Construction of the Integrated Interchange Node Murowana Goślina. (Q134934): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: co-financing rate (P837): 85.0 percentage)
(‎Changed an Item: Import item from Poland)
Property / EU contributionProperty / EU contribution
809,269.95 Euro
Amount809,269.95 Euro
UnitEuro
749,586.29 Euro
Amount749,586.29 Euro
UnitEuro
Property / budgetProperty / budget
952,082.3 Euro
Amount952,082.3 Euro
UnitEuro
881,866.23 Euro
Amount881,866.23 Euro
UnitEuro
Property / location (string)
 
WOJ.: WIELKOPOLSKIE, POW.: poznański
Property / location (string): WOJ.: WIELKOPOLSKIE, POW.: poznański / rank
 
Normal rank
Property / priority axis
 
Property / priority axis: Energy / rank
 
Normal rank
Property / co-financing rate
 
85.0 percent
Amount85.0 percent
Unitpercent
Property / co-financing rate: 85.0 percent / rank
 
Normal rank

Revision as of 10:06, 21 October 2022

Project Q134934 in Poland
Language Label Description Also known as
English
Construction of the Integrated Interchange Node Murowana Goślina.
Project Q134934 in Poland

    Statements

    0 references
    3,371,958.14 zloty
    0 references
    749,586.29 Euro
    13 January 2020
    0 references
    3,967,009.59 zloty
    0 references
    881,866.23 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    11 May 2016
    0 references
    25 May 2018
    0 references
    GMINA MUROWANA GOŚLINA
    0 references
    Realizacja proj.przebiegać będzie w ramach 2 zad.: 1)Budowa zintegrowanego węzła przesiadkowego[ZWP]przy dworcu kolejowym w Murowanej Goślinie[MG]-11.05.2016-25.05.2018 -budowa parkingu P&R przy ul.Kolejowej w MG(m.in.37MP dla pojazdów os.,w tym 3 dla os.niepełnospr.,1 MP dla pojazdów typu mikrobus,100 MP dla rowerów-174m2zjazdy,drogi manewrowe i 3 chodniki z kostki beton.8cm z betonu asfaltowego,oświetlenie-9 pkt.świetlnych,kanalizacja deszczowa,kanalizacja deszczowa,pozostałe prace określ.w pkt.3.4-zad.1 wniosku) -budowa parkingu P&R przy ul.Szkolnej w MG(m.in.36MP dla pojazdów os.,w tym 2 dla os.niepełnospr.-462 m2,2 ciągi piesze,zabruk,zjazdy i drogi manewrowe z kostki beton.8 cm,oświetlenie-4 pkt.świetlne,pozostałe prace określ.w pkt.3.4-zad.1 wniosku) -przebudowa ul.Szkolnej w MG(przebudowa 3 skrzyżowań i ulicy-572mb z betonu asfaltowego,chodniki, infrastr.rowerowa (od ul.Rogozińskiej-90mb,od ul.Graszyńskiego-58,5mb),budowa parkinguP&R-30MP(w tym 2 dla niepełnospr.),zatoka autobusowa i zjazdy z kostki beton.8cm,oświetlenie-7pkt.świetlnych,kanalizacjabudowa nowego wylotu i nowego odcinka,remont istniejącej,podłączenie studzienek)-budowa infrastruktury rowerowej-ul.Gnieźnieńska w MG(dokument.proj.,infrastr.rowerowa-979m i zjazdy(przebudowa)z kostki bet.8cm,przedłużenie przepustu,pozostałe prace określ.w pkt.3.4-zad.1 wniosku)-nadzór budowlany-akt.studium 2) Działania informa.-promocyjne(zgodnie z pkt.3.4-zad.2 wniosku)-19.12.2017-22.05.2018 Benef.proj.:Gmina MG,Powiat Poznański,społ.lokalna Produkty(rok osiągn.2018): •Liczba[L.]wybudowanych ZWP–1 szt. •Całkowita dł.nowych lub przebud.linii komunikacji miejskiej-0,572km •L.wybudowanych obiektów[WO]„parkuj jedź”–3szt. •L.MP w WO„parkuj i jedź”–104szt. •L.MP dla os.niepełnospr.w WO„parkuj i jedź”–7szt. •L.WO„Bike&Ride”–1 szt. •L.stanowisk postojowych w WO„Bike&Ride”–100szt. •Dł.wybudowanyej infrastr. rowerow.–1,1275km •L.akcji i kampanii inform.-prom.–1szt. •L.nowych/zmoderniz.pkt.św.-20 szt. (Polish)
    0 references
    Implementation of the project will be carried out within the framework of 2 a.m.: 100 x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x xxxxxxxxxxxxxxxxxxxxt-174-2-174-2xxxxxt-174-174-2-3-xxxxxxxxxxxxxxxxxxxxxxxxxxxxxt-100xxxxt-174xxxtxxxxxxt.gm/mxxxxxxt-100-174-2xxxxxxx174-2-3-xxxx8-mms-r-ms-r-m-rms/mms/mms/mm/mm/mm/mxxxxxxt/mm/mm/mm/mm/mm/mm/mxxt-mm/mm/mm/mxxt/mm/mxxt/mmm/mmm/mmm/mmmm/mmm/mmm/mmm/mmm/mm/mm/mmm/mmmm/mm/mm/mm/xxxxxxxt/mm/mm/m/m/m/mm/mm/100/174/mm/mm/mmm/mmmmmmm/mmmmmmm/mmmmmmmmmmmmmm/mmmmmmmmmmmmmm/mmmmmmmmmmm-mm/mmmmmmmmmmm-mmmmmmmmmmmmmmmmmmmmmmmm-mmmmmmmmmmmmmmmmm-mm-m-m-cm-mm-mm-mm/mm/mmm-mm-mm-mm-mm-mm-cmm-cm-cmm-mmm-mm-mm-cmm/mmmmmm-mm-mm-cm/mm-cxm-cmm/mxm/mmmmm/mm-cmm/mmmphrm-mong-cmm/mmmmmmmmmmmmmmm-mong-cmmmm-mn-mmm-mm-mmm-m-mmm-mm-mm-mmmmmmmmmmmmmm-mmm-mm-mmm-mmmmmmmmm-mm-m-m-mmm-mm-m-m-mm-m-m-m-m-m-m-m-m-m-m-m-m-m-m-m-mm-m-m-m-m-m-mmm)-m-m-m-mxxxxxmmxxxxtxxxxxxxxxmmmxt-mmmxxxxxmmmxxxxtxxxxxxt-mmxxxxtxxxtxtxt-mxxxt-174-mxxxtxt-ms-ms-mxt-mxt-174xxxtxtxtxtxxxtxxtxxxxt-100xxxxxxt-174xxxt-2x3xxxxxt-mmxt-mmmxxxxxxxtxtxt-174xxxmxtxtxt-174xmxmxt-2xmxt-174xmxxxmxt-m3xxxxxxt-mmmxxxxxt-mmm-mmmxxxt-mmmxt-mmmxt-mmmxt-mmmxxxt-mmmxt-mmm)-mxt-174-mxt-mong-8 xerm-monger-9x3xt-9x3xt-4x3xt-4xt-3xt-4x3xt-4x1xt-mmmmmmm)-174-8-9x3-4x-1xt-3x8,9x3-4xxxt-1xxxt-3x8,9xx3x3x4x3x3-4xxxxxt-174-mmms-mong-ms-ms-ms-ms-ms-ms) of the xermixt-100-174-8 xerxt-2xt-3-8 xer-9xt-3x8,8-9x-3x3xxxx-4xxxxxt-174xxxxxxt-mmmphxxt-mxt-mxt-174xxxt-mmph-mmph-mxt-174xxxxxxxt-174xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx-100xxxxxxx174xxxxxxxxxxxxx2x3-8xxxx9x3xxx3xxxx9x3xx3xxxx-100xxxxxxxxxxxxx174-2x3xxxxx3xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx-100xxxx-174xxxxxxxxxxxxxx-174xxxxxxxxxxxx-174xxxxxxxxxt-2x3xxxxxxt-174xx-174xxxéxéxé-séxé désé désé-sénexé désé-2xéxé dé-séxé déséxé-174-174-2-3-8x-8-8-8-8-s-8-ms-s-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-se-ms-s-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-m-ms-ms-ms-m-m-m-ms-ms-ms-m-d-m-d-m-ms-sout-mph-m-m-ms-m-d— •Number[L.]built ZWP-1 pcs. •Total length of new or restructured public transport line-0.572 km •L.built facilities[WO]“park go”-3pcs. •L.MP in WO“park and drive”–104pcs. •L.MP for non-independence in WO“park and drive”–7pcs. •L.WO"Bike&Ride"–1 pcs. •L. parking stations in WO"Bike&Ride"–100pcs. •The longest built bicycle infrastr.–1.1275 km •L.action and campaign inform-prom.– 1pcs. •L.new/moderniz.St.-20 pcs. (English)
    21 October 2020
    0 references
