Construction, expansion and modernisation of units producing electricity and heat from RES in public utility buildings, including the necessary connection infrastructure to distribution networks in the municipality of Sławno (Q137708): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Import item from Poland)
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
Property / contained in NUTS
 
Property / contained in NUTS: Koszaliński / rank
 
Normal rank

Revision as of 13:49, 27 October 2022

Project Q137708 in Poland
Language Label Description Also known as
English
Construction, expansion and modernisation of units producing electricity and heat from RES in public utility buildings, including the necessary connection infrastructure to distribution networks in the municipality of Sławno
Project Q137708 in Poland

    Statements

    0 references
    2,467,229.21 zloty
    0 references
    548,465.05 Euro
    13 January 2020
    0 references
    2,902,622.65 zloty
    0 references
    645,253.02 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    21 December 2015
    0 references
    31 December 2022
    0 references
    GMINA SŁAWNO
    0 references
    0 references

    54°22'48.32"N, 16°34'57.50"E
    0 references
    Przedmiotem projektu jest kompleksowa realizacja zadania,która obejmie swoimi działaniami następujące elementy: - SP w Żukowie–instalacja fotowoltaiczna o mocy 10kWp i pompa ciepła (kolektor pionowy 21 otworówx100 m wraz z centralą cieplną o mocy 2x52kW) -Zespół Szkół we Wrześnicy-instalacja fotowoltaiczna o mocy 3kWp i przebudowa kotłowni tradycyjnej na kotłownię na pellet -Szkoła Podstawowa w Warszkowie-instalacja fotowoltaiczna o mocy 3,12 kWp i pompa ciepła (kolektor pionowy 14 otworówx100 m plus centrala cieplna o mocy 55,83kW i 21,5kW) - Przedszkole w Gwiazdowie–instalacja fotowoltaiczna o mocy 4,0kWp i pompa ciepła (kolektor pionowy 10 otworówx100 m plus centrala cieplna o mocy 43,4 kW) -Świetlica w Brześciu–instalacja fotowoltaiczna o mocy 2kWp i instalacja kotła na biomasę 25-30 kW z oprzyrządowaniem Świetlica w Wrześnicy–instalacja fotowoltaiczna o mocy 2kWp i instalacja kotła na biomasę 45-50 kW z oprzyrządowaniem Świetlica w Starym Krakowie - instalacja fotowoltaiczna o mocy 2kWp i instalacja kotła na biomasę 25 kW z oprzyrządowaniem -Świetlica w Warszkówku-instalacja fotowoltaiczna o mocy 2kWp -Zespół Szkół w Sławsku-instalacja fotowoltaiczna o mocy 10kWp -Świetlica w Warszkowie-instalacja fotowoltaiczna o mocy 3kWp Planowane do wybudowania instalacje fotowoltaiczne stanowić będą zespół prądotwórczy,klasyfikowany jako mikroźródło (do 40 kW),wykorzystujące energię odnawialną.Instalacja wytwarzać będzie energię elektryczną na potrzeby własne budynków.Nie przewiduje się magazynowana energii w akumulatorach ani dalszej odsprzedaży.W ramach inwestycji przewiduje się wykonanie inwestycji w etapach, aby zbytnio nie obciążyć budżetu.Dlatego też przeprowadzone zostaną 3 przetargi (jeden na SP w Żukowie jest już rozstrzygnięty).Projekt będzie miał charakter stacjonarny.Efektem będzie liczba jednostek wytwarzania energii elektrycznej z OZE-10szt a energii cieplnej z OZE–6szt.Jeden obiekt na potrzeby energii cieplnej z OZE zostanie (Polish)
    0 references
    The subject of the project is the comprehensive implementation of the task, which will include the following elements: X-55 x x x x x x x x x x x x 83 x x x 21 x x 5 x 4 x 4 x 4 x 0 x 10 x-100 x 10 x-100 x x 83 x x 4 x x 4 x x 4 x 0 x x 10 x 100 x x 10 x x 100 x x x 10 x x 100 x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x 55 x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x 83 x x x x x x x x x x x x x x 55 x x x x x x x x x x x x x 83 x x x x x x x x 55 x x x x x x x x x x x x x 83 x x x x x 21 x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x 83 x x x x x x x x x x x x x x x x x dx21 x x x x x x x x x x x x d d dc x 2 x 45 x 45 x 50 x 83 x x dx21xxxxxxxxxxxxx5x21x5x4xxx0x10-100 x x x x 83rd of the x-100 x x x 50 x x x 83 x x x x x