Thermomodernisation of public buildings in the Daleszyce Commune (Q4416878): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Import item from Poland)
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
Property / contained in NUTS
 
Property / contained in NUTS: Kielecki / rank
 
Normal rank

Revision as of 19:58, 27 October 2022

Project Q4416878 in Poland
Language Label Description Also known as
English
Thermomodernisation of public buildings in the Daleszyce Commune
Project Q4416878 in Poland

    Statements

    0 references
    1,502,470.48 zloty
    0 references
    333,999.19 Euro
    0 references
    2,254,200.0 zloty
    0 references
    501,108.66 Euro
    0 references
    66.65 percent
    0 references
    1 February 2021
    0 references
    31 March 2022
    0 references
    GMINA DALESZYCE
    0 references

    50°48'6.73"N, 20°52'54.23"E
    0 references
    Projekt obejmuje działania inwestycyjne w 2 bud. użyt. pub. w miejscowościach Szczecno i Brzechów (gm.Daleszyce, pow.kielecki, woj. Świętokrzyskie), polegające na komplek., głębokiej termomodernizacji z wykorzystaniem OZE. W ramach projektu wykonane zostanie ocieplenie obiektu przez ocieplenie ścian zewnętrznych, stropu, dachu, wymiana okien i drzwi zewnętrznych, a także modernizacja instalacji C.O. i CWU. W obiektach wymianie ulegnie oświetlenie wewn. oraz zainstalowana zostanie instalacja oze – panele fotowoltaiczne do produkcji en. elektr..Dopasowanie metody i technologie wykonania prac są uzależnione od wyniku audytu efekt.i energ. budynku oraz będą wynikać z Planu Gospodarki Niskoemisyjnej w zakresie ograniczenia emisji CO2, gazów cieplarnianych czyli ograniczenia szeroko pojętej niskiej emisji. Projekt będzie realizowany w formule „zaprojektuj i wybuduj”. Celem og.projektu jest zwięk.e efekt.energ.w sektorze publicznym w Gm. Daleszyce przez modernizację i termomodernizację bud. użyt. publicznej oraz obniżenie emisji subs.szkod. do powietrza dzięki wykorzystaniu OZE i wymianie oświetlenia. Projekt jest zgodny z celami szczeg. 6 osi priorytetowej, tj. Zwięk. efektywn.energet. w sektorze użyteczności publicznej na obszarze KOF. wskaźniki: -Pow. użytk. bud. poddanych termomodernizacji [m2]:2149,8 -L. zmodernizowanych źródeł ciepła [szt.]:2 -L. wyb. jednostek wytwarzania energii elektrycznej z OZE [szt.]2 -Szac. roczny spadek emisji gazów cieplarnianych [tony równoważnika CO2]:163,98 -Zmn. rocznego zużycia energii pierwotnej w budynkach publicznych [kWh/rok]:615 146,12 -Zmn. zużycia energii końcowej w wyniku realizacji projektów [GJ/rok]:2701,93 -Il. zaoszczędzonej energii cieplnej [GJ/rok]:1828,23 -Il. zaoszczędzonej energii elektrycznej [GJ/rok]:15,48 Okres realizacji:01.02.2021-31.03.2022 Całk. wartość projektu: 2 437 000,00 zł, Dofinansowanie: 1 502 470,48 zł, wkład własny: 934 529,52 zł. (Polish)
    0 references
    The project includes investment activities in 2 building. pub. in the towns Szczecno and Brzechów (Daleszyce, pow.kielecki, voivodeship) Świętokrzyskie), consisting of complex., deep thermal modernisation with the use of RES. As part of the project, the facility will be warmed by warming external walls, ceiling, roof, replacement of windows and external doors, as well as modernisation of C.O. and CWU installations. Indoor lighting will be replaced and the oze installation will be installed — photovoltaic panels for the production of en. electr..The adaptation of the method and technologies of work execution depends on the result of the audit of the effect and energy of the building and will result from the Low-Emission Economy Plan for the reduction of CO2 emissions, greenhouse gases, i.e. the reduction of broadly understood low emissions. The project will be implemented in the formula “design and build”. The aim of the project is to increase the effect.energ.in the public sector in Gm. Daleszyce through the modernisation and thermomodernisation of the public use building and the reduction of subs. damage emissions to the air thanks to the use of RES and the replacement of lighting. The project is in line with the objectives of detail. 6 priority axes, i.e. Increase effective.energet. in the utilities sector in the area of KOF. indicators: —Use of thermally modernised buildings [m²]:2149,8 -L. of modernised heat sources [pcs.]:2 -L. select of electricity generation units from RES [pcs.]2 -estimated annual decrease in greenhouse gas emissions [tonnes of CO2 equivalent]:163,98 -Mm. annual primary energy consumption in public buildings [kWh/year]:615 146, 12 -Mm. final energy consumption as a result of projects [GJ/year]:2701,93 -Il. of thermal energy saved [GJ/year]:1828,23 -Il. of electricity saved [GJ/year]:15,48 Period realizacji:01.02.2021-31.03.2022 Total project value: 2 437 000,00 PLN, co-financing: PLN 1 502 470.48, own contribution: 934 529.52 PLN. (English)
    21 October 2022
    0 references
    WOJ.: ŚWIĘTOKRZYSKIE, POW.: kielecki
    0 references

    Identifiers

    RPSW.06.01.00-26-0015/16
    0 references