The use of renewable energy sources through the installation of photovoltaic panels on the buildings of the BP Fuel Station in Dębica (Q4422944): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Import item from Poland) |
(Changed an Item: Edited by the materialized bot - inferring region from the coordinates) |
||
Property / contained in NUTS | |||
Property / contained in NUTS: Tarnobrzeski / rank | |||
Normal rank |
Revision as of 17:20, 27 October 2022
Project Q4422944 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | The use of renewable energy sources through the installation of photovoltaic panels on the buildings of the BP Fuel Station in Dębica |
Project Q4422944 in Poland |
Statements
294,907.92 zloty
0 references
65,558.03 Euro
0 references
346,950.5 zloty
0 references
77,127.1 Euro
0 references
85.0 percent
0 references
1 April 2017
0 references
12 March 2023
0 references
FIRMA USŁUGOWO HANDLOWA PETRO-AWA SPÓŁKA Z OGRANICZONA ODPOWIEDZIALNOSCIA
0 references
Przedmiotem projektu jest instalacja paneli fotowoltaicznych na 3 obiektach stacji paliw BP w Dębicy należących do firmy FUH Petro-Awa Sp. z o.o.: Instalacja w obiekcie przy ul. Rzeszowskiej 114 A oraz Instalacje zlokalizowane pod adresem 23 Sierpnia 1, 39-200 Dębica przy dwóch obiektach i wpięte do niezależnych układów pomiarowych. Moc instalacji fotowoltaicznej: • Stacja Paliw BP ul. Rzeszowska 114 A, 39-200 Dębica, – 39,76 kWp (105 szt. w tym: 91 paneli x 380 watt- 14 paneli x 370 watt) • Stacja Paliw BP ul. 23 Sierpnia 1, 39-200 Dębica, – 49,85 kWp (111 szt.) • Stacja Paliw BP ul. 23 Sierpnia 1, 39-200 Dębica, – 49,85 kWp (111 szt.) Zakres prac instalacyjnych obejmuje: 1. w trzech obiektach: wykonanie konstrukcji pod panele PV , montaż paneli fotowoltaicznych o łącznej mocy 139,46 kW. Wykonanie prac pozostałych – uziemienie paneli. 2. w każdym z dwóch obiektów przy ul. 23 Sierpnia 1, instalację: panel 450W (111 szt.), Falownik 50 kW, osprzęt elektryczny (przewody solarne +/- , komplet zabezpieczeń (przewód, bednarka, szpilki). 3. osprzęt w obiekcie przy ul. Rzeszowskiej 114 A: Inwerter o mocy 20 kW, Inwerter o mocy 20 kW, rozdzielnica PV 1000V DC, rozłącznik p-poż projoy, rozdzielnica AC 400V, 3 fazowa. Celem jest zwiększenie wytwarzania energii z odnawialnych źródeł w generacji rozproszonej i poprawa jakości powietrza. Dodatkowe cele: - zmniejszenie emisji gazów cieplarnianych - zmniejszenie kosztów zużycia energii w firmie FUH Petro-Awa Sp. z o.o. na terenie Dębicy Długookresowym (nadrzędnym) celem będzie uniknięcie emisji zanieczyszczeń w postaci pyłów i tlenków przez cały okres funkcjonowania instalacji. Jako, że dwutlenek węgla jest najgroźniejszym gazem cieplarnianych, wywołujący zjawisko efektu cieplarnianego na ziemi. (Polish)
0 references
The subject of the project is the installation of photovoltaic panels on 3 BP petrol stations in Dębica owned by FUH Petro-Awa Sp. z o.o.: Installation in the building at ul. Rzeszowska 114 A and Installations located at 23 August 1, 39-200 Dębica at two objects and plugged into independent measuring systems. Power of photovoltaic installation: • Fuel station BP ul. Rzeszowska 114 A, 39-200 Dębica, — 39.76 kWp (105 units of which: 91 panels x 380 watt- 14 panels x 370 watt) • Fuel Station BP ul. 23 August 1, 39-200 Dębica, — 49.85 kWp (111 pcs.) • Fuel Station BP ul. 23 August 1, 39-200 Dębica, — 49.85 kWp (111 pcs.) The scope of installation works includes: 1. in three objects: construction for PV panels, installation of photovoltaic panels with a total power of 139.46 kW. Execution of other works — grounding of panels. 2. in each of the two buildings at ul. 23 August 1, installation: panel 450W (111 pcs), Inverter 50 kW, electrical equipment (solar conductors ±, security set (wire, collar, pins). 3. equipment in the building at ul. Rzeszów 114 A: 20 kW inverter, 20 kW inverter, PV 1000V DC switchgear, p-fire projoy switchgear, AC 400V switchgear, 3 phase switchgear. The aim is to increase the generation of energy from renewable sources in distributed generation and improve air quality. Additional objectives: — reduction of greenhouse gas emissions — reduction of energy consumption costs at FUH Petro-Awa Sp. z o.o. in Dębica Long-term (overriding) aim to avoid emissions of pollutants in the form of particulate matter and oxides throughout the lifetime of the installation. As carbon dioxide is the most dangerous greenhouse gas, causing the greenhouse effect on earth. (English)
0 references
WOJ.: PODKARPACKIE, POW.: dębicki
0 references
Identifiers
RPPK.11.02.00-18-0022/22
0 references