Transfer Center in Nysa – redevelopment of streets: Railway, Wrocławska, Rynek, Customs along with intelligent transport system and purchase of low-carbon rolling stock. (Q114847): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: co-financing rate (P837): 61.2 percentage)
(‎Changed an Item: Import item from Poland)
Property / EU contributionProperty / EU contribution
4,872,863.97 Euro
Amount4,872,863.97 Euro
UnitEuro
4,513,490.25 Euro
Amount4,513,490.25 Euro
UnitEuro
Property / budgetProperty / budget
33,175,109.52 zloty
Amount33,175,109.52 zloty
Unitzloty
33,265,274.18 zloty
Amount33,265,274.18 zloty
Unitzloty
Property / budgetProperty / budget
7,962,026.28 Euro
Amount7,962,026.28 Euro
UnitEuro
7,394,870.45 Euro
Amount7,394,870.45 Euro
UnitEuro
Property / location (string)
 
WOJ.: OPOLSKIE, POW.: nyski
Property / location (string): WOJ.: OPOLSKIE, POW.: nyski / rank
 
Normal rank
Property / priority axis
 
Property / priority axis: LOW-CARBON ECONOMY / rank
 
Normal rank
Property / co-financing rate
 
61.04 percent
Amount61.04 percent
Unitpercent
Property / co-financing rate: 61.04 percent / rank
 
Normal rank

Revision as of 19:15, 23 October 2022

Project Q114847 in Poland
Language Label Description Also known as
English
Transfer Center in Nysa – redevelopment of streets: Railway, Wrocławska, Rynek, Customs along with intelligent transport system and purchase of low-carbon rolling stock.
Project Q114847 in Poland

    Statements

    0 references
    20,303,599.87 zloty
    0 references
    4,513,490.25 Euro
    13 January 2020
    0 references
    33,265,274.18 zloty
    0 references
    7,394,870.45 Euro
    13 January 2020
    0 references
    61.04 percent
    0 references
    24 December 2018
    0 references
    30 January 2021
    0 references
    GMINA NYSA
    0 references
    0 references
    Projekt dot. przebudowy ulic: Kolejowa, Wrocławska, Rynek, Celna wraz z inteligentnym systemem transportu i zakupem taboru niskoemisyjnego.W wyniku inwestycji powstanie węzeł przesiadkowy integrujący występujące w Nysie gałęzie transportu.Projekt posiada zintegrowany i kompleksowy charakter.W ramach przebudowy ww. ulic zostanie ograniczony indywid. transport samochodowy w centrum Nysy a przyjęte rozwiązania z zakresu organizacji ruchu ułatwią poruszanie się pojazdów kom. zbiorowej.Zamontowany zostanie Inteligentny System Zarządzania Ruchem oraz infrastr. służąca obsłudze pasażerów zapewniająca m.in. interaktywną informację pasażerską.Dodatkowo mając na względzie zachęcenie mieszkańców i przyjezdnych do korzystania z transportu publ., zostaną zakupione 2 autobusy elektr. (wraz z 2 ładowarkami zajezdniowymi),które będą obsługiwać nową bezpłatną linię kom. miejskiej. Produkty projektu: -Dł. wybudowanych dróg dla rowerów:0,20 km -L.wybudowanych obiektów „parkuj i jedź”:1 szt* -L.wybudowanych obiektów „Bike&Ride”:2 szt. -L.stanowisk postojowych w wybudowanych obiektach „Bike&Ride”:40 szt. -Dł.wyznaczonych buspasów:0,69 km -L.wybudowanych zintegrowanych węzłów przesiadkowych:1 szt. -L.obiektów dostosowanych do potrzeb osób z niepełnosprawnościami:1 szt. -L.miejsc postojowych w wybudowanych obiektach „parkuj i jedź”:10 szt. -L.miejsc postojowych dla osób niepełnosprawnych w wybudowanych obiektach „parkuj i jedź”:1 szt. -L.zainstalowanych inteligentnych systemów transportowych:1 szt. -Dł. dróg, na których zainstalowano inteligentne systemy transportowe:1,2 km -L.zakupionych jednostek taboru pasażerskiego w publicznym transporcie zbiorowym komunikacji miejskiej:2 szt. -Pojemność zakupionego taboru pasażerskiego w publ. transporcie zbiorowym komunikacji miejskiej:124 os. -Całkowita dł. nowych lub przebudowanych linii komunikacji miejskiej:5,3 km. -L.projektów, w których sfinansowano koszty racjonalnych usprawnień dla os. z niepełnosprawnościami:1 szt. *utworzenie obiektu. (Polish)
    0 references
    Project for street redevelopment: As a result of the investment, there will be a transfer node integrating the transport modes present in Nysa.The project has an integrated and comprehensive character.As part of the reconstruction of the above-mentioned streets, individual transport will be limited.As a result of the modification of the above-mentioned streets, individual transport will be restricted. (together with 2 depot chargers), which will operate the new free line of the city cell. Products of the project: —L. of built roads for bicycles:0,20 km -L.built buildings "park and drive":1 pcs* -L.built buildings "Bike&Ride":2 pcs. —L. parking stations in built facilities "Bike&Ride":40 pcs. —Designed buses:0.69 km -L.built integrated interchange nodes: 1 pcs. —L objects adapted to the needs of people with disabilities: 1 pcs. —L parking spaces in built “park and drive” facilities:10 pcs. —L parking spaces for disabled persons in built “park and drive” facilities:1 pcs. —L. installed intelligent transport systems: 1 pcs. —The length of roads on which intelligent transport systems were installed:1.2 km -L. purchased passenger rolling stock units in public public transport of public transport: 2 pcs. —capacity of purchased passenger rolling stock in public transport publ:124 persons. —Total length of new or reconstructed public transport lines: 5,3 km. —L. projects which financed the costs of rational improvements for people with disabilities:1 pcs. *create an object. (English)
