INCREASING THE PRODUCTION OF ENERGY FROM RENEWABLE SOURCES IN THE COMMUNE OF NOWOSOLNA — STAGE II (Q4416490): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en, and other parts)
(‎Changed an Item: Import item from Poland)
Property / intervention field
 
Property / intervention field: Renewable energy: solar / rank
 
Normal rank

Revision as of 14:55, 24 October 2022

Project Q4416490 in Poland
Language Label Description Also known as
English
INCREASING THE PRODUCTION OF ENERGY FROM RENEWABLE SOURCES IN THE COMMUNE OF NOWOSOLNA — STAGE II
Project Q4416490 in Poland

    Statements

    0 references
    1,236,325.0 zloty
    0 references
    274,835.05 Euro
    0 references
    1,454,500.0 zloty
    0 references
    323,335.35 Euro
    0 references
    85.0 percent
    0 references
    1 June 2021
    0 references
    30 June 2023
    0 references
    GMINA NOWOSOLNA
    0 references
    Celem głównym proj.pn. „Zwiększenie produkcji energii ze źródeł odnawialnych na terenie gminy Nowosolna – Etap II” jest: zwiększenie produkcji energii ze źródeł odnawialnych i zmniejszenie wykorzystania konwencjonalnych źródeł energii w gminie Nowosolna, skutkujące poprawą stanu środowiska naturalnego. Grupą docelową są właściciele posesji, na terenie których zainstalowano infrastrukturę OZE- łącznie 267 osób oraz pośrednio wszyscy mieszkańcy gminy i woj. łódzkiego. Realizacja projektu obejmuje zadania: 1. Przygotowanie projektu: 1.1 Opracowanie dokumentacji aplikacyjnej - studium wykonalności, PFU. 1.2 Opracowanie dokumentacji technicznej – dok. techniczna w formule zaprojektuj wybuduj. 2. Roboty montażowo-instalacyjne: zakup i montaż instalacji OZE. 3. Koszty pośrednie: 3.1 zarządzanie projektem-zarządzanie projektem, nadzór inwestorski. 3.2 promocja projektu –tablica informacyjno-pamiątkowa, plakaty, naklejki. Łączna moc zastosowanych urządzeń: 0,376 MWe. Zastosowane w projekcie kotły na biomasę będą miały łączna moc: 0,020 MW. Zmniejszenie emisji gazów cieplarnianych (efekt ekologiczny) w projekcie: 276,90 tony/równoważnika ekwiwalentu CO2. Planowane wydatki kwalifikowalne na 1 MW mocy zainstalowanej 3 554 496,58 zł Planowane wydatki kwalifikowalne na wyprodukowanie 1 MWh energii 3 474,13 Efekt ekologiczny obliczany jako redukcja emisji gazu CO2 dla przedsięwzięcia: 80,16 %. Efekt ekologiczny obliczany jako redukcja emisji pyłu zawieszonego całkowitego (TSP) dla przedsięwzięcia: 99,85 %. Efekt ekologiczny – planowana redukcja NOx: 98,41 % Okres realizacji projektu II 2021-II 2023. Wartość finansowa projektu wynosi 1 585 065,00 zł. W ramach środków własnych w budżecie Wnioskodawcy została zabezpieczona kwota 218 175,00 zł, stanowiąca 15% kosztów kwalifikowalnych, oraz kwota 130 565,00 zł pokrywająca koszty niekwalifikowalne projektu (w tym vat). Pozostała kwota wydatków, wynosząca 1 236 325,00 zł 85% kosztów kwalifikowanych. (Polish)
    0 references
    The main objective of the project. “Increasing the production of energy from renewable sources in the commune of Nowosolna — Stage II” is: increasing the production of energy from renewable sources and reducing the use of conventional energy sources in the municipality of Nowosolna, resulting in the improvement of the natural environment. The target group is the owners of properties on the territory of which the RES infrastructure was installed — a total of 267 people and indirectly all residents of the municipality and the Łódzkie Voivodeship. The implementation of the project includes the following tasks: 1. Preparation of the project: 1.1 Development of application documentation — feasibility study, PFU. 1.2 Development of technical documentation — doc. technical in the formula design build. 2. Installation and assembly works: purchase and installation of RES installations. 3. Indirect costs: 3.1 Project management-project management, investor supervision. 3.2 promotion of the project — information and memorial board, posters, stickers. Total power of the equipment used: 0.376 MWe. The biomass boilers used in the project will have a total power: 0.020 MW. Reduction of greenhouse gas emissions (environmental effect) in the project: 276.90 tonnes/equivalent of CO2 equivalent. Planned eligible expenditure for 1 MW of installed capacity 3 554 496.58 PLN Planned eligible expenditure for the production of 1 MWh of energy 3 474.13 Environmental effect calculated as reduction of CO2 gas emissions for the project: 80.16 %. Ecological effect calculated as reduction of total particulate matter (TSP) emissions for the project: 99.85 %. Ecological effect — planned NOx reduction: 98.41 % Implementation period II 2021-II 2023. The financial value of the project is PLN 1,585,065.00. Within the own resources of the applicant’s budget, the amount of PLN 218 175,00 was secured, representing 15 % of the eligible costs, and PLN 130 555.00 covering the ineligible costs of the project (including vat). The remaining amount of expenditure, amounting to PLN 1,236 325,00 85 % of eligible costs. (English)
    21 October 2022
    0 references
    WOJ.: ŁÓDZKIE, POW.: łódzki wschodni
    0 references

    Identifiers

    RPLD.04.01.01-10-0004/21
    0 references