcionalnog sustava dehidracije pridonosi pogoršanju uvjeta sigurnosti na cestama. Investicija uključuje:- korekciju geometrije pokrajinske ceste na raskrižju ul. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. Kao rezultat ulaganja u 2017., 2 171,94 m voivodship ceste br. 194 i propusta i strukture mostova će biti obnovljena. (Croatian) / qualifier
 
point in time: 3 November 2022
Timestamp+2022-11-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Projekt se nachází v obci Wielkopolskie Voivodship, okres Pilskie, obec Wyrzysk. Předmětem studie je rozšíření Voivodeship Road č. 194 o délce 2 171,94 m ve Wyrzysku. V současné době silnice č. 194 na přejezdovém úseku Wyrzysku vykazuje výraznou degradaci. Na silnici je doprava zastavena autobusovými zastávkami na silnici. Povrch je charakterizován špatným technickým stavem – existují deformace, hrboly, podélné a příčné trhliny, četné vady a náplasti. Stávající chodníky jsou také ve špatném technickém stavu. Nedostatek funkčního systému dehydratace přispívá ke zhoršení podmínek bezpečnosti silničního provozu. Investice zahrnuje:- korekce geometrie provinční silnice na křižovatce ul. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. V důsledku investice v roce 2017 bude přestavěno 2 171,94 m voivodship silnice č. 194 a propustky a mostní konstrukce. (Czech)
Property / summary: Projekt se nachází v obci Wielkopolskie Voivodship, okres Pilskie, obec Wyrzysk. Předmětem studie je rozšíření Voivodeship Road č. 194 o délce 2 171,94 m ve Wyrzysku. V současné době silnice č. 194 na přejezdovém úseku Wyrzysku vykazuje výraznou degradaci. Na silnici je doprava zastavena autobusovými zastávkami na silnici. Povrch je charakterizován špatným technickým stavem – existují deformace, hrboly, podélné a příčné trhliny, četné vady a náplasti. Stávající chodníky jsou také ve špatném technickém stavu. Nedostatek funkčního systému dehydratace přispívá ke zhoršení podmínek bezpečnosti silničního provozu. Investice zahrnuje:- korekce geometrie provinční silnice na křižovatce ul. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. V důsledku investice v roce 2017 bude přestavěno 2 171,94 m voivodship silnice č. 194 a propustky a mostní konstrukce. (Czech) / rank
 
Normal rank
Property / summary: Projekt se nachází v obci Wielkopolskie Voivodship, okres Pilskie, obec Wyrzysk. Předmětem studie je rozšíření Voivodeship Road č. 194 o délce 2 171,94 m ve Wyrzysku. V současné době silnice č. 194 na přejezdovém úseku Wyrzysku vykazuje výraznou degradaci. Na silnici je doprava zastavena autobusovými zastávkami na silnici. Povrch je charakterizován špatným technickým stavem – existují deformace, hrboly, podélné a příčné trhliny, četné vady a náplasti. Stávající chodníky jsou také ve špatném technickém stavu. Nedostatek funkčního systému dehydratace přispívá ke zhoršení podmínek bezpečnosti silničního provozu. Investice zahrnuje:- korekce geometrie provinční silnice na křižovatce ul. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. V důsledku investice v roce 2017 bude přestavěno 2 171,94 m voivodship silnice č. 194 a propustky a mostní konstrukce. (Czech) / qualifier
 
point in time: 3 November 2022
Timestamp+2022-11-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 13:15, 3 November 2022

Project Q135163 in Poland
Language Label Description Also known as
English
Extension of Voivodeship Road No. 194 Wyrzysk-Gołańcz in Wyrzysk
Project Q135163 in Poland

    Statements

    0 references
    0 references
    5,600,151.73 zloty
    0 references
    1,244,913.73 Euro
    13 January 2020
    0 references
    6,588,413.82 zloty
    0 references
    1,464,604.39 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    30 May 2016
    0 references
    31 December 2017
    0 references
    SAMORZĄD WOJEWÓDZTWA WIELKOPOLSKIEGO
    0 references
    0 references

    53°9'27.83"N, 16°53'34.84"E
    0 references