    20 October 2020
    0 references
    Projet de reconstruction de la rue: Chemin de fer, Wrocław, Marché, Douanes, ainsi qu’un système de transport intelligent et l’achat de matériel roulant à faible émission. Grâce à l’investissement, il y aura un hub de connexion intégrant les modes de transport présents à Nysa. Le projet a un caractère intégré et complet. Dans le cadre de la reconstruction des rues ci-dessus, le transport individuel sera limité dans le centre de Nysa et les solutions adoptées dans le domaine de l’organisation du trafic faciliteront le mouvement des véhicules collectifs.En outre, en vue d’encourager les résidents et les visiteurs à utiliser le transport, 2 seront achetés au bus. Le bus sera acheté. (avec 2 chargeurs de dépôt), qui exploiteront une nouvelle ligne libre de communications urbaines. Produits du projet: —De longues routes construites pour rowerów:0,20 km -L. objets construits «park and drive»:1 pcs* -L. objets construits «Bike&Ride»:2 pcs. —L. stations de stationnement dans construit «Bike &Ride»: 40 pcs. —Désigné buspasów:0,69 km -L. hubs intégrés:1 pcs. —L. installations adaptées aux besoins des personnes handicapées: 1 pcs. L. places de stationnement dans les objets construits «park and drive»:10 pièces. —L. places de stationnement pour les personnes handicapées dans les objets construits «park and drive»:1 pcs. —L.Intelligent systèmes de transport installés:1 pcs. —Pour les routes sur lesquelles des systèmes intelligents sont installés transportowe:1,2 km -L. unités achetées de matériel roulant de passagers dans les transports publics: 2 pièces. —Capacité du matériel roulant de passagers acheté dans les transports publics: miejskiej:124 —Longueur totale des lignes de communication neuves ou reconstruites miejskiej:5,3 km. —L. projets qui ont financé le coût des aménagements raisonnables pour les personnes handicapées:1 *création de l’objet. (French)
    1 December 2021
    0 references
    Straßenrekonstruktionsprojekt: Eisenbahn, Wrocław, Markt, Zoll, zusammen mit einem intelligenten Transportsystem und dem Kauf emissionsarmer Fahrzeuge. Als Ergebnis der Investition wird es einen Verbindungsknoten geben, der die in Nysa vorhandenen Verkehrsträger integriert. Das Projekt hat einen integrierten und umfassenden Charakter. Im Rahmen des Umbaus der oben genannten Straßen wird der Individualverkehr im Zentrum von Nysa begrenzt und die übernommenen Lösungen im Bereich der Verkehrsorganisation erleichtern die Bewegung von kollektiven Fahrzeugen. Darüber hinaus, um Bewohner und Besucher zu ermutigen, den Transport zu nutzen, wird 2 aus dem Bus gekauft. (zusammen mit 2 Depotladern),die eine neue freie Linie städtischer Kommms betreiben wird. Projektprodukte: —Lange Straßen gebaut für rowerów:0,20 km -L. gebaute Objekte „Park und Antrieb“:1 Stück* -L. gebaute Objekte „Bike&Ride“:2 Stk. —L. Parkplätze in gebaut „Bike&Ride“:40 Stk. —Designated buspasów:0,69 km -L. gebaute integrierte Hubs:1 Stk. An die Bedürfnisse von Menschen mit Behinderungen angepasste Einrichtungen: 1 Stk. —L. Parkplätze in gebauten Objekten „Park und Antrieb“:10 Stk. —L. Parkplätze für Menschen mit Behinderungen in gebauten Objekten „park and drive“:1 Stk. —L.Intelligente Transportsysteme installiert:1 Stk. —Für Straßen, auf denen intelligente Systeme installiert sind transportowe:1,2 km -L. gekaufte Einheiten von Personenfahrzeugen im öffentlichen Verkehr: 2 Stk. —Kapazität der gekauften Personenfahrzeuge im öffentlichen Verkehr: miejskiej:124 —Gesamtlänge der neuen oder umgebauten Kommunikationsleitungen miejskiej:5,3 km. L. Projekte, die die Kosten angemessener Vorkehrungen für Menschen mit Behinderungen finanzierten:1 *Erstellung des Objekts. (German)
    7 December 2021
    0 references
    Project voor de wederopbouw van de straat: Spoorweg, Wrocław, Markt, Douane, samen met een intelligent vervoerssysteem en de aankoop van emissiearm rollend materieel. Als gevolg van de investering zal er een verbindingsknooppunt zijn waarin de in Nysa aanwezige vervoerswijzen worden geïntegreerd. Het project heeft een geïntegreerd en uitgebreid karakter. Als onderdeel van de wederopbouw van de bovengenoemde straten zal individueel vervoer beperkt zijn in het centrum van Nysa en zullen de gekozen oplossingen op het gebied van de verkeersorganisatie het verkeer van collectieve voertuigen vergemakkelijken.Daarnaast zullen er 2 worden gekocht om bewoners en bezoekers aan te moedigen het vervoer te gebruiken. (samen met 2 depotladers),die een nieuwe vrije lijn van stedelijke communicatie zal exploiteren. Projectproducten: —Lange wegen gebouwd voor rowerów:0,20 km -L. gebouwde objecten „park and drive”:1 pcs* -L. gebouwde objecten „Bike&Ride”: 2 stuks. —L. parkeerplaatsen in gebouwd „Bike&Ride”: 40 stuks. —Aangewezen buspasów:0,69 km -L. gebouwde geïntegreerde hubs:1 pcs. L. voorzieningen aangepast aan de behoeften van personen met een handicap: 1 st. —L. parkeerplaatsen in gebouwde objecten „park and drive”: 10 stuks. —L. parkeerplaatsen voor mensen met een handicap in gebouwde objecten „park en drive”:1 pcs. —L.Intelligent geïnstalleerde vervoerssystemen: 1 PCs. —Voor wegen waarop intelligente systemen zijn geïnstalleerd transportowe:1,2 km -L. gekochte eenheden reizigerstreinen in het openbaar vervoer: 2 stuks. —Capaciteit van aangekocht rollend reizigersmaterieel in het openbaar vervoer: miejskiej:124 —Totale lengte van nieuwe of herbouwde communicatielijnen miejskiej:5,3 km. L. projecten die de kosten van redelijke aanpassingen voor personen met een handicap hebben gefinancierd:1 *creatie van het object. (Dutch)
