Revitalisation of Bodzentyn — stage II (Q4416883): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: Setting new description)
(‎Changed label, description and/or aliases in en, and other parts)
label / enlabel / en
 
Revitalisation of Bodzentyn — stage II
Property / summary
 
The project provides for activities aimed at stimulating the social, economic and tourism-cultural city of Bodzentyn, creating conditions for the development of entrepreneurship, expanding the cultural offer, creating new tourist products, creating places integrating residents, increasing the aesthetics of public space, increasing security. These objectives will be achieved by: reconstruction of the “small market” and the construction of a parking lot at ul. Church, reconstruction of ul. Langiewicza (including replacement of water supply, sewage and lighting), construction of drainage of ul. Langiewicza and the Home Army, replacement of water supply ul. Cheerful, construction of a sidewalk at ul. Freedom, reconstruction of ul. Ecclesiastical, thermal modernisation of the building after the former animal clinic at ul. Freedom to adapt to cultural and social needs, demulation and renovation of the bishop’s ponds, monitoring of the city, retrofitting of the Adela Nawrot Public Library and the Cultural Centre in Bodzentin. The project requested, together with projects already implemented and planned for implementation, falls within the specific objectives of Priority Axis 6 and Measure 6.5, i.e. Enhanced socio-economic, physical and spatial development of urban areas, including post-industrial areas. The activities indicated in the project have a positive impact on social integration, increase the tourist potential of the municipality, contribute to reducing poverty and increasing employability. The implementation of the project will contribute to the achievement of indicators: Area of revitalisation areas — 3.48 ha; Number of facilities adapted to the needs of persons with disabilities — 3 pcs., Number of supported infrastructure facilities located in revitalised areas — 3 pcs; Number of newly created jobs — other forms (EPC) — 3 pcs. The predominant category of costs is the road inf. (English)
Property / summary: The project provides for activities aimed at stimulating the social, economic and tourism-cultural city of Bodzentyn, creating conditions for the development of entrepreneurship, expanding the cultural offer, creating new tourist products, creating places integrating residents, increasing the aesthetics of public space, increasing security. These objectives will be achieved by: reconstruction of the “small market” and the construction of a parking lot at ul. Church, reconstruction of ul. Langiewicza (including replacement of water supply, sewage and lighting), construction of drainage of ul. Langiewicza and the Home Army, replacement of water supply ul. Cheerful, construction of a sidewalk at ul. Freedom, reconstruction of ul. Ecclesiastical, thermal modernisation of the building after the former animal clinic at ul. Freedom to adapt to cultural and social needs, demulation and renovation of the bishop’s ponds, monitoring of the city, retrofitting of the Adela Nawrot Public Library and the Cultural Centre in Bodzentin. The project requested, together with projects already implemented and planned for implementation, falls within the specific objectives of Priority Axis 6 and Measure 6.5, i.e. Enhanced socio-economic, physical and spatial development of urban areas, including post-industrial areas. The activities indicated in the project have a positive impact on social integration, increase the tourist potential of the municipality, contribute to reducing poverty and increasing employability. The implementation of the project will contribute to the achievement of indicators: Area of revitalisation areas — 3.48 ha; Number of facilities adapted to the needs of persons with disabilities — 3 pcs., Number of supported infrastructure facilities located in revitalised areas — 3 pcs; Number of newly created jobs — other forms (EPC) — 3 pcs. The predominant category of costs is the road inf. (English) / rank
 
Normal rank
Property / summary: The project provides for activities aimed at stimulating the social, economic and tourism-cultural city of Bodzentyn, creating conditions for the development of entrepreneurship, expanding the cultural offer, creating new tourist products, creating places integrating residents, increasing the aesthetics of public space, increasing security. These objectives will be achieved by: reconstruction of the “small market” and the construction of a parking lot at ul. Church, reconstruction of ul. Langiewicza (including replacement of water supply, sewage and lighting), construction of drainage of ul. Langiewicza and the Home Army, replacement of water supply ul. Cheerful, construction of a sidewalk at ul. Freedom, reconstruction of ul. Ecclesiastical, thermal modernisation of the building after the former animal clinic at ul. Freedom to adapt to cultural and social needs, demulation and renovation of the bishop’s ponds, monitoring of the city, retrofitting of the Adela Nawrot Public Library and the Cultural Centre in Bodzentin. The project requested, together with projects already implemented and planned for implementation, falls within the specific objectives of Priority Axis 6 and Measure 6.5, i.e. Enhanced socio-economic, physical and spatial development of urban areas, including post-industrial areas. The activities indicated in the project have a positive impact on social integration, increase the tourist potential of the municipality, contribute to reducing poverty and increasing employability. The implementation of the project will contribute to the achievement of indicators: Area of revitalisation areas — 3.48 ha; Number of facilities adapted to the needs of persons with disabilities — 3 pcs., Number of supported infrastructure facilities located in revitalised areas — 3 pcs; Number of newly created jobs — other forms (EPC) — 3 pcs. The predominant category of costs is the road inf. (English) / qualifier
 
point in time: 21 October 2022
Timestamp+2022-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 14:16, 21 October 2022

