Thermomodernisation of public buildings in the municipality of Bogoria as an element of increasing energy efficiency in the public sector. (Q4416806): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Import item from Poland)
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
Property / contained in NUTS
 
Property / contained in NUTS: Sandomiersko-jędrzejowski / rank
 
Normal rank

Revision as of 22:59, 27 October 2022

Project Q4416806 in Poland
Language Label Description Also known as
English
Thermomodernisation of public buildings in the municipality of Bogoria as an element of increasing energy efficiency in the public sector.
Project Q4416806 in Poland

    Statements

    0 references
    1,197,240.11 zloty
    0 references
    266,146.48 Euro
    0 references
    1,408,517.78 zloty
    0 references
    313,113.5 Euro
    0 references
    85.0 percent
    0 references
    1 June 2021
    0 references
    31 December 2022
    0 references
    GMINA BOGORIA
    0 references

    50°31'2.10"N, 21°18'22.39"E
    0 references
    Projekt obejm. dział. inwest. w budynkach uż.publ. na terenie gminy Bogoria (woj. świętokrzyskie),poleg. na komplek. termomodernizacji z wykorzystaniem oze.W ramach projektu wykonane zostanie ocieplenie ścian zewn.,wymiana okien i drzwi zewn.oraz modernizacja inst. C.O. Wymianie ulegnie oświetlenie wewn. oraz zainstalowane zostaną panele fotowoltaiczne do prod. en.elektr. Projekt wynika z Planu Gospodarki Nisk. w zakresie ogran. emisji CO2, gazów cieplarnianych czyli ograniczenia szeroko pojętej niskiej emisji. Projekt będzie realizowany w formule „zaprojektuj i wybuduj”. Projekt zakłada montaż wyłącznie nowych, nieużywanych elementów. Celem jest zwiększenie efektywn.i energet.j w sektorze publicznym w Gm. Bogoria przez termomodernizację BUP oraz obniżenie emisji substancji szkodliwych do powietrza dzięki wykorzystaniu OZE i wymianie oświetlenia. Projekt jest zgodny z celami szczeg. 3 osi priorytetowej RPO WŚ 2014-2020, tj. zwiększona efektyw. energetyczna budynków publ. oraz sektora mieszkaniowego, Ograniczona emisja pyłów i subst. szkodliwych do atmosfery. oraz z celem działania 3.3. - ponieważ w wyniku realizacji projektu nastąpi poprawa efekt. energ. z wykorzystaniem odnawialnych źródeł energii w sekt. publicznym. Wskaźniki: 1.Prod: -Pow. użytkowa budynków poddanych termomodernizacji:2782,71 m2 -L.zmodernizowanych energetycznie budynków:7 szt. -L.zmodernizowanych źródeł ciepła:4 szt. -L.wybudowanych jednostek wytwarzania energii elektrycznej z OZE:7 szt. 2.Rezul. -Szac. roczny spadek emisji gazów cieplarnianych:426,73 Tony równoważnika CO2 -Zmniejsz. zużycia energii końcowej w wyniku realizacji projektów:2922,50 GJ/rok -Ilość zaoszcz.energii cieplnej:2632,0 GJ/rok -Ilość zaoszcz.energii elektrycznej:24,79 MWh/rok -Zmniejsz. rocznego zużycia energii pierwotnej w budynkach publicznych:1 560 406,08 kWh/rok Całkowity koszt projektu:1 542 709,56 zł,Dofinan.:1 197 240,11zł, Wkład własny: 345 469,45 zł. Okres realizacji:01.06.2021-31.12.2022 (Polish)
    0 references
    The project will include an investment unit in buildings uż.publ. in the commune of Bogoria (Świetokrzyskie voivodeship),the complex of thermal modernisation with the use of oze.The project will include warming of external walls, replacement of windows and external doors and modernisation of inst. C.O. The interior lighting will be replaced and photovoltaic panels will be installed to prod. en.elektr. The project results from the Low Economy Plan in terms of CO2 emissions, greenhouse gases, i.e. the reduction of broadly understood low emissions. The project will be implemented in the formula “design and build”. The project assumes the installation of only new, unused elements. The aim is to increase the efficiency and energet.j in the public sector in Bogoria by thermomodernising BUP and reducing emissions of harmful substances into the air thanks to the use of RES and replacement of lighting. The project is in line with the objectives of detail. 3 priority axes of ROP WŚ 2014-2020, i.e. increased energy efficiency of publ. buildings and the housing sector, reduced emissions of dust and pollutants into the atmosphere and with the objective of measure 3.3. — because the project will improve the effect of energy using renewable energy sources in the public sect. Indicators: 1.Prod: —Use of buildings subjected to termomodernizacji:2782,71 m² -L. energy-modernised buildings: 7 pcs. —L.modernised heat sources: 4 units —L. built electricity generation units from RES:7 units 2.Rezul. —Estimated annual decrease in gas emissions cieplarnianych:426,73 tons CO2 equivalent -Reduce final energy consumption as a result of implementation projektów:2922,50 GJ/year -Quantity of energy savings elektrycznej:24,79 MWh/year -Reduced annual primary energy consumption in public buildings:1 560 406.08 kWh/year Total cost of the project:1 542 709.56 zł,finance.:1 197 240,11zł, Own contribution: 345 469.45 PLN. Period of realizacji:01.06.2021-31.12.2022 (English)
    21 October 2022
    0 references
    WOJ.: ŚWIĘTOKRZYSKIE, POW.: staszowski
    0 references

    Identifiers

    RPSW.03.03.00-26-0049/20
    0 references