    17 December 2021
    0 references
    Progetto di ricostruzione stradale: Ferrovia, Breslavia, Mercato, Dogana, insieme a un sistema di trasporto intelligente e l'acquisto di materiale rotabile a basse emissioni. A seguito dell'investimento, ci sarà un hub di collegamento che integra i modi di trasporto presenti a Nysa. Il progetto ha un carattere integrato e completo. Come parte della ricostruzione delle strade di cui sopra, il trasporto individuale sarà limitato nel centro di Nysa e le soluzioni adottate nel campo dell'organizzazione del traffico faciliteranno la circolazione dei veicoli collettivi. Inoltre, al fine di incoraggiare i residenti e i visitatori a utilizzare il trasporto, 2 saranno acquistati dall'autobus. L'autobus sarà acquistato. (insieme a 2 caricatori di deposito), che gestirà una nuova linea libera di comunicazioni urbane. Prodotti del progetto: —Lunghe strade costruite per rowerów:0,20 km -L. oggetti costruiti "parco e guida":1 pz* -L. oggetti costruiti "Bike&Ride": 2 pz. —L. stazioni di parcheggio in costruito "Bike&Ride": 40 pezzi. —Designated buspasów:0,69 km -L. costruito hub integrati:1 pz. L. strutture adattate alle esigenze delle persone con disabilità: 1 pz. —L. posti auto in oggetti costruiti "parcheggio e unità":10 pz. —L. posti auto per le persone con disabilità in oggetti costruiti "parcheggio e guida":1 pz. —L.Intelligent sistemi di trasporto installati: 1 pz. —Per le strade su cui sono installati sistemi intelligenti transportowe:1,2 km -L. unità di materiale rotabile passeggeri acquistate nel trasporto pubblico: 2 pz. Capacità del materiale rotabile per passeggeri acquistato nel trasporto pubblico: miejskiej:124 —Lunghezza totale delle linee di comunicazione nuove o ricostruite miejskiej:5,3 km. —L. progetti che hanno finanziato il costo di soluzioni ragionevoli per le persone con disabilità:1 *creazione dell'oggetto. (Italian)
    15 January 2022
    0 references
    Proyecto de reconstrucción de la calle: Ferrocarril, Wrocław, Mercado, Aduanas, junto con un sistema de transporte inteligente y la compra de material rodante de bajas emisiones. Como resultado de la inversión, habrá un centro de conexión que integrará los modos de transporte presentes en Nysa. El proyecto tiene un carácter integrado y completo. Como parte de la reconstrucción de las calles anteriores, el transporte individual se limitará en el centro de Nysa y las soluciones adoptadas en el ámbito de la organización del tráfico facilitarán el movimiento de vehículos colectivos. Además, con el fin de animar a residentes y visitantes a utilizar el transporte, se comprarán 2 desde el autobús. (junto con 2 cargadores de depósito), que operará una nueva línea libre de comunicaciones urbanas. Productos del proyecto: —Vías largas construidas para rowerów:0,20 km -L. objetos construidos «park and drive»:1 pcs* -L. objetos construidos «Bike&Ride»: 2 pcs. —L. estaciones de estacionamiento en construido «Bike&Ride»: 40 piezas. —Designado buspasów:0,69 km -L. construidos cubos integrados:1 pcs. —L. instalaciones adaptadas a las necesidades de las personas con discapacidad: 1 pcs. —L. plazas de aparcamiento en objetos construidos «parque y unidad»:10 pcs. —L. plazas de aparcamiento para personas con discapacidad en objetos construidos «parque y unidad»:1 pcs. —L. Sistemas de transporte inteligentes instalados:1 PC. —Para las carreteras en las que se instalan sistemas inteligentes transportowe:1,2 km -L. unidades compradas de material rodante de pasajeros en el transporte público público: 2 piezas. —Capacidad del material rodante de viajeros adquirido en el transporte público: miejskiej:124 —Longitud total de líneas de comunicación nuevas o reconstruidas miejskiej:5,3 km. L. proyectos que financiaron el costo de ajustes razonables para las personas con discapacidad:1 *creación del objeto. (Spanish)
    18 January 2022
    0 references
