The use of renewable energy sources in the Commercial and Service Company “HDAP” Lankamer Sławomir (Q4419637): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: Setting new description)
(‎Changed label, description and/or aliases in en, and other parts)
label / enlabel / en
 
The use of renewable energy sources in the Commercial and Service Company “HDAP” Lankamer Sławomir
Property / summary
 
The project is aimed at increasing the use of renewable energy sources in the enterprise and is part of the energy transformation of the Lublin region’s economy. The aim of the project is to build a photovoltaic installation with a total capacity of 39.16kWp on a facility owned by the company. The project is also aimed at obtaining electricity from a renewable energy source, which is solar radiation and using it for the own needs of its activities. The installation with a capacity of 39.16 kWp will not be equipped with an energy storage, due to the constant higher use of electricity in the business. The panels will be installed on the south side of the roof of the building at ul. Industrial 19, located on plot no. ewid. 621 district 4, while the installation infrastructure, including the control system and its connection to the power grid, will be located in a separate room in the building, accessible from the ground floor. The generated energy will be used to power the plant’s network. The project will help to diversify energy sources, reduce fossil fuel consumption, reduce CO2 and dust emissions into the atmosphere. Installation of a photovoltaic installation will contribute to reducing the company’s problems related to the increase in electricity prices. The use of the potential of solar energy for the production of electricity will translate into the share of energy generated from renewable sources for the company’s own needs and will be part of the implementation of the EU climate and energy policy in the Lublin Voivodeship, including the objectives of the European Green Deal. (English)
Property / summary: The project is aimed at increasing the use of renewable energy sources in the enterprise and is part of the energy transformation of the Lublin region’s economy. The aim of the project is to build a photovoltaic installation with a total capacity of 39.16kWp on a facility owned by the company. The project is also aimed at obtaining electricity from a renewable energy source, which is solar radiation and using it for the own needs of its activities. The installation with a capacity of 39.16 kWp will not be equipped with an energy storage, due to the constant higher use of electricity in the business. The panels will be installed on the south side of the roof of the building at ul. Industrial 19, located on plot no. ewid. 621 district 4, while the installation infrastructure, including the control system and its connection to the power grid, will be located in a separate room in the building, accessible from the ground floor. The generated energy will be used to power the plant’s network. The project will help to diversify energy sources, reduce fossil fuel consumption, reduce CO2 and dust emissions into the atmosphere. Installation of a photovoltaic installation will contribute to reducing the company’s problems related to the increase in electricity prices. The use of the potential of solar energy for the production of electricity will translate into the share of energy generated from renewable sources for the company’s own needs and will be part of the implementation of the EU climate and energy policy in the Lublin Voivodeship, including the objectives of the European Green Deal. (English) / rank
 
Normal rank
Property / summary: The project is aimed at increasing the use of renewable energy sources in the enterprise and is part of the energy transformation of the Lublin region’s economy. The aim of the project is to build a photovoltaic installation with a total capacity of 39.16kWp on a facility owned by the company. The project is also aimed at obtaining electricity from a renewable energy source, which is solar radiation and using it for the own needs of its activities. The installation with a capacity of 39.16 kWp will not be equipped with an energy storage, due to the constant higher use of electricity in the business. The panels will be installed on the south side of the roof of the building at ul. Industrial 19, located on plot no. ewid. 621 district 4, while the installation infrastructure, including the control system and its connection to the power grid, will be located in a separate room in the building, accessible from the ground floor. The generated energy will be used to power the plant’s network. The project will help to diversify energy sources, reduce fossil fuel consumption, reduce CO2 and dust emissions into the atmosphere. Installation of a photovoltaic installation will contribute to reducing the company’s problems related to the increase in electricity prices. The use of the potential of solar energy for the production of electricity will translate into the share of energy generated from renewable sources for the company’s own needs and will be part of the implementation of the EU climate and energy policy in the Lublin Voivodeship, including the objectives of the European Green Deal. (English) / qualifier
 
point in time: 21 October 2022
Timestamp+2022-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 13:28, 21 October 2022