    Projektowana inwestycja zlokalizowana jest w województwie wielkopolskim, w powiecie pilskim, w gminie Wyrzysk. Przedmiotem opracowania jest rozbudowa drogi wojewódzkiej nr 194 na odcinku długości 2 171,94 m w m. Wyrzysk. W chwili obecnej droga nr 194 na odcinku przejścia przez m. Wyrzysk wykazuje znaczną degradację. Na drodze ruch drogowy wstrzymywany jest przez zatrzymujące się na jezdni autobusy. Nawierzchnia charakteryzuje się złym stanem technicznym – występują deformacje, wyboje, spękania podłużne i poprzeczne, liczne ubytki i łaty. Istniejące chodniki są również w złym stanie technicznym. Brak funkcjonalnego systemu odwodnienia przyczynia się do pogarszania warunków bezpieczeństwa ruchu drogowego. Inwestycja obejmuje:- korektę geometrii drogi wojewódzkiej na skrzyżowaniu ul. Bydgoskiej z Staszica i Kościuszki,- rozbiórkę istniejącej i wykonanie nowej konstrukcji jezdni,- przebudowę – budowę chodników,- budowę nowych zatok autobusowych oraz przebudowę istniejących,- przebudowę skrzyżowań drogi wojewódzkiej z drogami gminnymi, powiatowymi (ulicami),- przebudowie zjazdów indywidualnych oraz publicznych w ciągu drogi wojewódzkiej – strona prawa i lewa,- budowie kanalizacji deszczowej w celu poprawy warunków odwodnienia,- wycince i zabezpieczeniu istniejących drzew i krzaków zlokalizowanych w śladzie projektowanej rozbudowy,- wykonaniu nowego oznakowania poziomego i pionowego,- usunięcie kolizji z istniejącą infrastrukturą techniczną,- remoncie istniejącego obiektu mostowego od km 0+374,04 do km 0+411,88,- budowie oświetlenia drogowego przy nowym rondzie,- przebudowie istniejącego przepustu w km 0+883,32. Projektowany zakres inwestycji zapewni odtworzenie istniejących połączeń drogowych i dojazd do wszystkich działek w liniach rozgraniczających. W wyniku zrealizowania inwestycji w roku 2017 przebudowanych zostanie 2 171,94 m drogi wojewódzkiej nr 194 i obiekty inżynieryjne przepust i obiekt mostowy. (Polish)
    0 references
    The project is located in Wielkopolskie Voivodship, Pilskie County, Wyrzysk commune. The subject of the study is the extension of the Voivodeship Road No. 194 on the length of 2171.94 m in Wyrzysk. At the moment, road No. 194 on the crossing section of Wyrzysk is showing significant degradation. On the road, traffic is stopped by bus stops on the road. The surface is characterised by poor technical condition – there are deformations, bumps, longitudinal and transverse cracks, numerous defects and patches. The existing pavements are also in poor technical condition. The lack of a functional dehydration system contributes to the deterioration of road safety conditions. The investment includes:- correction of the geometry of the provincial road at the intersection of ul. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. As a result of the investment in 2017, 2171.94 m of voivodship road No. 194 and culverts and bridge structure will be rebuilt. (English)
    21 October 2020
    0 references
    Le projet est situé dans la voïvodie de Wielkopolskie, dans le comté de Pilskie, dans la municipalité de Wyrzysk. Le sujet de l’étude est l’extension de la route provinciale no 194 sur une longueur de 2 171,94 m dans la ville de Wyrzysk. À l’heure actuelle, la route no 194 sur le tronçon du passage à travers la ville de Wyrzysk présente une dégradation significative. Sur la route, la circulation est stoppée par des bus s’arrêtant sur la route. La surface est caractérisée par de mauvaises conditions techniques — il y a des déformations, des bosses, des fissures longitudinales et transversales, de nombreux défauts et des taches. Les chaussées existantes sont également en mauvais état technique. L’absence d’un système de drainage fonctionnel contribue à la détérioration des conditions de sécurité routière. L’investissement comprend:- la correction de la géométrie de la route provinciale à l’intersection de l’ul. Bydgoszcz de Staszica et Kościuszki,- la démolition de la route existante et la construction d’une nouvelle chaussée,- la construction de trottoirs,- la construction de nouvelles baies d’autobus et la reconstruction des intersections existantes de la route provinciale avec des routes municipales, des routes de district (rues), — la reconstruction des sorties individuelles et publiques le long de la route provinciale — à droite et à gauche, construction d’un système d’eau de pluie pour améliorer les conditions de drainage,- l’abattage et la protection des arbres et des buissons existants situés dans la trace de l’extension prévue,- la mise en œuvre de nouveaux marquages horizontaux et verticaux,- l’élimination des collisions avec l’infrastructure technique existante,- la rénovation de l’installation de pont existante du km 0+ 374,04 au km 0+ 411,88,- la construction de l’éclairage routier au nouveau rond-point,- la reconstruction du ponceau existant au km 0+ 883,32. La portée prévue de l’investissement permettra de rétablir les liaisons routières existantes et d’accéder à toutes les parcelles de terrain situées dans les lignes de démarcation. À la suite de la réalisation de l’investissement en 2017, 2 171,94 m de la route provinciale no 194 et des ouvrages d’ingénierie du ponceau et de la structure du pont seront reconstruits. (French)