Project Q4416883 in Poland
Language Label Description Also known as
English
Revitalisation of Bodzentyn — stage II
Project Q4416883 in Poland

    Statements

    0 references
    3,999,967.65 zloty
    0 references
    889,192.81 Euro
    0 references
    5,333,290.21 zloty
    0 references
    1,185,590.41 Euro
    0 references
    75.0 percent
    0 references
    1 May 2018
    0 references
    30 September 2023
    0 references
    GMINA BODZENTYN
    0 references
    0 references
    Projekt przewiduje działania mające na celu pobudzenie społeczne, gospodarcze i turystyczno-kulturalne miasta Bodzentyn, stworzenie warunków do rozwoju przedsiębiorczości, rozszerzenie oferty kulturalnej, powstanie nowych produktów turystycznych, utworzenie miejsc integrujących mieszkańców, wzrost estetyki przestrzeni publicznej, wzrost bezpieczeństwa. Cele te będą osiągnięte poprzez: przebudowę "małej targowicy" i budowę parkingu przy ul. Kościelnej, przebudowę ul. Langiewicza (wraz z wymianą wodociągu, kanalizacji i oświetlenia), budowę odwodnienia ul. Langiewicza i Armii Krajowej, wymianę wodociągu ul. Wesołej, budowę chodnika przy ul. Wolności, przebudowę ul. Kościelnej, termomodernizację budynku po dawnej lecznicy zwierząt przy ul. Wolności w celu adaptacji na potrzeby kulturalno-społeczne, odmulenie i remont stawów biskupich, monitoring miasta, doposażenie Biblioteki Publicznej im. Adeli Nawrot i Centrum Kultury w Bodzentynie. Wnioskowany projekt łącznie z projektami już zrealizowanymi oraz planowanymi do wdrożenia wpisuje się w cele szczegółowe Osi priorytetowej 6 i Działania 6.5 tj. Wzmocniony rozwój społeczno-gospodarczy, fizyczny i przestrzenny obszarów miejskich, w tym poprzemysłowych. Działania wskazane w projekcie wpływają pozytywnie na integrację społeczną, zwiększają potencjał turystyczny gminy, przyczyniają się do zmniejszenia ubóstwa oraz zwiększenia szans zatrudnienia. Realizacja projektu przyczyni się do osiągnięcia wskaźników: Powierzchnia obszarów objętych rewitalizacją - 3,48 ha; Liczba obiektów dostosowanych do potrzeb osób z niepełnosprawnościami - 3 szt., Liczba wspartych obiektów infrastruktury zlokalizowanych na rewitalizowanych obszarach - 3 szt.; Liczba nowo utworzonych miejsc pracy - pozostałe formy (EPC) - 3 szt. Dominującą kategorią kosztów jest inf. drogowa. (Polish)
    0 references
    The project provides for activities aimed at stimulating the social, economic and tourism-cultural city of Bodzentyn, creating conditions for the development of entrepreneurship, expanding the cultural offer, creating new tourist products, creating places integrating residents, increasing the aesthetics of public space, increasing security. These objectives will be achieved by: reconstruction of the “small market” and the construction of a parking lot at ul. Church, reconstruction of ul. Langiewicza (including replacement of water supply, sewage and lighting), construction of drainage of ul. Langiewicza and the Home Army, replacement of water supply ul. Cheerful, construction of a sidewalk at ul. Freedom, reconstruction of ul. Ecclesiastical, thermal modernisation of the building after the former animal clinic at ul. Freedom to adapt to cultural and social needs, demulation and renovation of the bishop’s ponds, monitoring of the city, retrofitting of the Adela Nawrot Public Library and the Cultural Centre in Bodzentin. The project requested, together with projects already implemented and planned for implementation, falls within the specific objectives of Priority Axis 6 and Measure 6.5, i.e. Enhanced socio-economic, physical and spatial development of urban areas, including post-industrial areas. The activities indicated in the project have a positive impact on social integration, increase the tourist potential of the municipality, contribute to reducing poverty and increasing employability. The implementation of the project will contribute to the achievement of indicators: Area of revitalisation areas — 3.48 ha; Number of facilities adapted to the needs of persons with disabilities — 3 pcs., Number of supported infrastructure facilities located in revitalised areas — 3 pcs; Number of newly created jobs — other forms (EPC) — 3 pcs. The predominant category of costs is the road inf. (English)
    21 October 2022
    0 references
    WOJ.: ŚWIĘTOKRZYSKIE, POW.: kielecki
    0 references

    Identifiers

    RPSW.06.05.00-26-0005/17
    0 references