    La mise en œuvre du projet s’effectuera dans le cadre des deux volets suivants: 1)Construction d’un hub de raccordement intégré [ZWP] à la gare ferroviaire de Murowana Goślino[MG]-11.05.2016-25.05.2018 — construction d’un parking P&R à ul.Kolejowa en MG (y compris 37MP pour les véhicules, dont 3 pour perp.,1 MP pour les véhicules à microbus, 100 MP pour les vélos-174 m² en descente, routes de manœuvre et 3 chaussées en béton de 8 cm en béton bitumineux, éclairage-9, égouts pluviaux, autres ouvrages visés au point.3.4-zad.1 de la demande) — construction du parking P&R à ul.Szkolna en MG (y compris 36MP pour les véhicules, dont 2 pour les personnes. incomplètement — 462 m², 2 sentiers pédestres,brucs, sorties et routes de manœuvre à partir de cubes en béton.8 cm,éclairage-4 points.light,autres travaux visés au point 3.4-zad.1 de la requête) -reconstruction de ul.Szkolna w MG (reconstruction de 3 intersections et 572mb de rue avec béton asphalté, promenades, infrastr.rowerowa (de Rogozińska-90mb,Graszyńskiego-58.5mb), construction d’une voiture Parkp&R-30MP(incluant 2 pour la partie-pr.), quai de bus et sorties du béton.8 cm cube,éclairage à 7 points.lumières,canalisationconstruction d’une nouvelle sortie et nouvelle section,rénovation de l’existant, connexion des puits)-construction de l’infrastructure cyclable-ul.Gnieznoska en MG(document.proj., infrastr.bike-979 m et sorties(reconstruction) du cube pari.8 cm, extension du ponceau,autres travaux tels que définis au point 3.4-zad.1 de la demande)-surveillance de la construction-act.studium 2) Activités d’information et de promotion (conformément aux points 3.4-zad.2 de la requête)-19.12.2017-22.05.2018 Benef.proj.: Municipalité de MG,Poviat Poznański,Produits locaux(année atteinte en 2018): •Nombre de [L.]construit ZWP-1 pcs. •Ligne totale de transport public neuve ou rénovée — 0,572 km •L.objets construits[WO]«park go»-3pcs. •L.MP dans WO «park and drive»-104pcs. •L.MP pour les personnes non complètes dans WO «park and drive»–7pcs. •L.WO «Bike &Ride»-1 pcs. •L. se trouve dans le «Bike &Ride» — 100pcs. •Pour infrastr. de vélo construit -1,1275 km •L.Action et campagne informent.-prom.-1pcs. •L.Nowe/Zmoderniz.para. St.-20 pcs. (French)
    2 December 2021
    0 references
    Die Durchführung des Projekts erfolgt in den beiden folgenden Bereichen: 1)Bau eines integrierten Verbindungsknotenpunktes [ZWP] am Bahnhof in Murowana Goślino[MG]-11.05.2016-25.05.2018 – Bau eines P&R-Parkplatzes bei ul.Kolejowa in MG (einschließlich 37MP für Fahrzeuge, davon 3 für Perp.,1 MP für Mikrobusfahrzeuge, 100 MP für Fahrräder-174 m² Downhills, Manövrierungsstraßen und 3 Betonpflaster,8 cm aus Asphaltbeton, Beleuchtung-9 Beleuchtung, Regenkanalisation, Regenkanalisation, sonstige unter Punkt.3.4-zad.1 des Antrags genannte Arbeiten) – Bau des Parkplatzes P&R bei ul.Szkolna in MG (einschließlich 36MP für Fahrzeuge, davon 2 für Personen unvollständig – 462 m²,2 Fußwege,bruk,Ausgänge und Manövrierstraßen aus Betonwürfeln.8 cm, Beleuchtung-4 Punkte.licht,andere Arbeiten gemäß Nummer 3.4-zad.1 der Anwendung) -Rekonstruktion von ul.Szkolna w MG (Bau von 3 Kreuzungen und 572mb Straße mit Asphaltbeton, Gehwege, infrastr.rowerowa (von Rogozińska-90mb,Graszyńskiego-58.5mb), Bau eines Autos Parkp&R-30MP(einschließlich 2 für Teil-pr.), Busbucht und Ausfahrten aus dem Beton.8 cm Würfel,Beleuchtung zu 7 Punkten.Lichter, KanalisationKonstruktion eines neuen Auslasses und neuer Abschnitt, Renovierung vorhanden, Anschluss von Brunnen)-Gebäude der Fahrradinfrastruktur-ul.Gnieznoska in MG (Dokument.proj., infrastr.bike-979 m und Ausfahrten(Rekonstruktion) aus dem Wette.8 cm Würfel, Erweiterung des culvert,other work gemäß Punkt 3.4-zad.1 des Antrags)-Bauaufsicht-act.studium 2) Information-promotionale Aktivitäten (gemäß Punkt 3.4-zad.2 des Antrags)-19.12.2017-22.05.2018 Benef.proj.: Gemeinde MG,Poviat Poznański,lokale Produkte(Jahr 2018 erreicht): •Anzahl der[L.] gebauten ZWP-1-Stücke. •Gesamte neue oder renovierte öffentliche Verkehrslinie – 0,572 km •L.built objects[WO]„park go“-3pcs. •L.MP in WO „Park und Antrieb“-104pcs. •L.MP für nicht-umfassende Personen in WO „Park und Antrieb“–7pcs. •L.WO „Bike&Ride“-1 Stk. •L. Parkplatz steht im „Bike&Ride“ – 100pcs. •Für gebautes Fahrrad infrastr. -1,1275 km •L.Action und Kampagne informieren.-prom.-1pcs. •L.Nowe/Zmoderniz.para. St. 20 St. (German)
    9 December 2021
    0 references
    De uitvoering van het project zal worden uitgevoerd in het kader van de volgende twee onderdelen: 1)Bouw van een geïntegreerde verbindingshub [ZWP] op het station in Murowana Goślino[MG]-11.05.2016-25.05.2018 — bouw van een P&R-parkeerplaats te ul.Kolejowa in MG (inclusief 37MP voor voertuigen, waarvan 3 voor perp.,1 MP voor microbusvoertuigen, 100 MP voor fietsen-174 m² bergafwaarts, manoeuvreerwegen en 3 bestratings van beton, 8 cm van asfaltbeton, verlichting-9 verlichting, regen riolering, regen riolering, andere in punt.3.4-zad.1 van de aanvraag genoemde werken) — aanleg van de parkeerplaats P&R te ul.Szkolna in MG (inclusief 36MP voor voertuigen, waarvan 2 voor personen. onvolledig — 462 m², 2 voetpaden, borstel, uitgangen en manoeuvreerwegen uit betonblokjes.8 cm,verlichting-4 point.light,andere werken vermeld in punt 3.4-zad.1 van de aanvraag) — wederopbouw van ul.Szkolna w MG (heropbouw van 3 kruispunten en 572mb straat met asfaltbeton, wandelingen, infrastr.rowerowa (van Rogozińska-90mb,Graszyńskiego-58.5mb), bouw van een auto Parkp&R-30MP(inclusief 2 voor part-pr.), bus baai en uitgangen van de betonnen 8 cm kubus, verlichting tot 7 points.lights,canalizationconstructie van een nieuwe uitlaat en nieuwe sectie, renovatie van bestaande, aansluiting van putten)-bouw van de fiets infrastructuur-ul.Gnieznoska in MG(document.proj., infrastr.bike-979 m en uitgangen(herbouw) van de bet.8 cm kubus, uitbreiding van de culvert,andere werkzaamheden zoals gedefinieerd in punt 3.4-zad.1 van de aanvraag)-bouwtoezicht-act.studium 2) Informatie-promotieactiviteiten (volgens de punten 3.4-zad.2 van de aanvraag)-19.12.2017-22.05.2018 Benef.proj.: Gemeente MG,Poviat Poznański,lokale producten (jaar bereikt 2018): •Aantal van [L.] gebouwde ZWP-1 PCs. •Totaal nieuw of gerenoveerd openbaar vervoer lijn — 0,572 km • L.built objecten[WO]„park go”-3pcs. • L.MP in WO „park en aandrijving”-104pcs. • L.MP voor niet-uitgebreide personen in WO „park and drive” -7pcs. •L.WO „Bike&Ride”-1 stuks. •L. parkeren staat in de „Bike&Ride” — 100pcs. •Voor gebouwde fietsinfrastr. -1,1275 km • L.Action en campagne informeren.-prom.-1pcs. •L.Nowe/Zmoderniz.para. St.-20 stuks. (Dutch)
