Performance of geothermal wells in Stargard — stage II (Q4416211): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in en: Setting new description) |
(Changed label, description and/or aliases in en, and other parts) |
||||||||||||||
label / en | label / en | ||||||||||||||
Performance of geothermal wells in Stargard — stage II | |||||||||||||||
Property / summary | |||||||||||||||
The substantive scope of the project provides: 1. Drilling of the directional operating hole “Stargard GT-8” to a depth of approx. 2 800 m (measured vertically), allowing the abstraction of thermal water in the amount of 200-250 m³/h at a temperature of approx. 90 OC. 2. Drilling of the directional injection hole “Stargard GT-9” to a depth of approx. 2 800 m, capable of injecting thermal water in the amount of 200-250 m³/h at a temperature of approx. 40 OC. 3. Laying down the required technological connections on parcels Nos 34, 4/28 and 4/102 owned by the applicant: — discharge pipelines of geothermal water, — power cables, medium and low voltage (0.4 and 15 kV), — telecommunication fiber optic, 4. Execution of works related to the installation of two heat pumps (planned — one absorbent pump and one compressor pump) with a total power of approx. 20 MW. 5. Functional combination of heat pumps with existing geothermal technological system. 6. Construction of heat pumps through the creation of a new building in the area of Dz. no. 34, owned by the investor. (English) | |||||||||||||||
Property / summary: The substantive scope of the project provides: 1. Drilling of the directional operating hole “Stargard GT-8” to a depth of approx. 2 800 m (measured vertically), allowing the abstraction of thermal water in the amount of 200-250 m³/h at a temperature of approx. 90 OC. 2. Drilling of the directional injection hole “Stargard GT-9” to a depth of approx. 2 800 m, capable of injecting thermal water in the amount of 200-250 m³/h at a temperature of approx. 40 OC. 3. Laying down the required technological connections on parcels Nos 34, 4/28 and 4/102 owned by the applicant: — discharge pipelines of geothermal water, — power cables, medium and low voltage (0.4 and 15 kV), — telecommunication fiber optic, 4. Execution of works related to the installation of two heat pumps (planned — one absorbent pump and one compressor pump) with a total power of approx. 20 MW. 5. Functional combination of heat pumps with existing geothermal technological system. 6. Construction of heat pumps through the creation of a new building in the area of Dz. no. 34, owned by the investor. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The substantive scope of the project provides: 1. Drilling of the directional operating hole “Stargard GT-8” to a depth of approx. 2 800 m (measured vertically), allowing the abstraction of thermal water in the amount of 200-250 m³/h at a temperature of approx. 90 OC. 2. Drilling of the directional injection hole “Stargard GT-9” to a depth of approx. 2 800 m, capable of injecting thermal water in the amount of 200-250 m³/h at a temperature of approx. 40 OC. 3. Laying down the required technological connections on parcels Nos 34, 4/28 and 4/102 owned by the applicant: — discharge pipelines of geothermal water, — power cables, medium and low voltage (0.4 and 15 kV), — telecommunication fiber optic, 4. Execution of works related to the installation of two heat pumps (planned — one absorbent pump and one compressor pump) with a total power of approx. 20 MW. 5. Functional combination of heat pumps with existing geothermal technological system. 6. Construction of heat pumps through the creation of a new building in the area of Dz. no. 34, owned by the investor. (English) / qualifier | |||||||||||||||
point in time: 21 October 2022
|
Revision as of 12:35, 21 October 2022
Project Q4416211 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Performance of geothermal wells in Stargard — stage II |
Project Q4416211 in Poland |
Statements
31,740,000.0 zloty
0 references
7,055,802.0 Euro
0 references
60,900,000.0 zloty
0 references
13,538,070.0 Euro
0 references
52.12 percent
0 references
1 January 2021
0 references
30 June 2023
0 references
"G-TERM ENERGY" SPÓŁKA Z OGRANICZONA ODPOWIEDZIALNOSCIA
0 references
Zakres rzeczowy projektu przewiduje: 1. Odwiercenie kierunkowego otworu eksploatacyjnego „Stargard GT-8” do głębokości ok. 2800 m (mierzonej w pionie), umożliwiającego pobór wody termalnej w ilości 200-250 m3/h o temperaturze ok. 90 OC. 2. Odwiercenie kierunkowego otworu zatłaczającego „Stargard GT-9” do głębokości ok. 2800 m, umożliwiającego zatłaczanie wody termalnej w ilości 200-250 m3/h o temperaturze ok. 40 OC. 3. Ułożenie wymaganych połączeń technologicznych na działkach o numerze 34, 4/28 oraz 4/102 będących własnością wnioskodawcy: - rurociągów tłocznych wody geotermalnej, - kabli energetycznych, średniego i niskiego napięcia (0,4 i 15 kV), - światłowodów telekomunikacyjnych, 4. Wykonanie prac związanych z instalacją dwóch pomp ciepła (planowane – jedna pompa absorbcyjna i jedna pompa sprężarkowa) o łącznej mocy ok. 20 MW. 5. Funkcjonalne połączenie pomp ciepła z istniejącym układem technologicznym geotermii. 6. Zabudowa pomp ciepła poprzez powstanie nowego budynku na terenie dz. nr 34, będącej własnością inwestora. (Polish)
0 references
The substantive scope of the project provides: 1. Drilling of the directional operating hole “Stargard GT-8” to a depth of approx. 2 800 m (measured vertically), allowing the abstraction of thermal water in the amount of 200-250 m³/h at a temperature of approx. 90 OC. 2. Drilling of the directional injection hole “Stargard GT-9” to a depth of approx. 2 800 m, capable of injecting thermal water in the amount of 200-250 m³/h at a temperature of approx. 40 OC. 3. Laying down the required technological connections on parcels Nos 34, 4/28 and 4/102 owned by the applicant: — discharge pipelines of geothermal water, — power cables, medium and low voltage (0.4 and 15 kV), — telecommunication fiber optic, 4. Execution of works related to the installation of two heat pumps (planned — one absorbent pump and one compressor pump) with a total power of approx. 20 MW. 5. Functional combination of heat pumps with existing geothermal technological system. 6. Construction of heat pumps through the creation of a new building in the area of Dz. no. 34, owned by the investor. (English)
21 October 2022
0 references
WOJ.: ZACHODNIOPOMORSKIE, POW.: stargardzki
0 references
Identifiers
POIS.01.01.01-00-0019/19
0 references