    Projekt for vejombygning: Som følge af investeringen vil der være et overførselsknudepunkt, der integrerer de transportformer, der er til stede i Nysa.Projektet har en integreret og omfattende karakter. Som led i genopbygningen af de ovennævnte gader vil individuel transport blive begrænset. Som følge af ændringen af ovennævnte gader vil individuel transport blive begrænset. (sammen med 2 depotopladere), som vil drive den nye gratis linje i bycellen. Projektets produkter: âEURL. af byggede veje til bicycles:0,20 km -L.byggede bygninger "park and drive":1 pcs* -L.byggede bygninger "Bike&Ride":2 stk. âEURL. parkeringsstationer i byggede faciliteter "Bike&Ride":40 stk. âEURDesigned buses:0.69 km -L. built integrated interchange nodes: 1 stk. âEURL objekter tilpasset behovene hos personer med handicap: 1 stk. âEURL parkeringspladser i bygget âEURpark and driveâ EUR faciliteter:10 stk. âEURL parkeringspladser til handicappede i bygget âEURpark og drev faciliteter:1 stk. ›L. installerede intelligente transportsystemer: 1 stk. âEURLængden af veje, hvor intelligente transportsystemer var installed:1.2 km -L. købte passager rullende materiel enheder i offentlig offentlig transport af offentlig transport: 2 stk. âEURkapacitet af indkøbt rullende passagermateriel i offentlig transport publ:124 personer. âEUR Samlet længde af nye eller rekonstruerede offentlige transportlinjer: 5,3 km. âEURL. projekter, der finansierede omkostningerne til rationelle forbedringer for personer med handicap:1 stk. *opret et objekt. (Danish)
    2 July 2022
    0 references
    Σχέδιο για την ανάπλαση των δρόμων: Ως αποτέλεσμα της επένδυσης, θα υπάρξει ένας κόμβος μεταφοράς που θα ενσωματώνει τους τρόπους μεταφοράς που υπάρχουν στη Nysa.Το έργο έχει ολοκληρωμένο και ολοκληρωμένο χαρακτήρα. Ως μέρος της ανακατασκευής των προαναφερόμενων οδών, οι ατομικές μεταφορές θα είναι περιορισμένες. Ως αποτέλεσμα της τροποποίησης των προαναφερόμενων οδών, οι ατομικές μεταφορές θα περιοριστούν. (μαζί με 2 φορτιστές αποθήκης), η οποία θα λειτουργεί τη νέα ελεύθερη γραμμή του πυρήνα της πόλης. Προϊόντα του έργου: âEURL. των χτισμένων δρόμων για το bicycles:0,20 km -L.χτίστηκε κτίρια «πάρκο και κίνηση»:1 τεμ * -L.χτίστηκε κτίρια «Bike&Ride»:2 τεμ. âEURL. σταθμοί στάθμευσης σε χτισμένες εγκαταστάσεις «Bike&Ride»:40 τεμ. â EURDesigned buses:0.69 km -L.built ολοκληρωμένους κόμβους ανταλλαγής: 1 τεμ. â EURL αντικείμενα προσαρμοσμένα στις ανάγκες των ατόμων με αναπηρίες: 1 τεμ. âEURL θέσεις στάθμευσης σε χτισμένο â EURpark και driveâ EUR εγκαταστάσεις: 10 τεμ. â EURL θέσεις στάθμευσης για άτομα με ειδικές ανάγκες σε χτισμένο â EURpark και driveâ EUR εγκαταστάσεις:1 τεμ. â EURL. εγκατασταθεί ευφυή συστήματα μεταφορών: 1 τεμ. â EUR Το μήκος των δρόμων στις οποίες ευφυή συστήματα μεταφορών ήταν installed:1.2 km -L. αγόρασε μονάδες επιβατικού τροχαίου υλικού στις δημόσιες συγκοινωνίες των δημόσιων μεταφορών: 2 τεμ. â EUR â EUR TM ικανότητα του αγορασμένου επιβατικού τροχαίου υλικού στις δημόσιες συγκοινωνίες publ:124 άτομα. â EUR Συνολικό μήκος των νέων ή ανακατασκευασμένων γραμμών δημόσιων μεταφορών: 5,3 km. â EURL. έργα που χρηματοδότησαν το κόστος των ορθολογικών βελτιώσεων για τα άτομα με αναπηρίες:1 τεμ. *δημιουργήστε ένα αντικείμενο. (Greek)
    2 July 2022
    0 references
    Projekt rekonstrukcije ulica: Kao rezultat ulaganja, bit će prijenos čvor integriranje načina prijevoza prisutnih u Nysa.Projekt ima integrirani i sveobuhvatan karakter.Kao dio rekonstrukcije gore navedenih ulica, individualni prijevoz će biti ograničen.Kao rezultat izmjene gore navedenih ulica, individualni prijevoz će biti ograničen. (zajedno s 2 punjača), koji će raditi na novoj besplatnoj liniji gradske ćelije. Proizvodi projekta: âEURL. od izgrađenih cesta za bicycles:0,20 km -L.izgrađene zgrade „park i pogon”: 1 kom * -L.izgrađene zgrade „Bike&Ride”: 2 kom. âEURL. Parkirališne stanice u izgrađenim objektima „Bike&Ride”: 40 kom. âEURDesigned buses:0.69 km -L.izgrađen integrirani čvorovi razmjene: 1 kom. âEURL objekti prilagođeni potrebama osoba s invaliditetom: 1 kom. âEURL parkirna mjesta u izgrađenom âEURpark i driveâEUR sadržaji:10 kom. âEURL parkirna mjesta za osobe s invaliditetom u izgrađenom âEURpark i driveâEUR objekata: 1 kom. âEURL. instaliran inteligentni prometni sustavi: 1 kom. âEURDuljina cesta na kojima su inteligentni prometni sustavi bili installed:1.2 km-L. kupljena je putnička željeznička vozila u javnom javnom prijevozu javnog prijevoza: 2 kom. â EUR Kapacitet kupljenih putničkih željezničkih vozila u javnom prijevozu publ:124 osobe. âEURUkupna duljina novih ili obnovljenih linija javnog prijevoza: 5,3 km. âEURL. projekti koji financiraju troškove racionalnih poboljšanja za osobe s invaliditetom: 1 kom. * stvoriti objekt. (Croatian)
    2 July 2022
    0 references
    Proiect de reamenajare stradală: Ca urmare a investiției, va exista un nod de transfer care va integra modurile de transport prezente în Nysa.Proiectul are un caracter integrat și cuprinzător. Ca parte a reconstrucției străzilor menționate mai sus, transportul individual va fi limitat. Ca urmare a modificării străzilor menționate mai sus, transportul individual va fi restricționat. (împreună cu 2 încărcătoare de depozit), care va opera noua linie liberă a celulei orașului. Produsele proiectului: â EURL. de drumuri construite pentru bicycles:0,20 km -L.construit clădiri „parc și unitate”:1 buc* -L.c. Clădiri construite „Bike&Ride”:2 buc. â EURL. stații de parcare în facilitățile construite „Bike&Ride”:40 buc. â EURDesigned buses:0.69 km -L. built noduri interschimb integrate: 1 buc. â EURL obiecte adaptate nevoilor persoanelor cu dizabilități: 1 buc. â EURL locuri de parcare în construit â EURparc și unitate facilități: 10 buc. â EURL locuri de parcare pentru persoanele cu handicap în construit â EURpark și driveâ EUR facilități:1 buc. â EURL. sisteme de transport inteligente instalate: 1 buc. Lungimea drumurilor pe care sistemele inteligente de transport au fost installed:1.2 km-L. unități de material rulant de călători achiziționate în transportul public public de transport public de transport public: 2 buc. Capacitatea materialului rulant de călători achiziționat în transportul public publ:124 persoane. Lungimea totală a liniilor de transport public noi sau reconstruite: 5,3 km. â EURL. proiecte care au finanțat costurile îmbunătățirilor raționale pentru persoanele cu dizabilități: 1 buc. *creați un obiect. (Romanian)