    17 December 2021
    0 references
    L'attuazione del progetto sarà effettuata nell'ambito dei seguenti due filoni: 1)Costruzione di un hub di collegamento integrato [ZWP] presso la stazione ferroviaria di Murowana Goślino[MG]-11.05.2016-25.05.2018 — costruzione di un parcheggio P&R a ul.Kolejowa in MG (di cui 37MP per i veicoli, di cui 3 per il perp., 1 MP per i veicoli a microbus, 100 MP per biciclette-174 m² in discesa, strade di manovra e 3 marciapiedi di cemento.8 cm in cemento armato, illuminazione-9 illuminazione, fognature piovane, fognature antipioggia, altre opere specificate al punto.3.4-zad.1 dell'applicazione) — costruzione del parcheggio P&R a ul.Szkolna in MG (incluso 36MP per veicoli, di cui 2 per persone. incompletamente — 462 m²,2 sentieri, la ricostruzione di ul.Szkolna w MG (ricostruzione di 3 intersezioni e 572mb strada con cemento asfalto, passeggiate, infrastr.rowerowa (da Rogozińska-90mb,Graszyńskiego-58.5mb), costruzione di una macchina Parkp&R-30MP (di cui 2 per parte-pr.), baia di autobus e uscite dal cubo di cemento.8 cm, illuminazione a 7 punti.lights,canalizzazionecostruzione di un nuovo sbocco e nuova sezione,ristrutturazione di esistenti,collegamento di pozzi)-costruzione di infrastrutture di biciclette-ul.Gnieznoska in MG(document.proj., infrastr.bike-979 m e uscite(ricostruzione) dalla bet.8 cm cubo, estensione del culvert, altri lavori come definiti al punto 3.4-zad.1 dell'applicazione)-costruzione supervisione-act.studium 2) Attività di informazione-promozione (secondo i punti 3.4-zad.2 della domanda)-19.12.2017-22.05.2018 Benef.proj.: Comune di MG,Poviat Poznański,Prodotti locali (anno raggiunto 2018): •Numero di [L.]costruito ZWP-1 pc. •Totale linea di trasporto pubblico nuovo o ristrutturato — 0,572 km •L. built oggetti[WO]"parco andare"-3pcs. •L.MP in WO "parco e azionamento"-104pcs. •L.MP per le persone non complete in WO "parcheggio e guida"–7pcs. •L.WO "Bike&Ride"-1 pc. •L. parcheggio si trova nella "Bike&Ride" — 100pcs. •Per biciclette costruite infrastr. -1,1275 km •L.Action e campagna inform.-prom.-1pcs. •L.Nowe/Zmoderniz.para. St.-20 pz. (Italian)
    15 January 2022
    0 references
    La ejecución del proyecto se llevará a cabo en los dos capítulos siguientes: 1)Construcción de un centro de conexión integrado [ZWP] en la estación ferroviaria de Murowana Goślino[MG]-11.05.2016-25.05.2018 — construcción de un aparcamiento P&R en ul.Kolejowa en MG (incluidos 37MP para vehículos, incluidos 3 para perp., 1 MP para vehículos de microbus, 100 MP para bicicletas-174 m² cuesta abajo, carreteras de maniobra y 3 pavimentos de hormigón.8 cm de hormigón asfaltado, iluminación-9, alcantarillado pluvial, alcantarillado pluvial, otras obras especificadas en el punto.3.4-zad.1 de la aplicación) — construcción del estacionamiento P&R en ul.Szkolna en MG (incluidos 36MP para vehículos, de los cuales 2 para personas. incompleto — 462 m², 2 senderos, bruk, salidas y maniobras de carreteras de cubos de hormigón.8 cm, iluminación-4 puntos.luz,otras obras especificadas en el punto 3.4-zad.1 de la aplicación) -reconstrucción de ul.Szkolna w MG (reconstrucción de 3 intersecciones y 572 m de calle con asfalto de hormigón, paseos, infrastr.rowerowa (de Rogozińska-90mb, Graszyńskiego-58.5mb), construcción de un coche Parkp&R-30MP (incluyendo 2 para parte-pr.), la bahía de autobuses y salidas del cubo de hormigón.8 cm, iluminación a 7 puntos.luces,canalizaciónconstrucción de una nueva salida y nueva sección, renovación de existente, conexión de pozos) — construcción de la infraestructura de bicicletas-ul.Gnieznoska en MG(document.proj., infrastr.bike-979 m y salidas (reconstrucción) del cubo de bet.8 cm, ampliación de la alcantarilla,otras obras definidas en el punto 3.4-zad.1 de la solicitud)-supervisión de la construcción-act.studium 2) Actividades de promoción de la información (según los puntos 3.4-zad.2 de la solicitud)-19.12.2017-22.05.2018 Benef.proj.: Municipio de MG,Poviat Poznański,local Products(año alcanzado 2018): •Número de unidades ZWP-1 construidas. •Total línea de transporte público nueva o reformada — 0,572 km •L.objetos construidos[WO]«park go»-3pcs. • L.MP en WO «parque y unidad»-104pcs. •L.MP para personas no integrales en WO «park and drive»–7pcs. • L.WO «Bike&Ride»-1 PC. •L. puestos de estacionamiento en el «Bike&Ride» — 100pcs. •Para bicicletas construidas infrastr. -1,1275 km •L.Acción e información de campaña.-prom.-1pcs. • L.Nowe/Zmoderniz.para. St.-20 PC. (Spanish)
    18 January 2022
    0 references
    Gennemførelsen af projektet vil blive gennemført inden for rammerne af kl. 2:00: 100 x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x xxxxxxxxxxxxxxxxxxxxt-174-2-174-2xxxxxt-174-174-2-3-xxxxxxxxxxxxxxxxxxxxxxxxxxxxxt-100xxxxt-174xxxtxxxxxxt.gm/mxxxxxxt-100-174-2xxxxxxx174-2-3-xxxx8-mms-r-ms-r-m-rms/mms/mms/mm/mm/mm/mxxxxxxt/mm/mm/mm/mm/mm/mm/mxxt-mm/mm/mm/mxxt/mm/mxxt/mmm/mmm/mmm/mmmm/mmm/mmm/mmm/mmm/mm/mm/mmm/mmmm/mm/mm/mm/xxxxxxxt/mm/mm/m/m/m/mm/mm/100/174/mm/mm/mmm/mmmmmmm/mmmmmmm/mmmmmmmmmmmmmm/mmmmmmmmmmmmmm/mmmmmmmmmmm-mm/mmmmmmmmmmm-mmmmmmmmmmmmmmmmmmmmmmmm-mmmmmmmmmmmmmmmmm-mm-m-m-cm-mm-mm-mm/mm/mmm-mm-mm-mm-mm-mm-cmm-cm-cmm-mmm-mm-mm-cmm/mmmmmm-mm-mm-cm/mm-cxm-cmm/mxm/mmmmm/mm-cmm/mmmphrm-mong-cmm/mmmmmmmmmmmmmmm-mong-cmmmm-mn-mmm-mm-mmm-m-mmm-mm-mm-mmmmmmmmmmmmmm-mmm-mm-mmm-mmmmmmmmm-mm-m-m-mmm-mm-m-m-mm-m-m-m-m-m-m-m-m-m-m-m-m-m-m-m-mm-m-m-m-m-m-mmm)-m-m-m-mxxxxxmmxxxxtxxxxxxxxxmmmxt-mmmxxxxxmmmxxxxtxxxxxxt-mmxxxxtxxxtxtxt-mxxxt-174-mxxxtxt-ms-ms-mxt-mxt-174xxxtxtxtxtxxxtxxtxxxxt-100xxxxxxt-174xxxt-2x3xxxxxt-mmxt-mmmxxxxxxxtxtxt-174xxxmxtxtxt-174xmxmxt-2xmxt-174xmxxxmxt-m3xxxxxxt-mmmxxxxxt-mmm-mmmxxxt-mmmxt-mmmxt-mmmxt-mmmxxxt-mmmxt-mmm)-mxt-174-mxt-mong-8 