Project Q4419637 in Poland
Language Label Description Also known as
English
The use of renewable energy sources in the Commercial and Service Company “HDAP” Lankamer Sławomir
Project Q4419637 in Poland

    Statements

    0 references
    90,755.31 zloty
    0 references
    20,174.91 Euro
    0 references
    139,623.56 zloty
    0 references
    31,038.32 Euro
    0 references
    65.0 percent
    0 references
    1 September 2022
    0 references
    31 October 2023
    0 references
    FIRMA HANDLOWO - USŁUGOWA "HDAP" LANKAMER SŁAWOMIR
    0 references
    Realizacja projektu ma na celu zwiększenie wykorzystania odnawialnych źródeł energii w przedsiębiorstwie i jest elementem transformacji energetycznej gospodarki Lubelszczyzny. Celem projektu jest budowa instalacji fotowoltaicznej o łącznej mocy 39,16kWp na obiekcie stanowiącym własność firmy. Projekt ma również na celu pozyskanie energii elektrycznej z odnawialnego źródła energii jakim jest promieniowanie słoneczne i wykorzystanie jej na potrzeby własne prowadzonej działalności. Instalacja o mocy 39,16 kWp nie będzie wyposażona w magazyn energii, ze względu na stałe wyższe użycie energii elektrycznej w prowadzonej działalności gospodarczej. Panele zamontowane będą na południowej stronie dachu obiektu przy ul. Przemysłowej 19, zlokalizowanym na działce nr ewid. 621 obręb 4, natomiast infrastruktura instalacji, w tym system sterowania oraz przyłączenie jej do sieci energetycznej będzie zlokalizowane w wydzielonym pomieszczeniu w budynku, dostępnym z parteru. Wyprodukowana energia wykorzystywana zostanie do zasilenia sieci instalacji obiektu. Realizacja projektu przyczyni się do dywersyfikacji źródeł wytwarzania energii, ograniczania zużycia paliw kopalnych, ograniczenia emisji CO2 i pyłów do atmosfery. Montaż instalacji fotowoltaicznej przyczyni się do ograniczenia problemów firmy związanych ze wzrostem cen energii elektrycznej. Wykorzystanie potencjału energii słonecznej do produkcji energii elektrycznej przełoży się na udział energii wytwarzanej z odnawialnych źródeł na własne potrzeby firmy oraz stanowić będzie element realizacji polityki klimatyczno- energetycznej UE na terenie województwa lubelskiego, w tym realizacji celów Europejskiego Zielonego Ładu. (Polish)
    0 references
    The project is aimed at increasing the use of renewable energy sources in the enterprise and is part of the energy transformation of the Lublin region’s economy. The aim of the project is to build a photovoltaic installation with a total capacity of 39.16kWp on a facility owned by the company. The project is also aimed at obtaining electricity from a renewable energy source, which is solar radiation and using it for the own needs of its activities. The installation with a capacity of 39.16 kWp will not be equipped with an energy storage, due to the constant higher use of electricity in the business. The panels will be installed on the south side of the roof of the building at ul. Industrial 19, located on plot no. ewid. 621 district 4, while the installation infrastructure, including the control system and its connection to the power grid, will be located in a separate room in the building, accessible from the ground floor. The generated energy will be used to power the plant’s network. The project will help to diversify energy sources, reduce fossil fuel consumption, reduce CO2 and dust emissions into the atmosphere. Installation of a photovoltaic installation will contribute to reducing the company’s problems related to the increase in electricity prices. The use of the potential of solar energy for the production of electricity will translate into the share of energy generated from renewable sources for the company’s own needs and will be part of the implementation of the EU climate and energy policy in the Lublin Voivodeship, including the objectives of the European Green Deal. (English)
    21 October 2022
    0 references
    WOJ.: LUBELSKIE, POW.: opolski
    0 references
    0 references

    Identifiers

    RPLU.15.01.00-06-0183/22
    0 references