    2 December 2021
    0 references
    Das Projekt befindet sich in der Woiwodschaft Wielkopolskie im Bezirk Pilskie, Gemeinde Wyrzysk. Gegenstand der Studie ist die Verlängerung der Provinzstraße Nr. 194 auf einer Länge von 2 171,94 m in der Stadt Wyrzysk. Derzeit weist die Straße Nr. 194 auf dem Abschnitt des Durchgangs durch die Stadt Wyrzysk eine erhebliche Verschlechterung auf. Auf der Straße wird der Verkehr von Bussen angehalten, die auf der Straße halten. Die Oberfläche zeichnet sich durch einen schlechten technischen Zustand aus – es gibt Verformungen, Stöße, Längs- und Querrisse, zahlreiche Defekte und Flecken. Die vorhandenen Gehwege befinden sich auch in schlechtem technischen Zustand. Das Fehlen eines funktionalen Entwässerungssystems trägt zur Verschlechterung der Straßenverkehrssicherheit bei. Die Investition umfasst:- Korrektur der Geometrie der Provinzstraße an der Kreuzung von ul. Bydgoszcz von Staszica und Kościuszki,- der Abriss der bestehenden Straße und der Bau eines neuen Straßenbaus,- der Bau von Gehwegen,- der Bau neuer Busbuchten und der Wiederaufbau bestehender Kreuzungen der Provinzstraße mit kommunalen Straßen, Bezirksstraßen (Straßen), – Wiederaufbau von Einzel- und öffentlichen Ausfahrten entlang der Provinzstraße – rechts und links, Bau eines Regenwassersystems zur Verbesserung der Entwässerungsbedingungen,- Fällung und Schutz bestehender Bäume und Sträucher in der Spur der geplanten Erweiterung,- Einführung neuer horizontaler und vertikaler Markierungen,- Beseitigung von Kollisionen mit der bestehenden technischen Infrastruktur,- Sanierung der bestehenden Brückenanlage von km 0+ 374,04 bis km 0+ 411,88,- Bau der Straßenbeleuchtung am neuen Kreisverkehr,- Umbau des bestehenden Stollens in km 0+ 883,32. Der geplante Investitionsumfang wird die Wiederherstellung bestehender Straßenverbindungen und den Zugang zu allen Grundstücken in den Abgrenzungslinien gewährleisten. Als Ergebnis der Realisierung der Investition im Jahr 2017 werden 2 171,94 m der Provinzstraße Nr. 194 und die Konstruktionsstrukturen des Steil- und Brückenbaus wieder aufgebaut. (German)
    13 December 2021
    0 references
    Het project is gelegen in het woiwodschap Wielkopolskie in het district Pilskie in de gemeente Wyrzysk. Het onderwerp van de studie is de uitbreiding van de provinciale weg nr. 194 over een lengte van 2 171,94 m in de stad Wyrzysk. Op dit moment vertoont weg nr. 194 op het gedeelte van de doorgang door de stad Wyrzysk een aanzienlijke achteruitgang. Op de weg wordt het verkeer gestopt door bussen die op de weg stoppen. Het oppervlak wordt gekenmerkt door slechte technische conditie — er zijn vervormingen, hobbels, longitudinale en dwarsscheuren, tal van defecten en patches. De bestaande bestratingen verkeren ook in slechte technische staat. Het ontbreken van een functioneel drainagesysteem draagt bij tot een verslechtering van de verkeersveiligheid. De investering omvat:- correctie van de geometrie van de provinciale weg op het kruispunt van de ul. Bydgoszcz uit Staszica en Kościuszki,- de sloop van de bestaande weg en de bouw van een nieuwe wegenbouw,- de bouw van bestratingen,- de bouw van nieuwe busbekkens en de wederopbouw van bestaande kruispunten van de provinciale weg met gemeentelijke wegen, districtswegen (straten), — wederopbouw van individuele en openbare uitgangen langs de provinciale weg — rechts en links, bouw van een regenwatersysteem ter verbetering van de afwateringsomstandigheden,- kappen en bescherming van bestaande bomen en struiken gelegen in het spoor van de geplande uitbreiding,- de implementatie van nieuwe horizontale en verticale markeringen,- het verwijderen van botsingen met bestaande technische infrastructuur,- renovatie van de bestaande brugfaciliteit van km 0+ 374,04 tot km 0+ 411,88,- bouw van wegverlichting op de nieuwe rotonde,- reconstructie van de bestaande culvert in km 0+ 883,32. De geplande omvang van de investering zal zorgen voor het herstel van de bestaande wegenverbindingen en de toegang tot alle percelen in de afbakeningslijnen. Als gevolg van de realisatie van de investering in 2017, 2 171,94 m van provinciale weg nr. 194 en technische structuren van de culvert en brug structuur worden herbouwd. (Dutch)