xerm-monger-9x3xt-9x3xt-4x3xt-4xt-3xt-4x3xt-4x1xt-mmmmmmm)-174-8-9x3-4x-1xt-3x8,9x3-4xxxt-1xxxt-3x8,9xx3x3x4x3x3-4xxxxxt-174-mmms-mong-ms-ms-ms-ms-ms-ms) of the xermixt-100-174-8 xerxt-2xt-3-8 xer-9xt-3x8,8-9x-3x3xxxx-4xxxxxt-174xxxxxxt-mmmphxxt-mxt-mxt-174xxxt-mmph-mmph-mxt-174xxxxxxxt-174xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx-100xxxxxxx174xxxxxxxxxxxxx2x3-8xxxx9x3xxx3xxxx9x3xx3xxxx-100xxxxxxxxxxxxx174-2x3xxxxx3xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx-100xxxx-174xxxxxxxxxxxxxx-174xxxxxxxxxxxx-174xxxxxxxxxt-2x3xxxxxxt-174xx-174xxxéxéxé-séxé désé désé-sénexé désé-2xéxé dé-séxé déséxé-174-174-2-3-8x-8-8-8-8-s-8-ms-s-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-se-ms-s-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-m-ms-ms-ms-m-m-m-ms-ms-ms-m-d-m-d-m-ms-sout-mph-m-m-ms-m-d— •Number[L.]built ZWP-1 pcs. •Total length of new or restructured public transport line-0.572 km •L.built facilities[WO]“park go”-3pcs. •L.MP in WO“park and drive”–104pcs. •L.MP for non-independence in WO“park and drive”–7pcs. •L.WO"Bike&Ride"–1 pcs. •L. parking stations in WO"Bike&Ride"–100pcs. •The longest built bicycle infrastr.–1.1275 km •L.action and campaign inform-prom.– 1pcs. •L.new/moderniz.St.-20 pcs. (Danish)
    2 July 2022
    0 references
    Η υλοποίηση του έργου θα πραγματοποιηθεί στο πλαίσιο των 2 π.μ.: 100 x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x xxxxxxxxxxxxxxxxxxxxt-174-2-174-2xxxxxt-174-174-2-3-xxxxxxxxxxxxxxxxxxxxxxxxxxxxxt-100xxxxt-174xxxtxxxxxxt.gm/mxxxxxxt-100-174-2xxxxxxx174-2-3-xxxx8-mms-r-ms-r-m-rms/mms/mms/mm/mm/mm/mxxxxxxt/mm/mm/mm/mm/mm/mm/mxxt-mm/mm/mm/mxxt/mm/mxxt/mmm/mmm/mmm/mmmm/mmm/mmm/mmm/mmm/mm/mm/mmm/mmmm/mm/mm/mm/xxxxxxxt/mm/mm/m/m/m/mm/mm/100/174/mm/mm/mmm/mmmmmmm/mmmmmmm/mmmmmmmmmmmmmm/mmmmmmmmmmmmmm/mmmmmmmmmmm-mm/mmmmmmmmmmm-mmmmmmmmmmmmmmmmmmmmmmmm-mmmmmmmmmmmmmmmmm-mm-m-m-cm-mm-mm-mm/mm/mmm-mm-mm-mm-mm-mm-cmm-cm-cmm-mmm-mm-mm-cmm/mmmmmm-mm-mm-cm/mm-cxm-cmm/mxm/mmmmm/mm-cmm/mmmphrm-mong-cmm/mmmmmmmmmmmmmmm-mong-cmmmm-mn-mmm-mm-mmm-m-mmm-mm-mm-mmmmmmmmmmmmmm-mmm-mm-mmm-mmmmmmmmm-mm-m-m-mmm-mm-m-m-mm-m-m-m-m-m-m-m-m-m-m-m-m-m-m-m-mm-m-m-m-m-m-mmm)-m-m-m-mxxxxxmmxxxxtxxxxxxxxxmmmxt-mmmxxxxxmmmxxxxtxxxxxxt-mmxxxxtxxxtxtxt-mxxxt-174-mxxxtxt-ms-ms-mxt-mxt-174xxxtxtxtxtxxxtxxtxxxxt-100xxxxxxt-174xxxt-2x3xxxxxt-mmxt-mmmxxxxxxxtxtxt-174xxxmxtxtxt-174xmxmxt-2xmxt-174xmxxxmxt-m3xxxxxxt-mmmxxxxxt-mmm-mmmxxxt-mmmxt-mmmxt-mmmxt-mmmxxxt-mmmxt-mmm)-mxt-174-mxt-mong-8 xerm-monger-9x3xt-9x3xt-4x3xt-4xt-3xt-4x3xt-4x1xt-mmmmmmm)-174-8-9x3-4x-1xt-3x8,9x3-4xxxt-1xxxt-3x8,9xx3x3x4x3x3-4xxxxxt-174-mmms-mong-ms-ms-ms-ms-ms-ms) of the xermixt-100-174-8 xerxt-2xt-3-8 xer-9xt-3x8,8-9x-3x3xxxx-4xxxxxt-174xxxxxxt-mmmphxxt-mxt-mxt-174xxxt-mmph-mmph-mxt-174xxxxxxxt-174xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx-100xxxxxxx174xxxxxxxxxxxxx2x3-8xxxx9x3xxx3xxxx9x3xx3xxxx-100xxxxxxxxxxxxx174-2x3xxxxx3xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx-100xxxx-174xxxxxxxxxxxxxx-174xxxxxxxxxxxx-174xxxxxxxxxt-2x3xxxxxxt-174xx-174xxxéxéxé-séxé désé désé-sénexé désé-2xéxé dé-séxé déséxé-174-174-2-3-8x-8-8-8-8-s-8-ms-s-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-se-ms-s-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-m-ms-ms-ms-m-m-m-ms-ms-ms-m-d-m-d-m-ms-sout-mph-m-m-ms-m-d— •Number[L.]built ZWP-1 pcs. •Total length of new or restructured public transport line-0.572 km •L.built facilities[WO]“park go”-3pcs. •L.MP in WO“park and drive”–104pcs. •L.MP for non-independence in WO“park and drive”–7pcs. •L.WO"Bike&Ride"–1 pcs. •L. parking stations in WO"Bike&Ride"–100pcs. •The longest built bicycle infrastr.–1.1275 km •L.action and campaign inform-prom.– 1pcs. •L.new/moderniz.St.-20 pcs. (Greek)
    2 July 2022
    0 references
    Provedba projekta provodit će se u okviru 2:00 sati: 100 x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x xxxxxxxxxxxxxxxxxxxxt-174-2-174-2xxxxxt-174-174-2-3-xxxxxxxxxxxxxxxxxxxxxxxxxxxxxt-100xxxxt-174xxxtxxxxxxt.gm/mxxxxxxt-100-174-2xxxxxxx174-2-3-xxxx8-mms-r-ms-r-m-rms/mms/mms/mm/mm/mm/mxxxxxxt/mm/mm/mm/mm/mm/mm/mxxt-mm/mm/mm/mxxt/mm/mxxt/mmm/mmm/mmm/mmmm/mmm/mmm/mmm/mmm/mm/mm/mmm/mmmm/mm/mm/mm/xxxxxxxt/mm/mm/m/m/m/mm/mm/100/174/mm/mm/mmm/mmmmmmm/mmmmmmm/mmmmmmmmmmmmmm/mmmmmmmmmmmmmm/mmmmmmmmmmm-mm/mmmmmmmmmmm-mmmmmmmmmmmmmmmmmmmmmmmm-mmmmmmmmmmmmmmmmm-mm-m-m-cm-mm-mm-mm/mm/mmm-mm-mm-mm-mm-mm-cmm-cm-cmm-mmm-mm-mm-cmm/mmmmmm-mm-mm-cm/mm-cxm-cmm/mxm/mmmmm/mm-cmm/mmmphrm-mong-cmm/mmmmmmmmmmmmmmm-mong-cmmmm-mn-mmm-mm-mmm-m-mmm-mm-mm-mmmmmmmmmmmmmm-mmm-mm-mmm-mmmmmmmmm-mm-m-m-mmm-mm-m-m-mm-m-m-m-m-m-m-m-m-m-m-m-m-m-m-m-mm-m-m-m-m-m-mmm)-m-m-m-mxxxxxmmxxxxtxxxxxxxxxmmmxt-mmmxxxxxmmmxxxxtxxxxxxt-mmxxxxtxxxtxtxt-mxxxt-174-mxxxtxt-ms-ms-mxt-mxt-174xxxtxtxtxtxxxtxxtxxxxt-100xxxxxxt-174xxxt-2x3xxxxxt-mmxt-mmmxxxxxxxtxtxt-174xxxmxtxtxt-174xmxmxt-2xmxt-174xmxxxmxt-m3xxxxxxt-mmmxxxxxt-mmm-mmmxxxt-mmmxt-mmmxt-mmmxt-mmmxxxt-mmmxt-mmm)-mxt-174-mxt-mong-8 xerm-monger-9x3xt-9x3xt-4x3xt-4xt-3xt-4x3xt-4x1xt-mmmmmmm)-174-8-9x3-4x-1xt-3x8,9x3-4xxxt-1xxxt-3x8,9xx3x3x4x3x3-4xxxxxt-174-mmms-mong-ms-ms-ms-ms-ms-ms) of the xermixt-100-174-8 xerxt-2xt-3-8 xer-9xt-3x8,8-9x-3x3xxxx-4xxxxxt-174xxxxxxt-mmmphxxt-mxt-mxt-174xxxt-mmph-mmph-mxt-174xxxxxxxt-174xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx-100xxxxxxx174xxxxxxxxxxxxx2x3-8xxxx9x3xxx3xxxx9x3xx3xxxx-100xxxxxxxxxxxxx174-2x3xxxxx3xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx-100xxxx-174xxxxxxxxxxxxxx-174xxxxxxxxxxxx-174xxxxxxxxxt-2x3xxxxxxt-174xx-174xxxéxéxé-séxé désé désé-sénexé désé-2xéxé dé-séxé déséxé-174-174-2-3-8x-8-8-8-8-s-8-ms-s-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-se-ms-s-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-m-ms-ms-ms-m-m-m-ms-ms-ms-m-d-m-d-m-ms-sout-mph-m-m-ms-m-d— •Number[L.]built ZWP-1 pcs. •Total length of new or restructured public transport line-0.572 km •L.built facilities[WO]“park go”-3pcs. •L.MP in WO“park and drive”–104pcs. •L.MP for non-independence in WO“park and drive”–7pcs. •L.WO"Bike&Ride"–1 pcs. •L. parking stations in WO"Bike&Ride"–100pcs. •The longest built bicycle infrastr.–1.1275 km •L.action and campaign inform-prom.– 1pcs. •L.new/moderniz.St.-20 pcs. (Croatian)