    2 July 2022
    0 references
    Projekt rekonštrukcie ulíc: Výsledkom investície bude transferový uzol integrujúci druhy dopravy prítomné v Nyse.Projekt má integrovaný a komplexný charakter.V rámci rekonštrukcie vyššie uvedených ulíc bude individuálna doprava obmedzená.V dôsledku zmeny vyššie uvedených ulíc bude individuálna doprava obmedzená. (spolu s 2 depo nabíjačkami), ktoré budú prevádzkovať novú voľnú linku mestskej cely. Produkty projektu: â EURL. postavených ciest pre bicycles:0,20 km -L.postavené budovy „park a pohon“:1 ks* -L.postavené budovy „Bike&Ride“: 2 ks. â EURL. parkovacie stanice v postavených zariadeniach „Bike&Ride“:40 ks. â EURDesigned buses:0.69 km -L.postavený integrované výmenné uzly: 1 ks â EURL objekty prispôsobené potrebám ľudí so zdravotným postihnutím: 1 ks parkovacích miest vo vstavanom parku a zariadení driveâ EUR:10 ks. â EURL parkovacie miesta pre telesne postihnutých osôb vo vstavanom parku a driveâ EUR zariadení:1 ks. â EURL. inštalované inteligentné dopravné systémy: 1 ks. Dĺžka ciest, na ktorých inteligentné dopravné systémy boli installed:1.2 km – L. zakúpené jednotky osobných železničných koľajových vozidiel vo verejnej verejnej doprave verejnej dopravy: 2 ks. › Kapacita zakúpených osobných železničných koľajových vozidiel vo verejnej doprave publ:124 osoby. › Celková dĺžka nových alebo rekonštruovaných liniek verejnej dopravy: 5,3 km. â EURL. projekty, ktoré financovali náklady na racionálne zlepšenie pre ľudí so zdravotným postihnutím:1 ks. *vytvoriť objekt. (Slovak)
    2 July 2022
    0 references
    Proġett għall-iżvilupp mill-ġdid tat-toroq: Bħala riżultat tal-investiment, se jkun hemm nodu ta’ trasferiment li jintegra l-modi tat-trasport preżenti f’Nysa.Il-proġett għandu karattru integrat u komprensiv. Bħala parti mir-rikostruzzjoni tat-toroq imsemmija hawn fuq, it-trasport individwali se jkun limitat.B’riżultat tal-modifika tat-toroq imsemmija hawn fuq, it-trasport individwali se jkun ristrett. (flimkien ma '2 ċarġers depot), li se joperaw il-linja ħielsa ġdida taċ-ċellula tal-belt. Prodotti tal-proġett: âEURL. ta ‘toroq mibnija għal bicycles:0,20 km -L.built bini “park u drive”: 1 pcs * -L.built bini “Bike&Ride”: 2 pcs. â EURL. stazzjonijiet ta ‘parkeġġ fil-faċilitajiet mibnija “Bike&Ride”:40 pcs. â EUR Iddisinjati buses:0.69 km -L.built nodi interkambju integrati: 1 pcs. â EURL oġġetti adattati għall-ħtiġijiet ta ‘persuni b’diżabilità: 1 pcs. â EURL spazji ta ‘parkeġġ fil-faċilitajiet mibnija EUR EURpark u driveâ EUR:10 pcs. â EURL spazji għall-parkeġġ għal persuni b’diżabilità fil-faċilitajiet mibnija EUR EURpark u driveâ EUR:1 pcs. â EURL. installati sistemi ta ‘trasport intelliġenti: 1 pcs. â EUR It-tul ta ‘toroq li fuqhom sistemi ta’ trasport intelliġenti kienu installed:1.2 km -L. mixtrija unitajiet ta ‘vetturi ferrovjarji tal-passiġġieri fit-trasport pubbliku pubbliku tat-trasport pubbliku: 2 biċċa â EUR TM kapaċità ta ‘vetturi ferrovjarji tal-passiġġieri mixtrija fit-trasport pubbliku publ:124 persuni. â EUR Tul totali ta ‘linji tat-trasport pubbliku ġodda jew mibnija mill-ġdid: 5.3 km. âEURL. proġetti li ffinanzjat l-ispejjeż ta ‘titjib razzjonali għall-persuni b’diżabilità: 1 pcs. * Oħloq oġġett. (Maltese)
    2 July 2022
    0 references
    Projeto de redesenvolvimento de ruas: Como resultado do investimento, haverá um nó de transferência integrando os modos de transporte presentes em Nysa.O projeto tem um caráter integrado e abrangente.Como parte da reconstrução das ruas acima mencionadas, o transporte individual será limitado. Como resultado da modificação das ruas acima mencionadas, o transporte individual será restrito. (juntamente com 2 carregadores de depósito), que operarão a nova linha livre da célula da cidade. Produtos do projeto: › de estradas construídas para bicycles:0,20 km -L.construído edifícios «parque e unidade»:1 pcs* -L.construído edifícios «Bike&Ride»: 2 pcs. › Estações de parque em instalações construídas «Bike&Ride»: 40 pcs. ›Designed buses:0.69 km -L.construído nós de intercâmbio integrados: 1 pcs. › Objetos adaptados às necessidades das pessoas com deficiência: 1 pcs. âEURL lugares de parque em construído ›parque e driveâ EUR instalações:10 pcs. âEURL lugares de parque para pessoas com deficiência em construído › parque e driveâ EUR instalações:1 pcs. âEURL. sistemas de transporte inteligentes instalados: A extensão das estradas em que os sistemas de transporte inteligentes eram installed:1.2 km -L. adquiriu unidades de material circulante de passageiros nos transportes públicos públicos de transportes públicos: Capacidade do material circulante de passageiros adquirido em transportes públicos publ:124 pessoas. EUR Comprimento total das linhas de transporte público novas ou reconstruídas: 5,3 km. âEURL. projetos que financiaram os custos de melhorias racionais para pessoas com deficiência:1 pcs. *crie um objeto. (Portuguese)