    17 December 2021
    0 references
    Il progetto si trova nel voivodato di Wielkopolskie, nella contea di Pilskie, nel comune di Wyrzysk. Oggetto dello studio è l'estensione della strada provinciale n. 194 su una lunghezza di 2 171,94 m nella città di Wyrzysk. Attualmente, la strada n. 194 sul tratto del passaggio attraverso la città di Wyrzysk sta mostrando un degrado significativo. Sulla strada, il traffico è fermato da autobus che fermano sulla strada. La superficie è caratterizzata da cattive condizioni tecniche — ci sono deformazioni, urti, crepe longitudinali e trasversali, numerosi difetti e patch. Anche i marciapiedi esistenti sono in cattive condizioni tecniche. La mancanza di un sistema di drenaggio funzionale contribuisce al deterioramento delle condizioni di sicurezza stradale. L'investimento comprende:- correzione della geometria della strada provinciale all'incrocio di ul. Bydgoszcz da Staszica e Kościuszki,- la demolizione della strada esistente e la costruzione di una nuova costruzione di strade,- la costruzione di marciapiedi,- la costruzione di nuove baie di autobus e la ricostruzione di intersezioni esistenti della strada provinciale con strade comunali, strade distrettuali (vie), — ricostruzione di uscite individuali e pubbliche lungo la strada provinciale — la destra e il lato sinistro, costruzione di un sistema di acque piovane per migliorare le condizioni di drenaggio,- l'abbattimento e la protezione degli alberi e dei cespugli esistenti situati sulla traccia dell'estensione prevista,- l'attuazione di nuovi contrassegni orizzontali e verticali,- l'eliminazione delle collisioni con l'infrastruttura tecnica esistente,- la ristrutturazione dell'impianto di ponte esistente dal km 0+ 374,04 al km 0+ 411,88,- costruzione di illuminazione stradale nella nuova rotatoria,- ricostruzione del culvert esistente in km 0+ 883,32. La portata prevista dell'investimento garantirà il ripristino dei collegamenti stradali esistenti e l'accesso a tutti gli appezzamenti di terreno nelle linee di demarcazione. A seguito della realizzazione dell'investimento nel 2017, saranno ricostruiti 2 171,94 m di strada provinciale n. 194 e strutture ingegneristiche della struttura del ponte e del ponte. (Italian)
    15 January 2022
    0 references
    El proyecto se encuentra en el Voivodato de Wielkopolskie, condado de Pilskie, municipio de Wyrzysk. El objeto del estudio es la extensión de la carretera provincial n.º 194 sobre una longitud de 2 171,94 m en la ciudad de Wyrzysk. En la actualidad, la carretera n.º 194 en el tramo del paso a través de la ciudad de Wyrzysk está mostrando una degradación significativa. En la carretera, el tráfico es detenido por los autobuses que se detienen en la carretera. La superficie se caracteriza por un mal estado técnico — hay deformaciones, protuberancias, grietas longitudinales y transversales, numerosos defectos y parches. Los pavimentos existentes también están en malas condiciones técnicas. La falta de un sistema de drenaje funcional contribuye al deterioro de las condiciones de seguridad vial. La inversión incluye:- corrección de la geometría de la carretera provincial en la intersección de ul. Bydgoszcz de Staszica y Kościuszki,- la demolición de la carretera existente y la construcción de una nueva construcción de carreteras,- la construcción de pavimentos,- la construcción de nuevas bahías de autobuses y la reconstrucción de las intersecciones existentes de la carretera provincial con carreteras municipales, carreteras de distrito (calles), — reconstrucción de salidas individuales y públicas a lo largo de la carretera provincial — el lado derecho y el lado izquierdo, construcción de un sistema de aguas pluviales para