    2 July 2022
    0 references
    Punerea în aplicare a proiectului se va realiza în cadrul orei 2:00: 100 x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x xxxxxxxxxxxxxxxxxxxxt-174-2-174-2xxxxxt-174-174-2-3-xxxxxxxxxxxxxxxxxxxxxxxxxxxxxt-100xxxxt-174xxxtxxxxxxt.gm/mxxxxxxt-100-174-2xxxxxxx174-2-3-xxxx8-mms-r-ms-r-m-rms/mms/mms/mm/mm/mm/mxxxxxxt/mm/mm/mm/mm/mm/mm/mxxt-mm/mm/mm/mxxt/mm/mxxt/mmm/mmm/mmm/mmmm/mmm/mmm/mmm/mmm/mm/mm/mmm/mmmm/mm/mm/mm/xxxxxxxt/mm/mm/m/m/m/mm/mm/100/174/mm/mm/mmm/mmmmmmm/mmmmmmm/mmmmmmmmmmmmmm/mmmmmmmmmmmmmm/mmmmmmmmmmm-mm/mmmmmmmmmmm-mmmmmmmmmmmmmmmmmmmmmmmm-mmmmmmmmmmmmmmmmm-mm-m-m-cm-mm-mm-mm/mm/mmm-mm-mm-mm-mm-mm-cmm-cm-cmm-mmm-mm-mm-cmm/mmmmmm-mm-mm-cm/mm-cxm-cmm/mxm/mmmmm/mm-cmm/mmmphrm-mong-cmm/mmmmmmmmmmmmmmm-mong-cmmmm-mn-mmm-mm-mmm-m-mmm-mm-mm-mmmmmmmmmmmmmm-mmm-mm-mmm-mmmmmmmmm-mm-m-m-mmm-mm-m-m-mm-m-m-m-m-m-m-m-m-m-m-m-m-m-m-m-mm-m-m-m-m-m-mmm)-m-m-m-mxxxxxmmxxxxtxxxxxxxxxmmmxt-mmmxxxxxmmmxxxxtxxxxxxt-mmxxxxtxxxtxtxt-mxxxt-174-mxxxtxt-ms-ms-mxt-mxt-174xxxtxtxtxtxxxtxxtxxxxt-100xxxxxxt-174xxxt-2x3xxxxxt-mmxt-mmmxxxxxxxtxtxt-174xxxmxtxtxt-174xmxmxt-2xmxt-174xmxxxmxt-m3xxxxxxt-mmmxxxxxt-mmm-mmmxxxt-mmmxt-mmmxt-mmmxt-mmmxxxt-mmmxt-mmm)-mxt-174-mxt-mong-8 xerm-monger-9x3xt-9x3xt-4x3xt-4xt-3xt-4x3xt-4x1xt-mmmmmmm)-174-8-9x3-4x-1xt-3x8,9x3-4xxxt-1xxxt-3x8,9xx3x3x4x3x3-4xxxxxt-174-mmms-mong-ms-ms-ms-ms-ms-ms) of the xermixt-100-174-8 xerxt-2xt-3-8 xer-9xt-3x8,8-9x-3x3xxxx-4xxxxxt-174xxxxxxt-mmmphxxt-mxt-mxt-174xxxt-mmph-mmph-mxt-174xxxxxxxt-174xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx-100xxxxxxx174xxxxxxxxxxxxx2x3-8xxxx9x3xxx3xxxx9x3xx3xxxx-100xxxxxxxxxxxxx174-2x3xxxxx3xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx-100xxxx-174xxxxxxxxxxxxxx-174xxxxxxxxxxxx-174xxxxxxxxxt-2x3xxxxxxt-174xx-174xxxéxéxé-séxé désé désé-sénexé désé-2xéxé dé-séxé déséxé-174-174-2-3-8x-8-8-8-8-s-8-ms-s-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-se-ms-s-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-m-ms-ms-ms-m-m-m-ms-ms-ms-m-d-m-d-m-ms-sout-mph-m-m-ms-m-d— •Number[L.]built ZWP-1 pcs. •Total length of new or restructured public transport line-0.572 km •L.built facilities[WO]“park go”-3pcs. •L.MP in WO“park and drive”–104pcs. •L.MP for non-independence in WO“park and drive”–7pcs. •L.WO"Bike&Ride"–1 pcs. •L. parking stations in WO"Bike&Ride"–100pcs. •The longest built bicycle infrastr.–1.1275 km •L.action and campaign inform-prom.– 1pcs. •L.new/moderniz.St.-20 pcs. (Romanian)
    2 July 2022
    0 references
    Realizácia projektu sa uskutoční v rámci 2.00 hod.: 100 x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x xxxxxxxxxxxxxxxxxxxxt-174-2-174-2xxxxxt-174-174-2-3-xxxxxxxxxxxxxxxxxxxxxxxxxxxxxt-100xxxxt-174xxxtxxxxxxt.gm/mxxxxxxt-100-174-2xxxxxxx174-2-3-xxxx8-mms-r-ms-r-m-rms/mms/mms/mm/mm/mm/mxxxxxxt/mm/mm/mm/mm/mm/mm/mxxt-mm/mm/mm/mxxt/mm/mxxt/mmm/mmm/mmm/mmmm/mmm/mmm/mmm/mmm/mm/mm/mmm/mmmm/mm/mm/mm/xxxxxxxt/mm/mm/m/m/m/mm/mm/100/174/mm/mm/mmm/mmmmmmm/mmmmmmm/mmmmmmmmmmmmmm/mmmmmmmmmmmmmm/mmmmmmmmmmm-mm/mmmmmmmmmmm-mmmmmmmmmmmmmmmmmmmmmmmm-mmmmmmmmmmmmmmmmm-mm-m-m-cm-mm-mm-mm/mm/mmm-mm-mm-mm-mm-mm-cmm-cm-cmm-mmm-mm-mm-cmm/mmmmmm-mm-mm-cm/mm-cxm-cmm/mxm/mmmmm/mm-cmm/mmmphrm-mong-cmm/mmmmmmmmmmmmmmm-mong-cmmmm-mn-mmm-mm-mmm-m-mmm-mm-mm-mmmmmmmmmmmmmm-mmm-mm-mmm-mmmmmmmmm-mm-m-m-mmm-mm-m-m-mm-m-m-m-m-m-m-m-m-m-m-m-m-m-m-m-mm-m-m-m-m-m-mmm)-m-m-m-mxxxxxmmxxxxtxxxxxxxxxmmmxt-mmmxxxxxmmmxxxxtxxxxxxt-mmxxxxtxxxtxtxt-mxxxt-174-mxxxtxt-ms-ms-mxt-mxt-174xxxtxtxtxtxxxtxxtxxxxt-100xxxxxxt-174xxxt-2x3xxxxxt-mmxt-mmmxxxxxxxtxtxt-174xxxmxtxtxt-174xmxmxt-2xmxt-174xmxxxmxt-m3xxxxxxt-mmmxxxxxt-mmm-mmmxxxt-mmmxt-mmmxt-mmmxt-mmmxxxt-mmmxt-mmm)-mxt-174-mxt-mong-8 xerm-monger-9x3xt-9x3xt-4x3xt-4xt-3xt-4x3xt-4x1xt-mmmmmmm)-174-8-9x3-4x-1xt-3x8,9x3-4xxxt-1xxxt-3x8,9xx3x3x4x3x3-4xxxxxt-174-mmms-mong-ms-ms-ms-ms-ms-ms) of the xermixt-100-174-8 xerxt-2xt-3-8 xer-9xt-3x8,8-9x-3x3xxxx-4xxxxxt-174xxxxxxt-mmmphxxt-mxt-mxt-174xxxt-mmph-mmph-mxt-174xxxxxxxt-174xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx-100xxxxxxx174xxxxxxxxxxxxx2x3-8xxxx9x3xxx3xxxx9x3xx3xxxx-100xxxxxxxxxxxxx174-2x3xxxxx3xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx-100xxxx-174xxxxxxxxxxxxxx-174xxxxxxxxxxxx-174xxxxxxxxxt-2x3xxxxxxt-174xx-174xxxéxéxé-séxé désé désé-sénexé désé-2xéxé dé-séxé déséxé-174-174-2-3-8x-8-8-8-8-s-8-ms-s-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-se-ms-s-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-m-ms-ms-ms-m-m-m-ms-ms-ms-m-d-m-d-m-ms-sout-mph-m-m-ms-m-d— •Number[L.]built ZWP-1 pcs. •Total length of new or restructured public transport line-0.572 km •L.built facilities[WO]“park go”-3pcs. •L.MP in WO“park and drive”–104pcs. •L.MP for non-independence in WO“park and drive”–7pcs. •L.WO"Bike&Ride"–1 pcs. •L. parking stations in WO"Bike&Ride"–100pcs. •The longest built bicycle infrastr.–1.1275 km •L.action and campaign inform-prom.– 1pcs. •L.new/moderniz.St.-20 pcs. (Slovak)
    2 July 2022
    0 references