x x x x x x x x x x x x-83 x x x x x x x x x-83 x x x x x x x x x x x-21-5 x x x x x x x 4 x x x x x 4 x x x x x 4 x x x x x x x 4 x x x x 0 x x 10 x x-100 x x x 10 x x 10 x 100 x x x x x 30 x 2 x 45 x 50 x x x 45 x 2 x 45 x 50 x 50 x 50xxxxxxx83 x-55xxxxx83-83xxxxx21xxxxxx5x4 x x x x x 4 x x x 4 x x x x 4 x x x x 4 x x x 4 x x x 4 x x x 4 x x x x 4 x x 4 x x x x 4 x x 4 x x 4 x x 4 x 0 x x 10 x x 10 x x x 100 x 10 x x 100 x x x 10 x x 100 x x 10 x 100 x 10th x x 10 x x 100 x 10 x x 100 x x x x x 10th x 10x100xx43xxx4xxx0xx10x100 x 10xxx100xx43xxxmm) x-43xxxxxxxxx4xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx0xxxxxxx10th of the xx100th of the x-100xxxx83rd of the x-83rd of the xxxt-55th of the x-83rd of the x-83rd of the x-55th of the x-83rd of the x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x 55 x x x x x x x x x x x x x x x x x x x x x x 55 x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x 83 x x x 21 x x x 5 x x x 4 x x 4 x x x 4 x 4 x 0 x x 10th of x-100 x x 10 x 10x100 x x x 10th of x-100 x x x x 10th of the x-100th of x 10th of the x-100th of the x-100th of the power of the x-43x4 x 4 x 4 x 0 x 10 x 100 x 10 x 100 x 43 x x 4 x x 4 x x 4 x x 4 x 4 x 4 x 0 x x x 10 x 10 x x 100 x x x 10 x x 100 x x x 10 x x x100x43 x x x x4x0x10 x x x-100 x x 10th of the x-100th of the x-100x43 x x x x x 4 x x x x x x 4 x x 4 x x 4 x x 4 x 0 x x 10th of the x-100th of the x-100th of the x-83rd of the x-83rd of the x-55th of the x-83rd of the x-83rd of the x-21st of the xx5th of the xx0th of the xx100th of the xx100 x x x x x x 83rd of x xxxxxxxxx-83 x x x x x x x x x x x x x x 55 x x x 83 x x x 55 x x x 83 x x x 55 x x x 83 x x x 55 x x x 83 x x x x x 55 x x x 83 x x 83 x x x 55 x x 83 x x x 55 x x 83 x x x 55 x 83 x x x 83 x x x x 55 x x 83 x x x x x 4x4x4x0xxxxx10xxx100x10xxx100xxx100xxxxx43xxxxxxxx4xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx4xxxxxxxxxxxxxx4xxx0xxxxxxx100xxxxxxxxxxxxx-83xxxxxxxxxxxxxxxxxxxxxxxxxxxxx21xxxxxxxxxxxxxxxxxxxxxxxxxxxxx21xxxxxxxxxxxx5xxxxxx4xxxxxxxxxxxxx4-4x0xx-10th-100th-100th-10th-100 x x x x x-100xxxx-83xxxxxxxxxx (English)
    21 October 2020
    0 references
    Le projet a pour objet une mise en œuvre complète de la tâche, qui couvrira les éléments suivants: — L’installation de l’énergie solaire et de la pompe à chaleur (percepteur vertical 21 trousx100 m avec 2x52 kW unité de contrôle thermique) -School in Wrześnica — 3kWp installation photovoltaïque et conversion de la salle traditionnelle de la chaudière en salle de chaudière à granulés -L’installation de base à Varsovie-3 kp l’installation photovoltaïque, 12 kWp et la pompe à chaleur (percepteur vertical 14 trousx100 m plus l’échange de chaleur avec 55,83 kW et 21,5 kW). (French)
    2 December 2021
    0 references
    Gegenstand des Projekts ist eine umfassende Umsetzung der Aufgabe, die folgende Aspekte abdeckt: — SP in Żuków – 10kWp Photovoltaikanlage und Wärmepumpe (vertikaler Kollektor 21 Löcherx100 m mit 2x52 kW thermischer Steuerung) -School in Wrześnica – 3kWp Photovoltaikanlage und Umwandlung des traditionellen Kesselraums in Pellet-Kesselraum -Grundschule in Warschau-3kp Photovoltaik-Installation und Wärmepumpe (vertikaler Kollektor 10 Lochx100 m plus 43,4 kW Wärmesteuereinheit) -Light in der Brek in der Brek-Anlage. (German)
    13 December 2021
    0 references
    Het project heeft betrekking op een uitgebreide uitvoering van de taak, die de volgende elementen omvat: — De capaciteit van de installatie van de openbare installatie — 10 kWp fotovoltaïsche installatie en warmtepomp (verticaal verzamelaar 21 holesx100 m met 2x52 kW thermische controle-eenheid) -School in Wrześnica — 3kWp fotovoltaïsche installatie en omzetting van de traditionele ketelruimte naar pellet ketelruimte — Basisschool in Warschau-3kp fotovoltaïsche installatie en warmtepomp (vertical collector 10 holesx100 m plus warmte uitwisseling met 55,83 kW en 21,5 kW) — Preschool in Star — 4,0kWp fotovoltaïsche installatie — warmtepomp (verticaal verzamelaar 10 holesx100 m plus warmtewisselaar met 55,83 kW en 21,5 kW) (Dutch)