mejorar las condiciones de drenaje,- tala y protección de árboles y arbustos existentes ubicados en el trazado de la extensión prevista,- la implementación de nuevas marcas horizontales y verticales,- la eliminación de colisiones con la infraestructura técnica existente,- la renovación de la instalación de puente existente desde el km 0+ 374,04 hasta el km 0+ 411,88,- construcción de alumbrado vial en la nueva rotonda,- reconstrucción de la alcantarilla existente en km 0+ 883,32. El alcance previsto de la inversión garantizará la restauración de las conexiones viales existentes y el acceso a todas las parcelas de las líneas de demarcación. Como resultado de la realización de la inversión en 2017, 2 171,94 m de carretera provincial n.º 194 y estructuras de ingeniería de la estructura de alcantarillado y puente serán reconstruidos. (Spanish)
    18 January 2022
    0 references
    Tá an tionscadal lonnaithe i Wielkopolskie Voivodship, Contae Pilskie, Wyrzysk commune. Is é ábhar an staidéir ná leathnú an Bhóthair Voivodeship Uimh 194 ar fhad 2 171.94 m i Wyrzysk. Faoi láthair, tá díghrádú suntasach á dhéanamh ar bhóthar Uimh. 194 ar an gcuid trasnaithe de Wyrzysk. Ar an mbóthar, stoptar an trácht ag stadanna bus ar an mbóthar. Tá droch-riocht teicniúil ag an dromchla — tá dífhoirmiú, bumps, scoilteanna fadaimseartha agus trasnach, lochtanna iomadúla agus paistí ann. Tá drochbhail theicniúil ar na cosáin atá ann cheana freisin. Cuireann an easpa córais díhiodráitithe fheidhmiúil leis an meath ar dhálaí sábháilteachta ar bhóithre. Áirítear leis an infheistíocht:- ceartú geoiméadracht an bhóthair cúige ag crosbhealach ul. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. Mar thoradh ar an infheistíocht i 2017, atógfar 2 171.94 m de bhóthar voivodship Uimh. 194 agus lintéir agus struchtúr droichid. (Irish)
    3 November 2022
    0 references
    Projektet er beliggende i Wielkopolskie Voivodship, Pilskie County, Wyrzysk kommune. Emnet for undersøgelsen er udvidelsen af Voivodeship Road No. 194 på længden af 2 171,94 m i Wyrzysk. I øjeblikket viser vej nr. 194 på krydset af Wyrzysk en betydelig nedbrydning. På vejen stoppes trafikken af busstoppesteder på vejen. Overfladen er kendetegnet ved dårlig teknisk stand — der er deformationer, bump, langsgående og tværgående revner, talrige defekter og patches. De eksisterende fortove er også i dårlig teknisk stand. Manglen på et funktionelt dehydreringssystem bidrager til forværringen af trafiksikkerheden. Investeringen omfatter:- korrektion af geometrien på provinsvejen i skæringspunktet mellem ul. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. Som følge af investeringen i 2017 vil 2 171,94 m voivodskabsvej nr. 194 og kulveller og brostruktur blive genopbygget. (Danish)
    3 November 2022
    0 references
    Το έργο βρίσκεται στο Wielkopolskie Voivodship, στην κομητεία Pilskie, στην κοινότητα Wyrzysk. Αντικείμενο της μελέτης είναι η επέκταση της οδού Βοϊβοδάτου αρ. 194 σε μήκος 2 171,94 m στο Wyrzysk. Επί του παρόντος, η οδός αριθ. 194 στο τμήμα διέλευσης του Wyrzysk παρουσιάζει σημαντική υποβάθμιση. Στο δρόμο, η κυκλοφορία διακόπτεται με στάσεις λεωφορείων στο δρόμο. Η επιφάνεια χαρακτηρίζεται από κακή τεχνική κατάσταση — υπάρχουν παραμορφώσεις, προσκρούσεις, διαμήκεις και εγκάρσιες ρωγμές, πολυάριθμα ελαττώματα και μπαλώματα. Τα υπάρχοντα πεζοδρόμια βρίσκονται επίσης σε κακή τεχνική κατάσταση. Η έλλειψη λειτουργικού συστήματος αφυδάτωσης συμβάλλει στην επιδείνωση των συνθηκών οδικής ασφάλειας. Η επένδυση περιλαμβάνει:- διόρθωση της γεωμετρίας της επαρχιακής οδού στη διασταύρωση του Ουλ. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. Ως αποτέλεσμα της επένδυσης το 2017, θα ανοικοδομηθούν 2 171,94 μ. βοεβοδάτου αρ. 194 και θα ανακατασκευαστούν οι οχτώστρες και η κατασκευή γεφυρών. (Greek)
    3 November 2022
    0 references