    L-implimentazzjoni tal-proġett ser titwettaq fil-qafas tas-2 a.m.: 100 x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x xxxxxxxxxxxxxxxxxxxxt-174-2-174-2xxxxxt-174-174-2-3-xxxxxxxxxxxxxxxxxxxxxxxxxxxxxt-100xxxxt-174xxxtxxxxxxt.gm/mxxxxxxt-100-174-2xxxxxxx174-2-3-xxxx8-mms-r-ms-r-m-rms/mms/mms/mm/mm/mm/mxxxxxxt/mm/mm/mm/mm/mm/mm/mxxt-mm/mm/mm/mxxt/mm/mxxt/mmm/mmm/mmm/mmmm/mmm/mmm/mmm/mmm/mm/mm/mmm/mmmm/mm/mm/mm/xxxxxxxt/mm/mm/m/m/m/mm/mm/100/174/mm/mm/mmm/mmmmmmm/mmmmmmm/mmmmmmmmmmmmmm/mmmmmmmmmmmmmm/mmmmmmmmmmm-mm/mmmmmmmmmmm-mmmmmmmmmmmmmmmmmmmmmmmm-mmmmmmmmmmmmmmmmm-mm-m-m-cm-mm-mm-mm/mm/mmm-mm-mm-mm-mm-mm-cmm-cm-cmm-mmm-mm-mm-cmm/mmmmmm-mm-mm-cm/mm-cxm-cmm/mxm/mmmmm/mm-cmm/mmmphrm-mong-cmm/mmmmmmmmmmmmmmm-mong-cmmmm-mn-mmm-mm-mmm-m-mmm-mm-mm-mmmmmmmmmmmmmm-mmm-mm-mmm-mmmmmmmmm-mm-m-m-mmm-mm-m-m-mm-m-m-m-m-m-m-m-m-m-m-m-m-m-m-m-mm-m-m-m-m-m-mmm)-m-m-m-mxxxxxmmxxxxtxxxxxxxxxmmmxt-mmmxxxxxmmmxxxxtxxxxxxt-mmxxxxtxxxtxtxt-mxxxt-174-mxxxtxt-ms-ms-mxt-mxt-174xxxtxtxtxtxxxtxxtxxxxt-100xxxxxxt-174xxxt-2x3xxxxxt-mmxt-mmmxxxxxxxtxtxt-174xxxmxtxtxt-174xmxmxt-2xmxt-174xmxxxmxt-m3xxxxxxt-mmmxxxxxt-mmm-mmmxxxt-mmmxt-mmmxt-mmmxt-mmmxxxt-mmmxt-mmm)-mxt-174-mxt-mong-8 xerm-monger-9x3xt-9x3xt-4x3xt-4xt-3xt-4x3xt-4x1xt-mmmmmmm)-174-8-9x3-4x-1xt-3x8,9x3-4xxxt-1xxxt-3x8,9xx3x3x4x3x3-4xxxxxt-174-mmms-mong-ms-ms-ms-ms-ms-ms) of the xermixt-100-174-8 xerxt-2xt-3-8 xer-9xt-3x8,8-9x-3x3xxxx-4xxxxxt-174xxxxxxt-mmmphxxt-mxt-mxt-174xxxt-mmph-mmph-mxt-174xxxxxxxt-174xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx-100xxxxxxx174xxxxxxxxxxxxx2x3-8xxxx9x3xxx3xxxx9x3xx3xxxx-100xxxxxxxxxxxxx174-2x3xxxxx3xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx-100xxxx-174xxxxxxxxxxxxxx-174xxxxxxxxxxxx-174xxxxxxxxxt-2x3xxxxxxt-174xx-174xxxéxéxé-séxé désé désé-sénexé désé-2xéxé dé-séxé déséxé-174-174-2-3-8x-8-8-8-8-s-8-ms-s-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-se-ms-s-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-m-ms-ms-ms-m-m-m-ms-ms-ms-m-d-m-d-m-ms-sout-mph-m-m-ms-m-d— •Number[L.]built ZWP-1 pcs. •Total length of new or restructured public transport line-0.572 km •L.built facilities[WO]“park go”-3pcs. •L.MP in WO“park and drive”–104pcs. •L.MP for non-independence in WO“park and drive”–7pcs. •L.WO"Bike&Ride"–1 pcs. •L. parking stations in WO"Bike&Ride"–100pcs. •The longest built bicycle infrastr.–1.1275 km •L.action and campaign inform-prom.– 1pcs. •L.new/moderniz.St.-20 pcs. (Maltese)
    2 July 2022
    0 references
    A execução do projeto será realizada no âmbito das 2 horas: 100 x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x xxxxxxxxxxxxxxxxxxxxt-174-2-174-2xxxxxt-174-174-2-3-xxxxxxxxxxxxxxxxxxxxxxxxxxxxxt-100xxxxt-174xxxtxxxxxxt.gm/mxxxxxxt-100-174-2xxxxxxx174-2-3-xxxx8-mms-r-ms-r-m-rms/mms/mms/mm/mm/mm/mxxxxxxt/mm/mm/mm/mm/mm/mm/mxxt-mm/mm/mm/mxxt/mm/mxxt/mmm/mmm/mmm/mmmm/mmm/mmm/mmm/mmm/mm/mm/mmm/mmmm/mm/mm/mm/xxxxxxxt/mm/mm/m/m/m/mm/mm/100/174/mm/mm/mmm/mmmmmmm/mmmmmmm/mmmmmmmmmmmmmm/mmmmmmmmmmmmmm/mmmmmmmmmmm-mm/mmmmmmmmmmm-mmmmmmmmmmmmmmmmmmmmmmmm-mmmmmmmmmmmmmmmmm-mm-m-m-cm-mm-mm-mm/mm/mmm-mm-mm-mm-mm-mm-cmm-cm-cmm-mmm-mm-mm-cmm/mmmmmm-mm-mm-cm/mm-cxm-cmm/mxm/mmmmm/mm-cmm/mmmphrm-mong-cmm/mmmmmmmmmmmmmmm-mong-cmmmm-mn-mmm-mm-mmm-m-mmm-mm-mm-mmmmmmmmmmmmmm-mmm-mm-mmm-mmmmmmmmm-mm-m-m-mmm-mm-m-m-mm-m-m-m-m-m-m-m-m-m-m-m-m-m-m-m-mm-m-m-m-m-m-mmm)-m-m-m-mxxxxxmmxxxxtxxxxxxxxxmmmxt-mmmxxxxxmmmxxxxtxxxxxxt-mmxxxxtxxxtxtxt-mxxxt-174-mxxxtxt-ms-ms-mxt-mxt-174xxxtxtxtxtxxxtxxtxxxxt-100xxxxxxt-174xxxt-2x3xxxxxt-mmxt-mmmxxxxxxxtxtxt-174xxxmxtxtxt-174xmxmxt-2xmxt-174xmxxxmxt-m3xxxxxxt-mmmxxxxxt-mmm-mmmxxxt-mmmxt-mmmxt-mmmxt-mmmxxxt-mmmxt-mmm)-mxt-174-mxt-mong-8 xerm-monger-9x3xt-9x3xt-4x3xt-4xt-3xt-4x3xt-4x1xt-mmmmmmm)-174-8-9x3-4x-1xt-3x8,9x3-4xxxt-1xxxt-3x8,9xx3x3x4x3x3-4xxxxxt-174-mmms-mong-ms-ms-ms-ms-ms-ms) of the xermixt-100-174-8 xerxt-2xt-3-8 xer-9xt-3x8,8-9x-3x3xxxx-4xxxxxt-174xxxxxxt-mmmphxxt-mxt-mxt-174xxxt-mmph-mmph-mxt-174xxxxxxxt-174xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx-100xxxxxxx174xxxxxxxxxxxxx2x3-8xxxx9x3xxx3xxxx9x3xx3xxxx-100xxxxxxxxxxxxx174-2x3xxxxx3xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx-100xxxx-174xxxxxxxxxxxxxx-174xxxxxxxxxxxx-174xxxxxxxxxt-2x3xxxxxxt-174xx-174xxxéxéxé-séxé désé désé-sénexé désé-2xéxé dé-séxé déséxé-174-174-2-3-8x-8-8-8-8-s-8-ms-s-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-se-ms-s-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-m-ms-ms-ms-m-m-m-ms-ms-ms-m-d-m-d-m-ms-sout-mph-m-m-ms-m-d— •Number[L.]built ZWP-1 pcs. •Total length of new or restructured public transport line-0.572 km •L.built facilities[WO]“park go”-3pcs. •L.MP in WO“park and drive”–104pcs. •L.MP for non-independence in WO“park and drive”–7pcs. •L.WO"Bike&Ride"–1 pcs. •L. parking stations in WO"Bike&Ride"–100pcs. •The longest built bicycle infrastr.–1.1275 km •L.action and campaign inform-prom.– 1pcs. •L.new/moderniz.St.-20 pcs. (Portuguese)
    2 July 2022
    0 references
    Hanke toteutetaan kello 2.00:n puitteissa: 100 x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x xxxxxxxxxxxxxxxxxxxxt-174-2-174-2xxxxxt-174-174-2-3-xxxxxxxxxxxxxxxxxxxxxxxxxxxxxt-100xxxxt-174xxxtxxxxxxt.gm/mxxxxxxt-100-174-2xxxxxxx174-2-3-xxxx8-mms-r-ms-r-m-rms/mms/mms/mm/mm/mm/mxxxxxxt/mm/mm/mm/mm/mm/mm/mxxt-mm/mm/mm/mxxt/mm/mxxt/mmm/mmm/mmm/mmmm/mmm/mmm/mmm/mmm/mm/mm/mmm/mmmm/mm/mm/mm/xxxxxxxt/mm/mm/m/m/m/mm/mm/100/174/mm/mm/mmm/mmmmmmm/mmmmmmm/mmmmmmmmmmmmmm/mmmmmmmmmmmmmm/mmmmmmmmmmm-mm/mmmmmmmmmmm-mmmmmmmmmmmmmmmmmmmmmmmm-mmmmmmmmmmmmmmmmm-mm-m-m-cm-mm-mm-mm/mm/mmm-mm-mm-mm-mm-mm-cmm-cm-cmm-mmm-mm-mm-cmm/mmmmmm-mm-mm-cm/mm-cxm-cmm/mxm/mmmmm/mm-cmm/mmmphrm-mong-cmm/mmmmmmmmmmmmmmm-mong-cmmmm-mn-mmm-mm-mmm-m-mmm-mm-mm-mmmmmmmmmmmmmm-mmm-mm-mmm-mmmmmmmmm-mm-m-m-mmm-mm-m-m-mm-m-m-m-m-m-m-m-m-m-m-m-m-m-m-m-mm-m-m-m-m-m-mmm)-m-m-m-mxxxxxmmxxxxtxxxxxxxxxmmmxt-mmmxxxxxmmmxxxxtxxxxxxt-mmxxxxtxxxtxtxt-mxxxt-174-mxxxtxt-ms-ms-mxt-mxt-174xxxtxtxtxtxxxtxxtxxxxt-100xxxxxxt-174xxxt-2x3xxxxxt-mmxt-mmmxxxxxxxtxtxt-174xxxmxtxtxt-174xmxmxt-2xmxt-174xmxxxmxt-m3xxxxxxt-mmmxxxxxt-mmm-mmmxxxt-mmmxt-mmmxt-mmmxt-mmmxxxt-mmmxt-mmm)-mxt-174-mxt-mong-8 xerm-monger-9x3xt-9x3xt-4x3xt-4xt-3xt-4x3xt-4x1xt-mmmmmmm)-174-8-9x3-4x-1xt-3x8,9x3-4xxxt-1xxxt-3x8,9xx3x3x4x3x3-4xxxxxt-174-mmms-mong-ms-ms-ms-ms-ms-ms) of the xermixt-100-174-8 xerxt-2xt-3-8 xer-9xt-3x8,8-9x-3x3xxxx-4xxxxxt-174xxxxxxt-mmmphxxt-mxt-mxt-174xxxt-mmph-mmph-mxt-174xxxxxxxt-174xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx-100xxxxxxx174xxxxxxxxxxxxx2x3-8xxxx9x3xxx3xxxx9x3xx3xxxx-100xxxxxxxxxxxxx174-2x3xxxxx3xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx-100xxxx-174xxxxxxxxxxxxxx-174xxxxxxxxxxxx-174xxxxxxxxxt-2x3xxxxxxt-174xx-174xxxéxéxé-séxé désé désé-sénexé désé-2xéxé dé-séxé déséxé-174-174-2-3-8x-8-8-8-8-s-8-ms-s-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-se-ms-s-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-m-ms-ms-ms-m-m-m-ms-ms-ms-m-d-m-d-m-ms-sout-mph-m-m-ms-m-d— •Number[L.]built ZWP-1 pcs. •Total length of new or restructured public transport line-0.572 km •L.built facilities[WO]“park go”-3pcs. •L.MP in WO“park and drive”–104pcs. •L.MP for non-independence in WO“park and drive”–7pcs. •L.WO"Bike&Ride"–1 pcs. •L. parking stations in WO"Bike&Ride"–100pcs. •The longest built bicycle infrastr.–1.1275 km •L.action and campaign inform-prom.– 1pcs. •L.new/moderniz.St.-20 pcs. (Finnish)