    17 December 2021
    0 references
    L'oggetto del progetto è un'attuazione globale del compito, che comprenderà i seguenti elementi: L'impianto di produzione di impianti fotovoltaici e la pompa di calore (collettore verticale 21 forix100 m con unità di controllo termico 2x52 kW) -Scuola a Wrześnica — 3kWp installazione fotovoltaica e conversione della sala caldaia tradizionale in sala caldaia a pellet -Scuola di base a Varsavia-3 kp impianto fotovoltaico, impianto termico 12 kW e pompa di calore (collettore verticale 14 forix100 m più scambio termico con 55,83 kW e 21,5 kW) — Impianto di produzione di energia elettrica da 25 kW a impianto di produzione di energia elettrica da 3 kW per impianti fotovoltaici e pompe termoelettriche (collettore verticale 10 x 100 m più 43,4 kW di controllo termico) -L'impianto con impianto di produzione di energia elettrica da 25 kW e da impianto di produzione di energia elettrica da 3 kWP per impianti fotovoltaici e pompe termiche (collettore verticale 10x100 m più impianto termico da 55,83 kW e da 21,5 kW per impianti di produzione di energia elettrica da 25 kW a partire da un impianto di produzione di energia elettrica da 3 kW a produzione e da pompa di calore (collettore verticale 10 x 100 m più 43,4 kW di controllo termico) — con impianto di produzione di energia da 25 kW a partire da un impianto di produzione di energia elettrica da 3 kw per la produzione di impianti fotovoltaici e pompe di calore (collettore verticale 10 x 100 m più unità di controllo termico di 43 kW) — Impianto a vuoto con impianto di produzione di energia elettrica da 25 kW, da un impianto di produzione di energia elettrica da 3kw da produzione e da una pompa di calore (collettore verticale 10 fori x 100 m più unità di controllo termico di 43 kW) -L'impianto da impianto da produzione di energia elettrica da — 30 kW e da impianto da impianto da produzione di energia elettrica da 5 kW, da impianto da impianto fotovoltaico da 3kWp, da impianto termoelettrico interno da 10 kWp e da impianto termoelettrico da impianto termoelettrico da impianto termoelettrico da impianto termoelettrico da impianto termoelettrico. -L'impianto termoelettrico da produzione di energia elettrica da 5 kW e da impianto di produzione di energia elettrica da 3 kw. da produzione di energia elettrica da 3 kw.d.i.i.i.i. di produzione e pompa di calore (collettore verticale 14 x 100 m + 43,4 kW da impianto termico) -L'impianto di produzione di energia elettrica da 5 kW — da 2 a 50 KW per la produzione di energia elettrica da 3 kw in produzione di calore e di pompa termica (collet.verticale 100 m + 43,4 kW impianto termico) -L'impianto da riutilizzare a impianto termoelettrico. (Italian)
    15 January 2022
    0 references
    El objeto del proyecto es una ejecución integral de la tarea, que abarcará los siguientes elementos: — La instalación de la instalación de la energía en la instalación de la energía de 36 kW, la instalación de la fotovoltaica y la conversión de la instalación fotovoltaica de 14 agujeros de la instalación fotovoltaica de Wrześnica y la conversión de la sala de calderas tradicional a la sala de calderas de pellets -escuela básica en Varsovia — la instalación fotovoltaica de 12 kW y la bomba de calor (el colector vertical de 14 agujeros de la instalación de la fotoruta de la instalación, la instalación de la instalación fotovoltaica de 25,83 kW y la instalación de 2 kW con un pozo de potencia y una bomba de calor son de la instalación de la instalación de la fotoruta y de la bomba de calor, de la instalación de la instalación de la instalación vertical y de la unidad de temperatura, de la instalación de la instalación de la unidad de temperatura y de la instalación de la unidad de energía. (Spanish)
    19 January 2022
    0 references
    WOJ.: ZACHODNIOPOMORSKIE, POW.: sławieński
    0 references

    Identifiers

    RPZP.02.10.00-32-A094/16
    0 references