    2 July 2022
    0 references
    Katujen kunnostamista koskeva hanke: Investoinnin tuloksena Nysassa olevat liikennemuodot yhdistetään siirtosolmukkeisiin. Hanke on luonteeltaan yhtenäinen ja kattava. Osana edellä mainittujen katujen jälleenrakentamista yksittäiset kuljetukset ovat rajallisia.Edellä mainittujen katujen muuttamisen seurauksena yksittäisiä kuljetuksia rajoitetaan. (yhdessä 2 varikkolaturin kanssa), joka käyttää kaupungin solun uutta vapaata linjaa. Hankkeen tuotteet: rakennettuja teitä bicycles:0,20 km -L. Rakennettiin rakennuksia ”park and drive”:1 kpl* -L. Rakentuneet rakennukset ”Bike&Ride”:2 kpl. âEURL. pysäköintiasemat rakennetuissa tiloissa ”Bike&Ride”:40 kpl. âEURDesigned buses:0.69 km -L. Rakensi integroidut vaihtosolmukkeet: 1 kpl. âEURL esineitä mukautettu vammaisten tarpeisiin: 1 kpl. Pysäköintipaikkoja rakennetuissa pysäköintipaikoissa ja paikoitustiloissa:10 kpl. âEURL pysäköintipaikkoja vammaisille rakennettu parkkipaikka ja driveâ EUR tilat: 1 kpl. âEURL. asennetut älykkäät liikennejärjestelmät: Niiden teiden pituus, joilla älykkäät liikennejärjestelmät olivat installed:1.2 km -L. osti julkisen joukkoliikenteen henkilöliikenteen liikkuvaa kalustoa: 2 kpl. Ostetun henkilöliikenteen liikkuvan kaluston kapasiteetti julkisessa liikenteessä publ:124 henkilöt. Uusien tai rekonstruoitujen julkisen liikenteen ratojen kokonaispituus: 5,3 km. âEURL. hankkeita, jotka rahoittivat kustannuksia järkiperäisiä parannuksia vammaisille: 1 kpl. *luo objekti. (Finnish)
    2 July 2022
    0 references
    Projekt za prenovo ulice: Kot rezultat investicije bo prišlo do transfernega vozlišča, ki bo povezovalo načine prevoza, ki so prisotni v Nysi.Projekt ima integriran in celovit značaj.Kot del obnove zgoraj omenjenih ulic bo individualni prevoz omejen. Zaradi spremembe zgoraj omenjenih ulic bo individualni prevoz omejen. (skupaj z dvema polnilnikoma depoja), ki bo upravljal novo brezplačno linijo mestne celice. Izdelki projekta: â EURL. zgrajenih cest za bicycles:0,20 km -L.zgrajene stavbe „park and drive“:1 kos* -L.zgrajene stavbe „Bike&Ride“:2 kos. â EURL. parkirne postaje v zgrajenih objektih „Bike&Ride“: 40 kosov. â EURDesigned buses:0.69 km -L.zgrajena integrirana vozlišča za izmenjavo: 1 kos. â EURL predmeti, prilagojeni potrebam ljudi s posebnimi potrebami: 1 kos. â EURL parkirnih mest v zgrajena â EUR EURpark in driveâ EUR objektov:10 kosov. â EURL parkirnih mest za invalide v zgrajena â EUR EURpark in driveâ EUR objektov:1 kos. â EURL. nameščen inteligentni prometni sistemi: Dolžina cest, na katerih so bili inteligentni prometni sistemi installed:1.2 km -L. kupljene enote potniškega voznega parka v javnem javnem prevozu javnega prevoza: 2 kos. â EUR zmogljivosti kupljenih potniških tirnih vozil v javnem prevozu publ:124 Osebe. â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â 5,3 km. â EURL. projekti, ki so financirali stroške racionalnih izboljšav za ljudi s posebnimi potrebami:1 kosov. *ustvari predmet. (Slovenian)
    2 July 2022
    0 references
    Projekt rekonstrukce ulic: V důsledku investice vznikne transferový uzel integrující druhy dopravy přítomné v Nyse. Projekt má integrovaný a komplexní charakter.V rámci rekonstrukce výše uvedených ulic bude individuální doprava omezena.V důsledku úpravy výše uvedených ulic bude individuální doprava omezena. (společně se 2 nabíječkami depa), které budou provozovat novou volnou linku městské buňky. Produkty projektu: â EURL. postavených silnic pro bicycles:0,20 km -L. postavených budov „park and drive“:1 ks* -L.postavených budov „Bike&Ride“:2 ks. ›. parkovací stanice ve vybudovaných zařízeních „Bike&Ride“:40 ks ›Designed buses:0.69 km -L. built integrované výměnné uzly: 1 ks › objekty přizpůsobené potřebám osob se zdravotním postižením: 1 ks › parkovací místa v zabudovaném â EURpark a driveâ EUR zařízení:10 ks. › L parkovací místa pro osoby se zdravotním postižením ve postavených â EURpark a driveâ EUR zařízení:1 ks. â EURL. instalované inteligentní dopravní systémy: 1 ks ›Délka silnic, na kterých byly inteligentní dopravní systémy installed:1.2 km -L. zakoupily kolejová vozidla pro přepravu cestujících ve veřejné hromadné dopravě veřejné dopravy: 2 ks › Kapacita zakoupených osobních kolejových vozidel ve veřejné dopravě publ:124 osob › Celková délka nových nebo rekonstruovaných linek veřejné dopravy: 5,3 km. â EURL. projekty, které financovaly náklady na racionální zlepšení pro osoby se zdravotním postižením:1 ks. *vytvořte objekt. (Czech)
    2 July 2022
    0 references