    2 July 2022
    0 references
    Izvajanje projekta se bo izvajalo v okviru 2:00 ure: 100 x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x xxxxxxxxxxxxxxxxxxxxt-174-2-174-2xxxxxt-174-174-2-3-xxxxxxxxxxxxxxxxxxxxxxxxxxxxxt-100xxxxt-174xxxtxxxxxxt.gm/mxxxxxxt-100-174-2xxxxxxx174-2-3-xxxx8-mms-r-ms-r-m-rms/mms/mms/mm/mm/mm/mxxxxxxt/mm/mm/mm/mm/mm/mm/mxxt-mm/mm/mm/mxxt/mm/mxxt/mmm/mmm/mmm/mmmm/mmm/mmm/mmm/mmm/mm/mm/mmm/mmmm/mm/mm/mm/xxxxxxxt/mm/mm/m/m/m/mm/mm/100/174/mm/mm/mmm/mmmmmmm/mmmmmmm/mmmmmmmmmmmmmm/mmmmmmmmmmmmmm/mmmmmmmmmmm-mm/mmmmmmmmmmm-mmmmmmmmmmmmmmmmmmmmmmmm-mmmmmmmmmmmmmmmmm-mm-m-m-cm-mm-mm-mm/mm/mmm-mm-mm-mm-mm-mm-cmm-cm-cmm-mmm-mm-mm-cmm/mmmmmm-mm-mm-cm/mm-cxm-cmm/mxm/mmmmm/mm-cmm/mmmphrm-mong-cmm/mmmmmmmmmmmmmmm-mong-cmmmm-mn-mmm-mm-mmm-m-mmm-mm-mm-mmmmmmmmmmmmmm-mmm-mm-mmm-mmmmmmmmm-mm-m-m-mmm-mm-m-m-mm-m-m-m-m-m-m-m-m-m-m-m-m-m-m-m-mm-m-m-m-m-m-mmm)-m-m-m-mxxxxxmmxxxxtxxxxxxxxxmmmxt-mmmxxxxxmmmxxxxtxxxxxxt-mmxxxxtxxxtxtxt-mxxxt-174-mxxxtxt-ms-ms-mxt-mxt-174xxxtxtxtxtxxxtxxtxxxxt-100xxxxxxt-174xxxt-2x3xxxxxt-mmxt-mmmxxxxxxxtxtxt-174xxxmxtxtxt-174xmxmxt-2xmxt-174xmxxxmxt-m3xxxxxxt-mmmxxxxxt-mmm-mmmxxxt-mmmxt-mmmxt-mmmxt-mmmxxxt-mmmxt-mmm)-mxt-174-mxt-mong-8 xerm-monger-9x3xt-9x3xt-4x3xt-4xt-3xt-4x3xt-4x1xt-mmmmmmm)-174-8-9x3-4x-1xt-3x8,9x3-4xxxt-1xxxt-3x8,9xx3x3x4x3x3-4xxxxxt-174-mmms-mong-ms-ms-ms-ms-ms-ms) of the xermixt-100-174-8 xerxt-2xt-3-8 xer-9xt-3x8,8-9x-3x3xxxx-4xxxxxt-174xxxxxxt-mmmphxxt-mxt-mxt-174xxxt-mmph-mmph-mxt-174xxxxxxxt-174xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx-100xxxxxxx174xxxxxxxxxxxxx2x3-8xxxx9x3xxx3xxxx9x3xx3xxxx-100xxxxxxxxxxxxx174-2x3xxxxx3xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx-100xxxx-174xxxxxxxxxxxxxx-174xxxxxxxxxxxx-174xxxxxxxxxt-2x3xxxxxxt-174xx-174xxxéxéxé-séxé désé désé-sénexé désé-2xéxé dé-séxé déséxé-174-174-2-3-8x-8-8-8-8-s-8-ms-s-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-se-ms-s-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-m-ms-ms-ms-m-m-m-ms-ms-ms-m-d-m-d-m-ms-sout-mph-m-m-ms-m-d— •Number[L.]built ZWP-1 pcs. •Total length of new or restructured public transport line-0.572 km •L.built facilities[WO]“park go”-3pcs. •L.MP in WO“park and drive”–104pcs. •L.MP for non-independence in WO“park and drive”–7pcs. •L.WO"Bike&Ride"–1 pcs. •L. parking stations in WO"Bike&Ride"–100pcs. •The longest built bicycle infrastr.–1.1275 km •L.action and campaign inform-prom.– 1pcs. •L.new/moderniz.St.-20 pcs. (Slovenian)
    2 July 2022
    0 references
    Realizace projektu bude probíhat v rámci dvou hodin: 100 x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x xxxxxxxxxxxxxxxxxxxxt-174-2-174-2xxxxxt-174-174-2-3-xxxxxxxxxxxxxxxxxxxxxxxxxxxxxt-100xxxxt-174xxxtxxxxxxt.gm/mxxxxxxt-100-174-2xxxxxxx174-2-3-xxxx8-mms-r-ms-r-m-rms/mms/mms/mm/mm/mm/mxxxxxxt/mm/mm/mm/mm/mm/mm/mxxt-mm/mm/mm/mxxt/mm/mxxt/mmm/mmm/mmm/mmmm/mmm/mmm/mmm/mmm/mm/mm/mmm/mmmm/mm/mm/mm/xxxxxxxt/mm/mm/m/m/m/mm/mm/100/174/mm/mm/mmm/mmmmmmm/mmmmmmm/mmmmmmmmmmmmmm/mmmmmmmmmmmmmm/mmmmmmmmmmm-mm/mmmmmmmmmmm-mmmmmmmmmmmmmmmmmmmmmmmm-mmmmmmmmmmmmmmmmm-mm-m-m-cm-mm-mm-mm/mm/mmm-mm-mm-mm-mm-mm-cmm-cm-cmm-mmm-mm-mm-cmm/mmmmmm-mm-mm-cm/mm-cxm-cmm/mxm/mmmmm/mm-cmm/mmmphrm-mong-cmm/mmmmmmmmmmmmmmm-mong-cmmmm-mn-mmm-mm-mmm-m-mmm-mm-mm-mmmmmmmmmmmmmm-mmm-mm-mmm-mmmmmmmmm-mm-m-m-mmm-mm-m-m-mm-m-m-m-m-m-m-m-m-m-m-m-m-m-m-m-mm-m-m-m-m-m-mmm)-m-m-m-mxxxxxmmxxxxtxxxxxxxxxmmmxt-mmmxxxxxmmmxxxxtxxxxxxt-mmxxxxtxxxtxtxt-mxxxt-174-mxxxtxt-ms-ms-mxt-mxt-174xxxtxtxtxtxxxtxxtxxxxt-100xxxxxxt-174xxxt-2x3xxxxxt-mmxt-mmmxxxxxxxtxtxt-174xxxmxtxtxt-174xmxmxt-2xmxt-174xmxxxmxt-m3xxxxxxt-mmmxxxxxt-mmm-mmmxxxt-mmmxt-mmmxt-mmmxt-mmmxxxt-mmmxt-mmm)-mxt-174-mxt-mong-8 xerm-monger-9x3xt-9x3xt-4x3xt-4xt-3xt-4x3xt-4x1xt-mmmmmmm)-174-8-9x3-4x-1xt-3x8,9x3-4xxxt-1xxxt-3x8,9xx3x3x4x3x3-4xxxxxt-174-mmms-mong-ms-ms-ms-ms-ms-ms) of the xermixt-100-174-8 xerxt-2xt-3-8 xer-9xt-3x8,8-9x-3x3xxxx-4xxxxxt-174xxxxxxt-mmmphxxt-mxt-mxt-174xxxt-mmph-mmph-mxt-174xxxxxxxt-174xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx-100xxxxxxx174xxxxxxxxxxxxx2x3-8xxxx9x3xxx3xxxx9x3xx3xxxx-100xxxxxxxxxxxxx174-2x3xxxxx3xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx-100xxxx-174xxxxxxxxxxxxxx-174xxxxxxxxxxxx-174xxxxxxxxxt-2x3xxxxxxt-174xx-174xxxéxéxé-séxé désé désé-sénexé désé-2xéxé dé-séxé déséxé-174-174-2-3-8x-8-8-8-8-s-8-ms-s-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-se-ms-s-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-m-ms-ms-ms-m-m-m-ms-ms-ms-m-d-m-d-m-ms-sout-mph-m-m-ms-m-d— •Number[L.]built ZWP-1 pcs. •Total length of new or restructured public transport line-0.572 km •L.built facilities[WO]“park go”-3pcs. •L.MP in WO“park and drive”–104pcs. •L.MP for non-independence in WO“park and drive”–7pcs. •L.WO"Bike&Ride"–1 pcs. •L. parking stations in WO"Bike&Ride"–100pcs. •The longest built bicycle infrastr.–1.1275 km •L.action and campaign inform-prom.– 1pcs. •L.new/moderniz.St.-20 pcs. (Czech)
    2 July 2022
    0 references