    Projektet ligger i Wielkopolskie Voivodship, Pilskie County, Wyrzysk kommun. Ämnet för studien är utvidgningen av Voivodeship Road nr 194 på längden av 2 171,94 m i Wyrzysk. Just nu, väg nr 194 på korsningen av Wyrzysk uppvisar betydande nedbrytning. På vägen stoppas trafiken av busshållplatser på vägen. Ytan kännetecknas av dåligt tekniskt skick – det finns deformationer, stötar, längsgående och tvärgående sprickor, många defekter och fläckar. De befintliga trottoarerna är också i dåligt tekniskt skick. Avsaknaden av ett funktionellt uttorkningssystem bidrar till försämrade trafiksäkerhetsförhållanden. Investeringen omfattar:- korrigering av den provinsiella vägens geometri vid korsningen mellan ul. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. Som ett resultat av investeringen 2017 kommer 2 171,94 m vojvodskeppsväg nr 194 och kulverter och brostruktur att byggas om. (Swedish)
    3 November 2022
    0 references
    Proiectul este situat în Voievodatul Wielkopolskie, județul Pilskie, comuna Wyrzysk. Obiectul studiului este extinderea Drumului Voievodatului nr. 194 pe lungimea de 2 171,94 m în Wyrzysk. În prezent, drumul nr. 194 de pe secțiunea de trecere a orașului Wyrzysk prezintă o degradare semnificativă. Pe drum, traficul este oprit de stațiile de autobuz pe drum. Suprafața se caracterizează printr-o stare tehnică slabă – există deformări, umflături, fisuri longitudinale și transversale, numeroase defecte și patch-uri. Trotuarele existente sunt, de asemenea, într-o stare tehnică precară. Lipsa unui sistem funcțional de deshidratare contribuie la deteriorarea condițiilor de siguranță rutieră. Investiția include:- corectarea geometriei drumului provincial la intersecția ul. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. Ca urmare a investiției din 2017, vor fi reconstruite 2 171,94 m de drum al voievodatului nr. 194 și de poduri și structuri de poduri. (Romanian)
    3 November 2022
    0 references
    Projekt se nahaja v vojvodstvu Wielkopolskie, okrožje Pilskie, občina Wyrzysk. Predmet študije je razširitev Voivodeship Road št. 194 na dolžino 2 171,94 m v Wyrzysku. Cesta št. 194 na odseku križišča Wyrzysk trenutno kaže znatno degradacijo. Na cesti se promet ustavi z avtobusnimi postajališči na cesti. Za površino je značilno slabo tehnično stanje – obstajajo deformacije, izbokline, vzdolžne in prečne razpoke, številne napake in obliži. Tudi obstoječe pločnike so v slabem tehničnem stanju. Pomanjkanje funkcionalnega sistema za dehidracijo prispeva k poslabšanju razmer na področju varnosti v cestnem prometu. Naložba vključuje:- popravek geometrije pokrajinske ceste na križišču ul. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. Zaradi investicije v letu 2017 bo obnovljenih 2 171,94 m vojvodske ceste št. 194 ter stružnice in mostne konstrukcije. (Slovenian)
    3 November 2022
    0 references
    Projektas vykdomas Wielkopolskie vaivadijoje, Pilskie apskrityje, Vyrzysko savivaldybėje. Tyrimo objektas – vaivadijos kelio Nr. 194 pratęsimas dėl 2 171,94 m ilgio Wyrzysk. Šiuo metu Vyrzysko sankryžos ruože kelio Nr. 194 būklė labai blogėja. Kelyje eismas sustabdomas autobusų stotelėmis kelyje. Paviršius pasižymi prasta technine būkle – yra deformacijos, iškilimai, išilginiai ir skersiniai įtrūkimai, daugybė defektų ir pleistrų. Esami šaligatviai taip pat yra prastos techninės būklės. Funkcinės dehidratacijos sistemos nebuvimas prisideda prie kelių eismo saugos sąlygų blogėjimo. Investicijos apima:- provincijos kelio geometrijos pataisą ul sankirtoje. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. Dėl investicijų 2017 m. bus atstatytas 2 171,94 m vaivadijos kelias Nr. 194 ir pralaidos bei tilto konstrukcija. (Lithuanian)
    3 November 2022
    0 references
    A projekt Wielkopolskie vajdaságban, Pilskie megyében, Wyrzysk községben található. A tanulmány tárgya a 194. számú vajdasági út kiterjesztése Wyrzyskben 2 171,94 m hosszúsággal. Jelenleg Wyrzysk kereszteződésében a 194-es út jelentős romlást mutat. Az úton a forgalom megáll a buszmegállók az úton. A felületet rossz műszaki állapot jellemzi – vannak deformációk, dudorok, hosszanti és keresztirányú repedések, számos hiba és folt. A meglévő járdák is rossz műszaki állapotban vannak. A funkcionális dehidratációs rendszer hiánya hozzájárul a közúti közlekedésbiztonsági feltételek romlásához. A beruházás magában foglalja: – a tartományi út geometriájának korrekciója az ul metszéspontján. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. A 2017-es beruházás eredményeként a 194. sz. vajdasági út 2 171,94 m-es szakaszát, valamint a hídszerkezetet újjáépítik. (Hungarian)
    3 November 2022
    0 references