    Gatvių pertvarkymo projektas: Dėl investicijų atsiras perkėlimo mazgas, į kurį bus integruotos Nysoje esančios transporto rūšys. Projektas yra integruotas ir visapusiškas.Atsižvelgiant į pirmiau minėtų gatvių rekonstrukciją, individualus transportas bus apribotas.Pakeitus pirmiau minėtas gatves, individualus transportas bus apribotas. (kartu su 2 depų įkrovikliais), kurie eksploatuos naują nemokamą miesto kameros liniją. Projekto produktai: â EURL. nutiestų kelių bicycles:0,20 km -L. pastatytas pastatų „parkas ir vairuoti“:1 vnt* -L. pastatytas pastatai „Bike &Ride“:2 vnt. â EURL. parkavimo stotys pastatytuose objektuose „Bike &Ride“:40 vnt. â EURDesigned buses:0.69 km -L.built integruoti mainų mazgai: 1 vnt. â EURL objektai pritaikyti žmonių su negalia poreikiams: 1 vnt. âL automobilių stovėjimo aikštÄ s pastatytas â EURpark and driveâ EUR patogumai: 10 vnt. âL automobilių stovėjimo aikštÄ s neįgaliems asmenims pastatytas â EURpark and driveâ EUR įranga: 1 vnt. â EURL. Įdiegtos pažangios transporto sistemos: 1 vnt. ā EUR "Kelio ilgis, kuriame intelektualiosios transporto sistemos buvo installed:1.2 km -L. įsigijo keleivinių riedmenų vienetų viešojo viešojo transporto viešajame transporte: 2 vnt. â pajėgumas įsigytų keleivinių riedmenų viešajame transporte publ:124 asmenys. âEURVisas naujų arba rekonstruotų viešojo transporto linijų ilgis: 5,3 km. ā EURL. projektai, kurie finansavo racionalių patobulinimų išlaidas žmonėms su negalia: 1 vnt. *sukurkite objektą. (Lithuanian)
    2 July 2022
    0 references
    Ielu pārbūves projekts: Investīciju rezultātā tiks izveidots nodošanas mezglpunkts, kas integrēs Nysa transporta veidus.Projektam ir integrēts un visaptverošs raksturs.Kā daļa no iepriekš minēto ielu rekonstrukcijas, individuālais transports būs ierobežots. Kā rezultātā iepriekš minēto ielu modifikācijas, individuālais transports tiks ierobežots. (kopā ar 2 depo lādētājiem), kas ekspluatēs jauno bezmaksas līniju pilsētas šūnā. Projekta produkti: â EURL. no būvētiem ceļiem bicycles:0,20 km -L.built ēkas “park and drive”:1 gab.* -L.built ēkas “Bike&Ride”: 2 gab. EURL. Autostāvvietas izbūvētās telpās “Bike&Ride”: 40 gab. â EUR. Projektēts buses:0.69 km -L.built integrēti apmaiņas mezgli: 1 gab. EURL objekti, kas pielāgoti cilvēku ar invaliditāti vajadzībām: 1 gab. EURL autostāvvietas iebūvētās EURpark un driveâ EUR iekārtās: 10 gab. EURL autostāvvietas invalīdiem būvētas EURpark un driveâ EUR iekārtas: 1 gab. EURL. uzstādītas inteliģentas transporta sistēmas: 1 gab. Autoceļu garums, pa kuriem viedās transporta sistēmas bija installed:1.2 km -L. iegādātās pasažieru ritošā sastāva vienības sabiedriskā sabiedriskā transporta sabiedriskajā transportā: 2 gab. Iegādātā pasažieru ritošā sastāva jauda sabiedriskajā transportā publ:124 personas. âEUR Kopējais jaunu vai rekonstruētu sabiedriskā transporta līniju garums: 5,3 km. EURL. projekti, kas finansēja racionālu uzlabojumu izmaksas cilvēkiem ar invaliditāti: 1 gab. *izveidot objektu. (Latvian)
    2 July 2022
    0 references
    Проект за реконструкция на улицата: В резултат на инвестицията ще има трансферен възел, интегриращ видовете транспорт, присъстващи в Nysa.Проектът има интегриран и цялостен характер.Като част от реконструкцията на горепосочените улици, индивидуалният транспорт ще бъде ограничен.В резултат на модификацията на горепосочените улици, индивидуалният транспорт ще бъде ограничен. (заедно с 2 зарядни устройства), които ще работят с новата безплатна линия на градската клетка. Продукти на проекта: âEURL. на изградени пътища за bicycles:0,20 km -L.построени сгради „парк и диск„:1 бр.* -L.построени сгради „Bike&Ride“:2 бр. âEURL. паркинги в изградени съоръжения „Bike&Ride“: 40 бр. â EURDesigned buses:0.69 km -L. построени интегрирани обменни възли: 1 бр. âEURL обекти, адаптирани към нуждите на хората с увреждания: 1 бр. âEURL паркоместа в изградени съоръжения â EURpark и driveâ EUR: 10 бр. âEURL паркоместа за хора с увреждания в изградени съоръжения â EURpark и driveâEUR:1 бр. инсталирани интелигентни транспортни системи: 1 бр. Дължината на пътищата, по които интелигентните транспортни системи са били installed:1.2 km -L, закупи пътнически подвижен състав в обществения обществен транспорт: 2 бр. Капацитет на закупения пътнически подвижен състав в обществения транспорт publ:124 лица. âEURoбща дължина на нови или реконструирани линии за обществен транспорт: 5,3 км. â EURL. проекти, които финансират разходите за рационални подобрения за хора с увреждания:1 бр. *създаване на обект. (Bulgarian)
    2 July 2022
    0 references
    Útépítési projekt: A beruházás eredményeként lesz egy transzfer csomópont, amely integrálja a Nysában jelen lévő közlekedési módokat.A projekt integrált és átfogó jellegű.A fent említett utcák újjáépítésének részeként az egyéni közlekedés korlátozott lesz.A fent említett utcák módosításának eredményeként az egyéni közlekedés korlátozott lesz. (együtt 2 depot töltővel), amely a városi cella új szabad vonalát működteti. A projekt termékei: épített utak: bicycles:0,20 km -L.built épületek „park and drive”:1 db* -L.built épületek „Bike&Ride”: 2 db. parkoló állomások beépített létesítményekben „Bike&Ride”: 40 db. âEURDesigned buses:0.69 km -L.built integrált csomópontok: 1 db. âEURL tárgyak a fogyatékkal élők igényeihez igazodva: 1 db. âEURL parkolóhelyek beépített park és meghajtó létesítmények:10 db. âEURL parkolóhelyek a fogyatékkal élők számára a beépített park és a meghajtó létesítmények:1 db. âEURL. telepített intelligens közlekedési rendszerek: 1 db. âEURA hossza az utak, amelyeken intelligens közlekedési rendszerek voltak installed:1.2 km-L. vásárolt személyszállító gördülő egységek tömegközlekedési tömegközlekedés: 2 db vásárolt vasúti személyszállító jármű kapacitása a tömegközlekedésben publ:124 személyek. â EURÖSSZESEN az új vagy felújított tömegközlekedési vonalak teljes hossza: 5,3 km. â EURL. projektek, amelyek finanszírozták a racionális fejlesztések költségeit a fogyatékkal élők számára: 1 db. * hozzon létre egy objektumot. (Hungarian)
