Improving the accessibility of the A4 Gogolin and Olszów motorway junctions. Extension of the provincial road No. 409 from km 40+ 078-41+ 260.20 on the section Rożniątów — Strzelce Opolskie — task A (Q4429068): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in en, and other parts: Adding translation) |
(Changed an Item: Import item from Poland) |
||
Property / intervention field | |||
Property / intervention field: Other reconstructed or improved road (motorway, national, regional or local) / rank | |||
Normal rank |
Revision as of 15:22, 24 October 2022
Project Q4429068 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Improving the accessibility of the A4 Gogolin and Olszów motorway junctions. Extension of the provincial road No. 409 from km 40+ 078-41+ 260.20 on the section Rożniątów — Strzelce Opolskie — task A |
Project Q4429068 in Poland |
Statements
1,499,554.36 zloty
0 references
333,350.93 Euro
0 references
6,181,180.46 zloty
0 references
1,374,076.42 Euro
0 references
24.26 percent
0 references
1 June 2021
0 references
30 June 2023
0 references
WOJEWÓDZTWO OPOLSKIE
0 references
Realizacja inwestycji obejmuje rozbudowę drogi wojewódzkiej nr 409 ul. Gogolińska w Strzelcach Opolskich na odcinku długości ok 1,18 km, tj. od km 40+078 do km 41+260,20. Celem inwestycji jest rozbudowa drogi do parametrów G wraz z poprawą bezpieczeństwa jej użytkowników oraz zapewnieniem właściwej nośności i trwałości konstrukcji jezdni drogowej. Przebudowa obejmuje również przebud.i bud.ścieżki pieszo-rowerowej oraz chodników, przebud. skrzyżowań z drogami podporządkowanymi, przebudowę zjazdów publicznych, indywidualnych oraz rolnych, kompleksową przebud.i bud. kanalizacji deszcz.i sanitarnej. Odwodnienie zapewnią projektowane spadki podłużne i poprzeczne. Planuje się wykonać: -rozbiórkę istn.nawierzchni jezdni, -bud. nowej konstrukcji jezdni o szerokości ok. 7,0 m, -przebud.ścieżki pieszo-rowerowej oraz jej bud. do zjazdu na parking przycmentarny, -przebud. chodników, -bud. poboczy grunt. o szer.1,25 m -przebud. skrzyż. z dr.podporządk. -bud. zjazdów publ. i indywid. oraz zjazdów na pola, -bud. pasów lewoskrętu -przebud. i bud. kanalizacji deszczowej i sanitarnej -przebud. istn. kabli energetycznych i telefonicznych -bud. elementów bezp. ruchu drogowego (szczegółowy opis w pkt.5.1) -odmulenie istn.rowów oraz budowę nowych - bud. zbiornika retencyjno - chłonnego -wycinkę kolidujących drzew. Celem planowanej inwestycji jest poprawa bezp. ruchu drog. Roboty branżowe wykonywane będą przy obsłudze nadzorów branż. zewn. Produktem projektu będzie poprawa bezp.uczestników ruchu drogowego, długość przebud. drogi woj.na odc. ok. 1,18km. oraz liczba projektów w zakresie popr. bezpieczeństwa uczestników ruchu drog.-szt.1. Projekt obejmuje wykonanie oznakowania poziomego i pionowego, w tym tablic informacyjnych i pamiątkowych. Inwestycja zawiera elem.infr. drog. zmniejszającej presję na środowisko naturalne: bud.kanalizacji deszczowej, osadniki, zbiornik chłonno-retencyjny. Szczegółowy opis działań planowanych do realizacji ujęto w pkt. 5.1 niniejszego wniosku. (Polish)
0 references
The implementation of the investment includes the extension of the provincial road No. 409 ul. Gogolińska in Strzelce Opolskie on the section of about 1.18 km, i.e. from km 40+ 078 to km 41+ 260.20. The aim of the investment is to expand the road to the G parameters together with improving the safety of its users and ensuring the proper load capacity and durability of the roadway structure. Reconstruction also includes reconstruction and construction of pedestrian-bike paths and pavements, reconstruction of intersections with subordinate roads, reconstruction of public, individual and agricultural exits, comprehensive reconstruction and construction of rainwater and sanitary sanitation. Dehydration will ensure the planned longitudinal and lateral declines. It is planned to perform: —disassembly istn.surface of the roadway, -construction of a new road structure with a width of approx. 7.0 m, -reconstruction. walking-bike path and its construction to the exit to the basement parking lot, -reconstruction. pavements, -construction of the roadside. —construction of publ. and individual exits and exits to the fields, -construction of left-turn lanes -reconstruction and construction of rainwater and sanitary sewerage -reconstruction of energy and telephone cables -construction of elements without traffic (detailed description in point.5.1) -multiplification of istn.rows and construction of new — construction of retention and absorbent reservoir -cutting of colliding trees. The aim of the planned investment is to improve traffic-free traffic. Industrial robots will be performed in the service of supervision of industries. external. The product of the project will be the improvement of traffic free persons, the length of the reconstruction of the road voivodeship of approx. 1.18 km and number of road-passenger safety amending projects.1. The project involves the execution of horizontal and vertical markings, including information boards and commemorative boards. The investment includes elem.infr. road. reducing environmental pressure: construction of rainwater sewerage, settlers, reservoir absorbent. A detailed description of the actions to be implemented is included in point. 5.1 of this proposal. (English)
0 references
WOJ.: OPOLSKIE, POW.: strzelecki
0 references
Identifiers
RPOP.06.01.00-16-0007/20
0 references