RES in DAKRO Limited Liability Company (Q4419648): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Import item from Poland) |
(Changed an Item: Edited by the materialized bot - inferring region from the coordinates) |
||
Property / contained in NUTS | |||
Property / contained in NUTS: Lubelski / rank | |||
Normal rank |
Revision as of 23:17, 27 October 2022
Project Q4419648 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | RES in DAKRO Limited Liability Company |
Project Q4419648 in Poland |
Statements
93,202.82 zloty
0 references
20,718.99 Euro
0 references
143,388.96 zloty
0 references
31,875.37 Euro
0 references
65.0 percent
0 references
1 January 2023
0 references
31 December 2023
0 references
DAKRO SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
0 references
Projekt zakłada rozbudowę dwóch instalacji fotowoltaicznych o mocy 6,3 kW każda , na dachach budowli, zlokalizowanych w miejscowości Lublin, ul. Nałęczowska 63 i ul. Nałęczowska 65, 20-701 Lublin, województwo lubelskie, powiat Lublin oraz budowę trzech pomp ciepła w budynkach zlokalizowanych w miejscowości Lublin, ul. Nałęczowska 63, moc 12 kW ul. Nałęczowska 65, moc 10 kW i ul. Nałęczowska73, moc 16kW, 20-701 Lublin. Instalacje będą wytwarzały energię elektryczną oraz energię cieplną na potrzeby działalności gospodarczej prowadzonej przez Wnioskodawcę. Nadwyżka energii, która nie zostanie zużyta do działalności będzie odprowadzana do Sieci Dystrybucyjnej (sprzedawana lub odbierana -net metering). Cele projektu to: 1. Zmniejszenie kosztów operacyjnych funkcjonowania zakładu. 2. Produkcja energii z OZE (panele fotowoltaiczne, pompy ciepła). Projekt zakłada zakup kompletnych systemów fotowoltaicznych i grzewczych wraz z montażem. Instalacje fotowoltaiczne będą się składały z modułów fotowoltaicznych, inwerterów, okablowania oraz systemów mocowania. Instalacje grzewcze będą składały się z nagrzewnic i osprzętu. Grupy docelowe to przedsiębiorstwo Wnioskodawcy oraz jego kontrahenci. Wybrane przez Wnioskodawcę do realizacji wskaźniki projektu to: Wskaźniki produktu: Liczba przedsiębiorstw otrzymujących wsparcie (CI1); : Liczba przedsiębiorstw otrzymujących dotacje (CI2); Szacowany roczny spadek emisji gazów cieplarnianych (CI34) [tony równoważnika CO2/rok]; Liczba wybudowanych jednostek wytwarzania energii cieplnej z OZE; Liczba przebudowanych jednostek wytwarzania energii elektrycznej z OZE; : Dodatkowa zdolność wytwarzania energii elektrycznej ze źródeł odnawialnych [MWe]; Dodatkowa zdolność wytwarzania energii cieplnej ze źródeł odnawialnych [MWt]. Wskaźniki rezultatu: Produkcja energii cieplnej z nowo wybudowanych instalacji wykorzystujących OZE [MWht/rok]; Produkcja energii elektrycznej z nowych mocy wytwórczych instalacji wykorzystujących OZE (Polish)
0 references
The project involves the expansion of two 6.3 kW photovoltaic installations each, on the roofs of the buildings, located in Lublin, ul. Nałęczowska 63 and ul. Nałęczowska 65, 20-701 Lublin, Lublin Voivodeship, Lublin District and construction of three heat pumps in buildings located in Lublin, ul. Nałęczowska 63, power 12 kW ul. Nałęczowska 65, power 10 kW and ul. Nałęczowska73, power 16 kW, 20-701 Lublin. The installations will generate electricity and heat for the economic activity carried out by the Applicant. Surplus energy that is not used for activities will be discharged to the Distribution Network (sold or received -net metering). The objectives of the project are: 1. Reduce the operating costs of the plant. 2. Energy production from RES (photovoltaic panels, heat pumps). The project involves the purchase of complete photovoltaic and heating systems together with installation. Photovoltaic installations will consist of photovoltaic modules, inverters, wiring and mounting systems. Heating installations will consist of heaters and accessories. The target groups are the applicant’s company and its counterparts. The project indicators selected by the Applicant for implementation are: Product indicators: Number of enterprises receiving support (CI1); Number of enterprises receiving grants (CI2); Estimated annual decrease in greenhouse gas emissions (CI34) [tonnes of CO2 equivalent/year]; Number of RES heat generation units built; Number of reconstructed RES electricity generation units; Additional capacity to generate electricity from renewable sources [MWe]; Additional capacity to generate heat from renewable sources [MWt]. Result indicators: Heat generation from newly built RES installations [MWht/year]; Production of electricity from new generation capacities of installations using RES (English)
21 October 2022
0 references
The project involves the expansion of two 6.3 kW photovoltaic installations each, on the roofs of the buildings, located in Lublin, ul. Nałęczowska 63 and ul. Nałęczowska 65, 20-701 Lublin, Lublin Voivodeship, Lublin District and construction of three heat pumps in buildings located in Lublin, ul. Nałęczowska 63, power 12 kW ul. Nałęczowska 65, power 10 kW and ul. Nałęczowska73, power 16 kW, 20-701 Lublin. The installations will generate electricity and heat for the economic activity carried out by the Applicant. Surplus energy that is not used for activities will be discharged to the Distribution Network (sold or received -net metering). The objectives of the project are: 1. Reduce the operating costs of the plant. 2. Energy production from RES (photovoltaic panels, heat pumps). The project involves the purchase of complete photovoltaic and heating systems together with installation. Photovoltaic installations will consist of photovoltaic modules, inverters, wiring and mounting systems. Heating installations will consist of heaters and accessories. The target groups are the applicant’s company and its counterparts. The project indicators selected by the Applicant for implementation are: Product indicators: Number of enterprises receiving support (CI1); Number of enterprises receiving grants (CI2); Estimated annual decrease in greenhouse gas emissions (CI34) [tonnes of CO2 equivalent/year]; Number of RES heat generation units built; Number of reconstructed RES electricity generation units; Additional capacity to generate electricity from renewable sources [MWe]; Additional capacity to generate heat from renewable sources [MWt]. Result indicators: Heat generation from newly built RES installations [MWht/year]; Production of electricity from new generation capacities of installations using RES (English)
0 references
WOJ.: LUBELSKIE, POW.: Lublin
0 references
Identifiers
RPLU.15.01.00-06-0213/22
0 references