    2 July 2022
    0 references
    Tionscadal le haghaidh athfhorbairt sráide: Mar thoradh ar an infheistíocht, beidh nód aistrithe ann a chomhtháthóidh na modhanna iompair atá i Nysa.Tá carachtar comhtháite agus cuimsitheach ag an tionscadal.Mar chuid d’atógáil na sráideanna thuasluaite, beidh iompar aonair teoranta.Mar thoradh ar mhodhnú na sráideanna thuasluaite, cuirfear srian le hiompar aonair. (in éineacht le 2 chargers iosta), a oibreoidh líne saor in aisce nua chill na cathrach. Táirgí an tionscadail: âEURL. de bhóithre a tógadh le haghaidh bicycles:0,20 km-L. tógtha foirgnimh “páirceáil agus tiomáint”: 1 ríomhaire * -L. tógtha foirgnimh “Bike & Ride”: 2 ríomhaire. âEURL. stáisiúin pháirceála i saoráidí tógtha “Bike & Ride”: 40 ríomhaire. 1 ríomhaire. âEURL rudaí in oiriúint do riachtanais daoine faoi mhíchumas: 1 ríomhairí pearsanta. âEURL spásanna páirceála in áiseanna tógtha Páirceáil agus driveâ EUR â EUR âEURL spásanna páirceála do dhaoine faoi mhíchumas i tógthaâ EUR Páirceáil agus driveâ EUR Áiseanna: 1 ríomhairí pearsanta.â EUR â EUR â EUR â EUR â EUR Córais iompair suiteáilte Chliste: 1 ríomhaire. â EURTá fad na mbóithre ar a raibh córais iompair Chliste installed:1.2 km -L. ceannaíodh aonaid rothstoc paisinéirí in iompar poiblí iompair phoiblí iompair phoiblí: 2 ríomhaire. âEURacmhainn rothstoc paisinéirí a ceannaíodh in iompar poiblí: Daoine aonair i bhfad iomlán na línte iompair phoiblí nua nó atógtha: 5.3 km. âEURL. tionscadail a mhaoinigh na costais a bhaineann le feabhsuithe réasúnta do dhaoine faoi mhíchumas: 1 ríomhaire. cé gurbh iad Avondale rogha na coitianta tháinig buachaillí GCM le plean agus chuireadar I bhfeidhm é. (Irish)
    2 July 2022
    0 references
    Projekt för ombyggnad av vägar: Som ett resultat av investeringen kommer det att finnas en överföringsnod som integrerar de transportsätt som finns i Nysa.Projektet har en integrerad och omfattande karaktär.Som en del av återuppbyggnaden av ovannämnda gator kommer de individuella transporterna att begränsas.Som ett resultat av modifieringen av ovannämnda gator kommer individuella transporter att begränsas. (tillsammans med 2 depåladdare), som kommer att driva den nya fria linjen i stadscellen. Projektets produkter: â EURL. av byggda vägar för bicycles:0,20 km -L.byggda byggnader ”park and drive”:1 st* -L.byggda byggnader ”Bike&Ride”:2 st. â EURL. parkeringsplatser i inbyggda anläggningar ”Bike&Ride”:40 st. âEURDesigned buses:0.69 km -L.byggda integrerade utbytesnoder: 1 st. â EURL objekt anpassade till behoven hos personer med funktionshinder: 1 st. â EURL parkeringsplatser i byggd â EURpark och enhet faciliteter: 10 st. â EURL parkeringsplatser för funktionshindrade i inbyggd â EURpark och driveâ EUR 1 st. â EURL. installerade intelligenta transportsystem: 1 st. â EUR Längden på de vägar på vilka intelligenta transportsystem var installed:1.2 km -L. köpte passagerarfordon i kollektivtrafiken för kollektivtrafik: 2 st. â EURkapacitet för inköpt passagerarfordon i kollektivtrafik publ:124 personer. âEURTotal längd på nya eller rekonstruerade kollektivtrafiklinjer: 5,3 km. â EURL. projekt som finansierade kostnaderna för rationella förbättringar för personer med funktionshinder:1 st. *skapa ett objekt. (Swedish)
    2 July 2022
    0 references
    Tänavate rekonstrueerimise projekt: Investeeringu tulemusena on olemas ülekandesõlm, mis ühendab Nysa transpordiliigid.Projektil on integreeritud ja terviklik iseloom.Kuna eespool nimetatud tänavate rekonstrueerimine on piiratud, on individuaalne transport piiratud.Nimetatud tänavate muutmise tulemusena piiratakse individuaalset transporti. (koos kahe depoolaadijaga), kes käitavad linnakambri uut vabaliini. Projekti tulemused: ehitatud teedest bicycles:0,20 km -L.ehitatud hooned „park ja sõita“:1 tk* -L.ehitatud hooned „Bike&Ride“:2 tk. âEURL. parklad ehitatud rajatistes „Bike&Ride“: 40 tk. âEURDesigned buses:0.69 km -L.ehitatud integreeritud andmevahetussõlmed: 1 tk. puuetega inimeste vajadustele kohandatud objektid: 1 tk. Parkimiskohad ehitatud âEURpark ja drive rajatis: 10 tk. âEURL parkimiskohad puuetega inimestele ehitatud âEURpark ja sõita rajal:1 tk. âEURL. paigaldatud intelligentsed transpordisüsteemid: 1 tk. Maantee pikkus, kus intelligentsed transpordisüsteemid olid installed:1.2 km -L, ostis ühistranspordi ühistranspordis reisijateveo veeremiüksused: 2 tk. ostetud reisijateveoveerem ühistranspordis publ:124 Isikud. Uute või rekonstrueeritud ühistranspordiliinide kogupikkus: 5,3 km. â EURL. projektidest, millega rahastati puuetega inimeste ratsionaalse täiustamise kulusid:1 tk. *luua objekt. (Estonian)
    2 July 2022
    0 references
    WOJ.: OPOLSKIE, POW.: nyski
    0 references

    Identifiers

    RPOP.03.01.01-16-0009/16
    0 references