installation of photovoltaic installation (Q4419613): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Import item from Poland)
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
Property / contained in NUTS
 
Property / contained in NUTS: Puławski / rank
 
Normal rank

Revision as of 23:24, 27 October 2022

Project Q4419613 in Poland
Language Label Description Also known as
English
installation of photovoltaic installation
Project Q4419613 in Poland

    Statements

    0 references
    68,250.0 zloty
    0 references
    15,171.98 Euro
    0 references
    105,000.0 zloty
    0 references
    23,341.5 Euro
    0 references
    65.0 percent
    0 references
    1 January 2023
    0 references
    31 December 2023
    0 references
    PRALNIA 39 WIOLETTA BIDER
    0 references

    51°39'43.42"N, 22°0'23.29"E
    0 references
    Celem projektu jest wykonanie instalacji fotowoltaicznej na budynku Pralni w miejscowości Niwa Babicka 39 o mocy 34,76 kW. Projekt ma na celu również pozyskanie energii elektrycznej z odnawialnego źródła jakim jest promieniowanie słoneczne. Produkowana przez panele fotowoltaiczne energia wykorzystywana zostanie do zasilenia sieci instalacji obiektów Projekt polega na realizacji zadania polegającego na zakupie oraz uruchomieniu instalacji fotowoltaicznej wraz układem blokady i monitoringiem mocy. Realizacja projektu przyczyni się do osiągnięcia celów: Zwiększenia dodatkowej zdolności wytwarzania energii elektrycznej ze środków odnawialnych, liczby wybudowanych jednostek wytwarzania energii elektrycznej, produkcji energii elektrycznej z nowo wybudowanych instalacji wykorzystujących odnawialne źródła energii, rocznego spadku emisji gazów (Polish)
    0 references
    The aim of the project is to perform a photovoltaic installation on the Laundry building in Niwa Babicka 39 with a power of 34.76 kW. The project also aims to obtain electricity from a renewable source, which is solar radiation. The energy produced by photovoltaic panels will be used to power the network of installations of facilities The project consists of the task of purchasing and launching a photovoltaic installation together with a locking system and power monitoring. The implementation of the project will contribute to achieving the objectives of: Increase the additional capacity to generate electricity from renewable resources, the number of electricity generation units built, the production of electricity from newly built installations using renewable energy sources, the annual decrease in gas emissions (English)
    21 October 2022
    0 references
    WOJ.: LUBELSKIE, POW.: rycki
    0 references
    0 references

    Identifiers

    RPLU.15.01.00-06-0122/22
    0 references