Construction of a system of bicycle paths and pedestrian-bike tracks along district road No 2121K from Aleksandrowice to the junction with provincial road No. 774 in Balice by the A4 motorway in Zabierzów Commune (Q4421658): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in en: Setting new description) |
(Changed label, description and/or aliases in en, and other parts) |
||||||||||||||
label / en | label / en | ||||||||||||||
Construction of a system of bicycle paths and pedestrian-bike tracks along district road No 2121K from Aleksandrowice to the junction with provincial road No. 774 in Balice by the A4 motorway in Zabierzów Commune | |||||||||||||||
Property / summary | |||||||||||||||
The subject of the project is to carry out construction works on the district road No 2121K on the section approx. 2552 to 5 312 km consisting of the construction of a walking path. The scope of the project includes the construction of a bicycle path, a walkway, a bicycle path, a left-hand side road with a width, the construction of platform bays and bus stops, construction of slopes fortification, construction of drainage along with drainage, reconstruction of short sections of the road surface and reconstruction of ditches and descents, construction of street lighting and all accompanying works. Estimated number of works: construction of a bicycle path on a length of 187.1 m construction of a pedestrian track on a length of 2 444.6 m construction of sidewalks, platforms at stops at a length of 324.7 m construction and modernisation of street lighting on a length of 2 239.9 m modernisation of drainage in connection with the construction of bicycle infrastructure, including the construction of a rainwater system at a length of approx. 1 370.1 m extension of culverts under the district road, forced by the construction of bicycle infrastructure pcs. 2 construction of crossings through cycling and walking tracks in the place of existing exits demolition of conflicting fences, culverts, descents, etc. cutting of high greenery and bushes conflicting with the investment. (English) | |||||||||||||||
Property / summary: The subject of the project is to carry out construction works on the district road No 2121K on the section approx. 2552 to 5 312 km consisting of the construction of a walking path. The scope of the project includes the construction of a bicycle path, a walkway, a bicycle path, a left-hand side road with a width, the construction of platform bays and bus stops, construction of slopes fortification, construction of drainage along with drainage, reconstruction of short sections of the road surface and reconstruction of ditches and descents, construction of street lighting and all accompanying works. Estimated number of works: construction of a bicycle path on a length of 187.1 m construction of a pedestrian track on a length of 2 444.6 m construction of sidewalks, platforms at stops at a length of 324.7 m construction and modernisation of street lighting on a length of 2 239.9 m modernisation of drainage in connection with the construction of bicycle infrastructure, including the construction of a rainwater system at a length of approx. 1 370.1 m extension of culverts under the district road, forced by the construction of bicycle infrastructure pcs. 2 construction of crossings through cycling and walking tracks in the place of existing exits demolition of conflicting fences, culverts, descents, etc. cutting of high greenery and bushes conflicting with the investment. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The subject of the project is to carry out construction works on the district road No 2121K on the section approx. 2552 to 5 312 km consisting of the construction of a walking path. The scope of the project includes the construction of a bicycle path, a walkway, a bicycle path, a left-hand side road with a width, the construction of platform bays and bus stops, construction of slopes fortification, construction of drainage along with drainage, reconstruction of short sections of the road surface and reconstruction of ditches and descents, construction of street lighting and all accompanying works. Estimated number of works: construction of a bicycle path on a length of 187.1 m construction of a pedestrian track on a length of 2 444.6 m construction of sidewalks, platforms at stops at a length of 324.7 m construction and modernisation of street lighting on a length of 2 239.9 m modernisation of drainage in connection with the construction of bicycle infrastructure, including the construction of a rainwater system at a length of approx. 1 370.1 m extension of culverts under the district road, forced by the construction of bicycle infrastructure pcs. 2 construction of crossings through cycling and walking tracks in the place of existing exits demolition of conflicting fences, culverts, descents, etc. cutting of high greenery and bushes conflicting with the investment. (English) / qualifier | |||||||||||||||
point in time: 21 October 2022
|
Revision as of 13:38, 21 October 2022
Project Q4421658 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of a system of bicycle paths and pedestrian-bike tracks along district road No 2121K from Aleksandrowice to the junction with provincial road No. 774 in Balice by the A4 motorway in Zabierzów Commune |
Project Q4421658 in Poland |
Statements
7,156,370.82 zloty
0 references
1,590,861.23 Euro
0 references
8,419,259.82 zloty
0 references
1,871,601.46 Euro
0 references
85.0 percent
0 references
22 October 2021
0 references
30 April 2023
0 references
GMINA ZABIERZÓW
0 references
Przedmiotem projektu jest przeprowadzenie robót budowlanych na drodze powiatowej nr 2121K na odcinku ok. 2552 do 5312 km polegającej na budowie ścieżki pieszorowerowej. Zakres projektu obejmuje budowę ścieżki pieszo rowerowej, chodnika, ścieżki rowerowej, pobocza lewostronnego o szerokości, budowę zatok peronów i wiat przystankowych, budowę umocnienia skarp, budowę odwodnienia wraz z odprowadzeniem wód, przebudowę krótkich odcinków nawierzchni jezdni oraz przebudowę rowów oraz zjazdów, budowę oświetlenia ulicznego oraz wszelkie roboty towarzyszące. Szacunkowe ilości robót: budowa ścieżki rowerowej na długości 187,1m budowa ciąg pieszorowerowego na długości 2444,6m budowa chodników, peronów na przystankach na długości 324,7m budowa i modernizacja oświetlenia ulicznego na długości 2239,9m modernizacja odwodnienia w związku z budową infrastruktury rowerowej, w tym budowa kanalizacji deszczowej na długości ok. 1370,1 m przedłużenie przepustów pod drogą powiatową, wymuszone budową infrastruktury rowerowej szt. 2 budowa przejazdów przez ciągi rowerowe i pieszorowerowe w miejscu istniejących zjazdów rozbiórka kolidujących ogrodzeń, przepustów, zjazdów itp. wycinka zieleni wysokiej oraz krzewów kolidujących z inwestycją. (Polish)
0 references
The subject of the project is to carry out construction works on the district road No 2121K on the section approx. 2552 to 5 312 km consisting of the construction of a walking path. The scope of the project includes the construction of a bicycle path, a walkway, a bicycle path, a left-hand side road with a width, the construction of platform bays and bus stops, construction of slopes fortification, construction of drainage along with drainage, reconstruction of short sections of the road surface and reconstruction of ditches and descents, construction of street lighting and all accompanying works. Estimated number of works: construction of a bicycle path on a length of 187.1 m construction of a pedestrian track on a length of 2 444.6 m construction of sidewalks, platforms at stops at a length of 324.7 m construction and modernisation of street lighting on a length of 2 239.9 m modernisation of drainage in connection with the construction of bicycle infrastructure, including the construction of a rainwater system at a length of approx. 1 370.1 m extension of culverts under the district road, forced by the construction of bicycle infrastructure pcs. 2 construction of crossings through cycling and walking tracks in the place of existing exits demolition of conflicting fences, culverts, descents, etc. cutting of high greenery and bushes conflicting with the investment. (English)
21 October 2022
0 references
WOJ.: MAŁOPOLSKIE, POW.: krakowski
0 references
Identifiers
RPMP.04.05.01-12-0005/21
0 references