    Hanke sijaitsee Wielkopolskien voivodikunnassa, Pilskien läänissä, Wyrzyskin kunnassa. Tutkimuksen kohteena on Voivodeship Road nro 194:n laajennus, jonka pituus on 2 171,94 m Wyrzyskissa. Tällä hetkellä Wyrzyskin risteyksellä oleva tie nro 194 hajoaa merkittävästi. Tiellä liikenne pysähtyy bussipysäkeillä tiellä. Pinnalle on ominaista huono tekninen kunto – on muodonmuutoksia, kuoppia, pitkittäis- ja poikittaishalkeamia, lukuisia vikoja ja laastareita. Nykyiset jalkakäytävät ovat myös huonossa teknisessä kunnossa. Toiminnallisen nestehukkajärjestelmän puuttuminen heikentää liikenneturvallisuusolosuhteita. Investointi sisältää:- maakuntien tien geometrian korjaus ul:n risteyksessä. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. Vuoden 2017 investoinnin tuloksena rakennetaan uudelleen 2 171,94 m voivodilaivatie nro 194 sekä rummut ja siltarakenne. (Finnish)
    3 November 2022
    0 references
    Projekt sa nachádza vo Wielkopolskom vojvodstve, Pilskie County v obci Wyrzysk. Predmetom štúdie je rozšírenie Voivodeship Road č. 194 na dĺžku 2 171,94 m vo Wyrzysku. V súčasnosti vykazuje cesta č. 194 na križovatke Wyrzysk významnú degradáciu. Na ceste je premávka zastavená autobusovými zastávkami na ceste. Povrch sa vyznačuje zlým technickým stavom – existujú deformácie, hrbole, pozdĺžne a priečne praskliny, početné chyby a škvrny. Existujúce chodníky sú tiež v zlom technickom stave. Nedostatok funkčného systému dehydratácie prispieva k zhoršeniu podmienok bezpečnosti cestnej premávky. Investícia zahŕňa:- korekciu geometrie provinčnej cesty na križovatke ul. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. V dôsledku investície v roku 2017 bude prestavaných 2 171,94 m náboženskej cesty č. 194 a prestavby a mostné stavby. (Slovak)
    3 November 2022
    0 references
    Projekt asub Wielkopolskie vojevoodkonnas, Pilskie maakonnas, Wyrzyski kommuunis. Uuringu teemaks on vojevoodkonna tee nr 194 pikendamine Wyrzyskis 2 171,94 m pikkusel. Praegu halveneb Wyrzyski ristumislõigu maantee nr 194 märkimisväärselt. Maanteel peatub liiklus maanteel bussipeatustega. Pinda iseloomustab halb tehniline seisund – on deformatsioone, muhke, piki- ja põiki pragusid, arvukaid defekte ja plaastreid. Ka olemasolevad kõnniteed on halvas tehnilises seisukorras. Funktsionaalse dehüdratsioonisüsteemi puudumine aitab kaasa liiklusohutuse halvenemisele. Investeering hõlmab:- provintsi maantee geomeetria korrigeerimist ul ristumiskohas. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. 2017. aasta investeeringu tulemusena ehitatakse ümber 2 171,94 m vojevoodkonnamaanteed nr 194 ning kultivaatorid ja sillakonstruktsioonid. (Estonian)
    3 November 2022
    0 references
    Il-proġett jinsab fil-muniċipalità ta’ Wielkopolskie Voivodship, il-Kontea ta’ Pilskie, Wyrzysk. Is-suġġett tal-istudju huwa l-estensjoni tat-Triq Voivodeship Nru 194 fuq it-tul ta’ 2 171.94 m f’Wyrzysk. Bħalissa, it-triq Nru 194 dwar is-sezzjoni tal-qsim ta’ Wyrzysk qed turi degradazzjoni sinifikanti. Fit-triq, it-traffiku jitwaqqaf mill-waqfiet tal-karozzi tal-linja fit-triq. Il-wiċċ huwa kkaratterizzat minn kundizzjoni teknika ħażina — hemm deformazzjonijiet, ħotob, xquq lonġitudinali u trasversali, diversi difetti u rqajja’. Il-bankini eżistenti jinsabu wkoll f’kundizzjoni teknika ħażina. In-nuqqas ta’ sistema ta’ deidratazzjoni funzjonali jikkontribwixxi għad-deterjorament tal-kundizzjonijiet tas-sikurezza fit-toroq. L-investiment jinkludi:- korrezzjoni tal-ġeometrija tat-triq provinċjali fl-intersezzjoni ta’ ul. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. B’riżultat tal-investiment fl-2017, se jinbnew mill-ġdid 2 171.94 m ta’ triq voivodship Nru 194 u strutturi ta’ kanali u pontijiet. (Maltese)
    3 November 2022
    0 references
    Projekts atrodas Wielkopolskie vojevodistē, Pilskie apriņķī, Wyrzysk komūnā. Pētījuma priekšmets ir Vojevodistes ceļa Nr. 194 paplašināšana uz 2 171,94 m garumu Viržiskā. Šobrīd, ceļš Nr. 194 uz krustojuma posmā Viršinskas uzrāda ievērojamu degradāciju. Uz ceļa satiksme tiek apturēta ar autobusu pieturām uz ceļa. Virsmu raksturo slikts tehniskais stāvoklis — ir deformācijas, izciļņi, gareniskas un šķērsvirziena plaisas, daudzi defekti un plāksteri. Esošie ietves ir arī sliktā tehniskā stāvoklī. Funkcionālas dehidratācijas sistēmas trūkums veicina ceļu satiksmes drošības apstākļu pasliktināšanos. Investīcija ietver:- provinces ceļa ģeometrijas korekciju ul krustojumā. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. Investīciju rezultātā 2017. gadā tiks pārbūvēti 2 171,94 m vojevodistes ceļš Nr. 194 un caurtekas un tiltu konstrukcija. (Latvian)
