Energy modernisation of the building of the Rzezawa Municipal Office (Q4421201): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Import item from Poland)
(‎Changed an Item: Import item from Poland)
Property / coordinate location
 
49°57'37.48"N, 20°25'53.98"E
Latitude49.9604079
Longitude20.431657842691
Precision1.0E-5
Globehttp://www.wikidata.org/entity/Q2
Property / coordinate location: 49°57'37.48"N, 20°25'53.98"E / rank
 
Normal rank
Property / coordinate location: 49°57'37.48"N, 20°25'53.98"E / qualifier
 
Property / contained in NUTS
 
Property / contained in NUTS: Kraków County / rank
 
Normal rank

Revision as of 03:48, 26 October 2022

Project Q4421201 in Poland
Language Label Description Also known as
English
Energy modernisation of the building of the Rzezawa Municipal Office
Project Q4421201 in Poland

    Statements

    0 references
    199,283.08 zloty
    0 references
    44,300.63 Euro
    0 references
    332,138.47 zloty
    0 references
    73,834.38 Euro
    0 references
    60.0 percent
    0 references
    1 July 2020
    0 references
    31 August 2021
    0 references
    GMINA RZEZAWA
    0 references

    49°57'37.48"N, 20°25'53.98"E
    0 references
    Przedmiotem projektu jest modernizacja energet. budynku Urzędu Gminy w Rzezawie. Obiekt jest zlokalizowany w woj, małopol, pow. bocheński, gm Rzezawa.Dotych.opracowano audyt ener., dok. tech. Roboty budow. nie zostały rozpoczęte. Inwestycja jest przygotow. do realizacji. Projekt stanowi samodzielną jednostkę i obejmuje wszystkie zadania inwest niezbędne do zapewnienia funkcjonal. i operacyjności infrastr.zaraz po zakończeniu zadania. Dla uruchomienia produktów projektu nie jest wymagana realizacja dodat. zadań inwest. nieuwzględ. w zakresie rzeczowym. Projekt obejmuje 1 zadanie: Modernizację energetyczną budynku Urzędu Gminy w Rzezawie. Przyjęte w ramach projektu rozwiązania tech.wynikające z audytu ener. wskazano jako koszty kwalifikow.projektu ,tj.: docieplenie ścian zewn., docieplenie stropodachu, docieplenie gzymsu, docieplenie ościeży okiennych i drzwiowych, wymiana stolarki drzwiowej, wymiana stolarki okiennej na PCV, wymiana kotła gazowego,montaż liczników ciepła i sterowania pogodowego, montaż termostatów i zaworów podpionowych oraz perlatorów, wymiana oświetlenia na ledowe. Po wykonaniu audytu okazało się, że projekt pozwoli uzyskać oszczędności energii: cieplnej 431 GJ/rok, tj. 71,24%; zmniejszenie rocznego zużycia energii pierwotnej w budynku 529 GJ/rok, tj. 65,80%; zmniejszenie rocznego zużycia energii końcowej: 481 GJ/rok tj. 65,60%, ilość zoszczędzonej energii elektr. -14MWh/rok, tj. 39,68% Projekt pozwoli zredukować emisję gazów cieplarnianych: szacowany roczny spadek emisji PM10 0,216 kgPM10/rok tj. 71,29% oraz PM2,5 wyniesie 0,216 kgPM2.5/rok tj. 71,29%, szacowany spadek emisji gazów cieplarnianych CO2: 34,782 tonco2/rok tj.57,24%. Pozostałe prace takie jak wykazano jako koszty niekwalifi. projektu: montaż napisów i zegara na elewacji,wymiana pokrycia dachowego, obróbki blacharskie, remont schodów, wymiana daszku drewnianego na wejściem, rusztowania, roboty porządkowe, instalacja odgromowa, (Polish)
    0 references
    The subject of the project is the modernisation of the energy building of the Municipal Office in Rzezawo. The facility is located in the voivodeship, Małopolska, Bocheński area, Rzezawa.Dotych.Audit ener., doc. tech. Construction works have not been started. The investment is ready to be realised. The project is a stand-alone entity and covers all investment tasks necessary to ensure the functional and operationality of the infrastructure as soon as the task is completed. For the launch of the project’s products, the implementation of the additional investment tasks is not required. not taking into account the material scope. The project includes 1 task: Energy modernisation of the building of the Municipal Office in Rzezawo. The solutions adopted in the framework of the project, resulting from the ener audit, were identified as qualification costs of the project, i.e.: insulation of external walls, insulation of rooftops, insulation of cornice, insulation of window and door frames, replacement of door joinery, replacement of window joinery on PVC, replacement of gas boiler, installation of heat and weather control meters, installation of thermostats and support valves and splinters, replacement of lighting with led. After the audit, it turned out that the project will achieve energy savings: thermal 431 GJ/year, i.e. 71.24 %; reduction of annual primary energy consumption in the building 529 GJ/year, i.e. 65.80 %; reduction of annual final energy consumption: 481 GJ/year i.e. 65.60 %, the amount of energy saved electr. —14 MWh/year, i.e. 39.68 % The project will reduce greenhouse gas emissions: estimated annual decrease in PM10 emissions 0.216 kgPM10/year i.e. 71.29 % and PM2.5 will be 0.216 kgPM2.5/year i.e. 71.29 %, estimated decrease in CO2 GHG emissions: 34,782 tonco2/year i.e. 57.24 %. Other works, as shown as non-qualified costs of the project: installation of inscriptions and clock on the facade,replacement of roofing, metalworking, renovation of stairs, replacement of wooden visor on the entrance, scaffolding, cleaning works, lightning protection system, (English)
    21 October 2022
    0 references
    WOJ.: MAŁOPOLSKIE, POW.: bocheński
    0 references

    Identifiers

    RPMP.04.03.02-12-0003/20
    0 references