    3 November 2022
    0 references
    Проектът се намира в Wielkopolskie Voivodship, Pilskie County, Wyrzysk commune. Предмет на изследването е удължаването на Войводския път № 194 по дължина от 2 171,94 m в Wyrzysk. В момента път № 194 в пресечната част на Wyrzysk показва значително влошаване. На пътя движението се спира с автобусни спирки на пътя. Повърхността се характеризира с лошо техническо състояние — има деформации, натъртвания, надлъжни и напречни пукнатини, многобройни дефекти и петна. Съществуващите настилки също са в лошо техническо състояние. Липсата на функционална система за дехидратация допринася за влошаването на условията за пътна безопасност. Инвестицията включва:- корекция на геометрията на провинциалния път на пресечната точка на ул. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. В резултат на инвестицията през 2017 г. ще бъдат възстановени 2 171,94 м. воеводски път № 194 и водовъртежи и мостова конструкция. (Bulgarian)
    3 November 2022
    0 references
    O projeto está localizado em Wielkopolskie Voivodship, Condado de Pilskie, Wyrzysk. O tema do estudo é a extensão da Estrada Voivodia N.º 194 no comprimento de 2 171,94 m em Wyrzysk. De momento, a estrada n.º 194 na secção de passagem de Wyrzysk está a revelar uma degradação significativa. Na estrada, o trânsito é parado por paradas de Autocarros na estrada. A superfície é caracterizada por más condições técnicas — há deformações, solavancos, fissuras longitudinais e transversais, inúmeros defeitos e remendos. Os pavimentos existentes também se encontram em más condições técnicas. A falta de um sistema de desidratação funcional contribui para a deterioração das condições de segurança rodoviária. O investimento inclui:- correção da geometria da estrada provincial no cruzamento de ul. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. Como resultado do investimento em 2017, 2 171,94 m de voivodship estrada n.º 194 e sarjas e estrutura de pontes serão reconstruídos. (Portuguese)
    3 November 2022
    0 references
    Projekt se nalazi u Wielkopolskie Voivodship, Pilskie županija, Wyrzysk općina. Predmet studije je proširenje vojvodstva ceste br. 194 na duljinu 2 171,94 m u Wyrzysk. U ovom trenutku cesta br. 194 na dijelu prijelaza Wyrzysk pokazuje značajnu degradaciju. Na cesti je promet zaustavljen autobusnim stanicama na cesti. Površinu karakterizira loše tehničko stanje – postoje deformacije, neravnine, uzdužne i poprečne pukotine, brojni nedostaci i zakrpe. Postojeći pločnici su također u lošem tehničkom stanju. Nedostatak funkcionalnog sustava dehidracije pridonosi pogoršanju uvjeta sigurnosti na cestama. Investicija uključuje:- korekciju geometrije pokrajinske ceste na raskrižju ul. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. Kao rezultat ulaganja u 2017., 2 171,94 m voivodship ceste br. 194 i propusta i strukture mostova će biti obnovljena. (Croatian)
    3 November 2022
    0 references
    Projekt se nachází v obci Wielkopolskie Voivodship, okres Pilskie, obec Wyrzysk. Předmětem studie je rozšíření Voivodeship Road č. 194 o délce 2 171,94 m ve Wyrzysku. V současné době silnice č. 194 na přejezdovém úseku Wyrzysku vykazuje výraznou degradaci. Na silnici je doprava zastavena autobusovými zastávkami na silnici. Povrch je charakterizován špatným technickým stavem – existují deformace, hrboly, podélné a příčné trhliny, četné vady a náplasti. Stávající chodníky jsou také ve špatném technickém stavu. Nedostatek funkčního systému dehydratace přispívá ke zhoršení podmínek bezpečnosti silničního provozu. Investice zahrnuje:- korekce geometrie provinční silnice na křižovatce ul. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. V důsledku investice v roce 2017 bude přestavěno 2 171,94 m voivodship silnice č. 194 a propustky a mostní konstrukce. (Czech)
    3 November 2022
    0 references
    WOJ.: WIELKOPOLSKIE, POW.: pilski
    0 references

    Identifiers

    RPWP.05.01.01-30-0011/15
    0 references