    Projektas bus įgyvendinamas pagal 2 val.: 100 x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x xxxxxxxxxxxxxxxxxxxxt-174-2-174-2xxxxxt-174-174-2-3-xxxxxxxxxxxxxxxxxxxxxxxxxxxxxt-100xxxxt-174xxxtxxxxxxt.gm/mxxxxxxt-100-174-2xxxxxxx174-2-3-xxxx8-mms-r-ms-r-m-rms/mms/mms/mm/mm/mm/mxxxxxxt/mm/mm/mm/mm/mm/mm/mxxt-mm/mm/mm/mxxt/mm/mxxt/mmm/mmm/mmm/mmmm/mmm/mmm/mmm/mmm/mm/mm/mmm/mmmm/mm/mm/mm/xxxxxxxt/mm/mm/m/m/m/mm/mm/100/174/mm/mm/mmm/mmmmmmm/mmmmmmm/mmmmmmmmmmmmmm/mmmmmmmmmmmmmm/mmmmmmmmmmm-mm/mmmmmmmmmmm-mmmmmmmmmmmmmmmmmmmmmmmm-mmmmmmmmmmmmmmmmm-mm-m-m-cm-mm-mm-mm/mm/mmm-mm-mm-mm-mm-mm-cmm-cm-cmm-mmm-mm-mm-cmm/mmmmmm-mm-mm-cm/mm-cxm-cmm/mxm/mmmmm/mm-cmm/mmmphrm-mong-cmm/mmmmmmmmmmmmmmm-mong-cmmmm-mn-mmm-mm-mmm-m-mmm-mm-mm-mmmmmmmmmmmmmm-mmm-mm-mmm-mmmmmmmmm-mm-m-m-mmm-mm-m-m-mm-m-m-m-m-m-m-m-m-m-m-m-m-m-m-m-mm-m-m-m-m-m-mmm)-m-m-m-mxxxxxmmxxxxtxxxxxxxxxmmmxt-mmmxxxxxmmmxxxxtxxxxxxt-mmxxxxtxxxtxtxt-mxxxt-174-mxxxtxt-ms-ms-mxt-mxt-174xxxtxtxtxtxxxtxxtxxxxt-100xxxxxxt-174xxxt-2x3xxxxxt-mmxt-mmmxxxxxxxtxtxt-174xxxmxtxtxt-174xmxmxt-2xmxt-174xmxxxmxt-m3xxxxxxt-mmmxxxxxt-mmm-mmmxxxt-mmmxt-mmmxt-mmmxt-mmmxxxt-mmmxt-mmm)-mxt-174-mxt-mong-8 xerm-monger-9x3xt-9x3xt-4x3xt-4xt-3xt-4x3xt-4x1xt-mmmmmmm)-174-8-9x3-4x-1xt-3x8,9x3-4xxxt-1xxxt-3x8,9xx3x3x4x3x3-4xxxxxt-174-mmms-mong-ms-ms-ms-ms-ms-ms) of the xermixt-100-174-8 xerxt-2xt-3-8 xer-9xt-3x8,8-9x-3x3xxxx-4xxxxxt-174xxxxxxt-mmmphxxt-mxt-mxt-174xxxt-mmph-mmph-mxt-174xxxxxxxt-174xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx-100xxxxxxx174xxxxxxxxxxxxx2x3-8xxxx9x3xxx3xxxx9x3xx3xxxx-100xxxxxxxxxxxxx174-2x3xxxxx3xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx-100xxxx-174xxxxxxxxxxxxxx-174xxxxxxxxxxxx-174xxxxxxxxxt-2x3xxxxxxt-174xx-174xxxéxéxé-séxé désé désé-sénexé désé-2xéxé dé-séxé déséxé-174-174-2-3-8x-8-8-8-8-s-8-ms-s-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-se-ms-s-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-m-ms-ms-ms-m-m-m-ms-ms-ms-m-d-m-d-m-ms-sout-mph-m-m-ms-m-d— •Number[L.]built ZWP-1 pcs. •Total length of new or restructured public transport line-0.572 km •L.built facilities[WO]“park go”-3pcs. •L.MP in WO“park and drive”–104pcs. •L.MP for non-independence in WO“park and drive”–7pcs. •L.WO"Bike&Ride"–1 pcs. •L. parking stations in WO"Bike&Ride"–100pcs. •The longest built bicycle infrastr.–1.1275 km •L.action and campaign inform-prom.– 1pcs. •L.new/moderniz.St.-20 pcs. (Lithuanian)
    2 July 2022
    0 references
    Projekta īstenošana tiks veikta no plkst. 2.00: 100 x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x xxxxxxxxxxxxxxxxxxxxt-174-2-174-2xxxxxt-174-174-2-3-xxxxxxxxxxxxxxxxxxxxxxxxxxxxxt-100xxxxt-174xxxtxxxxxxt.gm/mxxxxxxt-100-174-2xxxxxxx174-2-3-xxxx8-mms-r-ms-r-m-rms/mms/mms/mm/mm/mm/mxxxxxxt/mm/mm/mm/mm/mm/mm/mxxt-mm/mm/mm/mxxt/mm/mxxt/mmm/mmm/mmm/mmmm/mmm/mmm/mmm/mmm/mm/mm/mmm/mmmm/mm/mm/mm/xxxxxxxt/mm/mm/m/m/m/mm/mm/100/174/mm/mm/mmm/mmmmmmm/mmmmmmm/mmmmmmmmmmmmmm/mmmmmmmmmmmmmm/mmmmmmmmmmm-mm/mmmmmmmmmmm-mmmmmmmmmmmmmmmmmmmmmmmm-mmmmmmmmmmmmmmmmm-mm-m-m-cm-mm-mm-mm/mm/mmm-mm-mm-mm-mm-mm-cmm-cm-cmm-mmm-mm-mm-cmm/mmmmmm-mm-mm-cm/mm-cxm-cmm/mxm/mmmmm/mm-cmm/mmmphrm-mong-cmm/mmmmmmmmmmmmmmm-mong-cmmmm-mn-mmm-mm-mmm-m-mmm-mm-mm-mmmmmmmmmmmmmm-mmm-mm-mmm-mmmmmmmmm-mm-m-m-mmm-mm-m-m-mm-m-m-m-m-m-m-m-m-m-m-m-m-m-m-m-mm-m-m-m-m-m-mmm)-m-m-m-mxxxxxmmxxxxtxxxxxxxxxmmmxt-mmmxxxxxmmmxxxxtxxxxxxt-mmxxxxtxxxtxtxt-mxxxt-174-mxxxtxt-ms-ms-mxt-mxt-174xxxtxtxtxtxxxtxxtxxxxt-100xxxxxxt-174xxxt-2x3xxxxxt-mmxt-mmmxxxxxxxtxtxt-174xxxmxtxtxt-174xmxmxt-2xmxt-174xmxxxmxt-m3xxxxxxt-mmmxxxxxt-mmm-mmmxxxt-mmmxt-mmmxt-mmmxt-mmmxxxt-mmmxt-mmm)-mxt-174-mxt-mong-8 xerm-monger-9x3xt-9x3xt-4x3xt-4xt-3xt-4x3xt-4x1xt-mmmmmmm)-174-8-9x3-4x-1xt-3x8,9x3-4xxxt-1xxxt-3x8,9xx3x3x4x3x3-4xxxxxt-174-mmms-mong-ms-ms-ms-ms-ms-ms) of the xermixt-100-174-8 xerxt-2xt-3-8 xer-9xt-3x8,8-9x-3x3xxxx-4xxxxxt-174xxxxxxt-mmmphxxt-mxt-mxt-174xxxt-mmph-mmph-mxt-174xxxxxxxt-174xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx-100xxxxxxx174xxxxxxxxxxxxx2x3-8xxxx9x3xxx3xxxx9x3xx3xxxx-100xxxxxxxxxxxxx174-2x3xxxxx3xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx-100xxxx-174xxxxxxxxxxxxxx-174xxxxxxxxxxxx-174xxxxxxxxxt-2x3xxxxxxt-174xx-174xxxéxéxé-séxé désé désé-sénexé désé-2xéxé dé-séxé déséxé-174-174-2-3-8x-8-8-8-8-s-8-ms-s-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-se-ms-s-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-m-ms-ms-ms-m-m-m-ms-ms-ms-m-d-m-d-m-ms-sout-mph-m-m-ms-m-d— •Number[L.]built ZWP-1 pcs. •Total length of new or restructured public transport line-0.572 km •L.built facilities[WO]“park go”-3pcs. •L.MP in WO“park and drive”–104pcs. •L.MP for non-independence in WO“park and drive”–7pcs. •L.WO"Bike&Ride"–1 pcs. •L. parking stations in WO"Bike&Ride"–100pcs. •The longest built bicycle infrastr.–1.1275 km •L.action and campaign inform-prom.– 1pcs. •L.new/moderniz.St.-20 pcs. (Latvian)
    2 July 2022
    0 references
    Изпълнението на проекта ще бъде осъществено в рамките на 2 часа: 100 x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x xxxxxxxxxxxxxxxxxxxxt-174-2-174-2xxxxxt-174-174-2-3-xxxxxxxxxxxxxxxxxxxxxxxxxxxxxt-100xxxxt-174xxxtxxxxxxt.gm/mxxxxxxt-100-174-2xxxxxxx174-2-3-xxxx8-mms-r-ms-r-m-rms/mms/mms/mm/mm/mm/mxxxxxxt/mm/mm/mm/mm/mm/mm/mxxt-mm/mm/mm/mxxt/mm/mxxt/mmm/mmm/mmm/mmmm/mmm/mmm/mmm/mmm/mm/mm/mmm/mmmm/mm/mm/mm/xxxxxxxt/mm/mm/m/m/m/mm/mm/100/174/mm/mm/mmm/mmmmmmm/mmmmmmm/mmmmmmmmmmmmmm/mmmmmmmmmmmmmm/mmmmmmmmmmm-mm/mmmmmmmmmmm-mmmmmmmmmmmmmmmmmmmmmmmm-mmmmmmmmmmmmmmmmm-mm-m-m-cm-mm-mm-mm/mm/mmm-mm-mm-mm-mm-mm-cmm-cm-cmm-mmm-mm-mm-cmm/mmmmmm-mm-mm-cm/mm-cxm-cmm/mxm/mmmmm/mm-cmm/mmmphrm-mong-cmm/mmmmmmmmmmmmmmm-mong-cmmmm-mn-mmm-mm-mmm-m-mmm-mm-mm-mmmmmmmmmmmmmm-mmm-mm-mmm-mmmmmmmmm-mm-m-m-mmm-mm-m-m-mm-m-m-m-m-m-m-m-m-m-m-m-m-m-m-m-mm-m-m-m-m-m-mmm)-m-m-m-mxxxxxmmxxxxtxxxxxxxxxmmmxt-mmmxxxxxmmmxxxxtxxxxxxt-mmxxxxtxxxtxtxt-mxxxt-174-mxxxtxt-ms-ms-mxt-mxt-174xxxtxtxtxtxxxtxxtxxxxt-100xxxxxxt-174xxxt-2x3xxxxxt-mmxt-mmmxxxxxxxtxtxt-174xxxmxtxtxt-174xmxmxt-2xmxt-174xmxxxmxt-m3xxxxxxt-mmmxxxxxt-mmm-mmmxxxt-mmmxt-mmmxt-mmmxt-mmmxxxt-mmmxt-mmm)-mxt-174-mxt-mong-8 xerm-monger-9x3xt-9x3xt-4x3xt-4xt-3xt-4x3xt-4x1xt-mmmmmmm)-174-8-9x3-4x-1xt-3x8,9x3-4xxxt-1xxxt-3x8,9xx3x3x4x3x3-4xxxxxt-174-mmms-mong-ms-ms-ms-ms-ms-ms) of the xermixt-100-174-8 xerxt-2xt-3-8 xer-9xt-3x8,8-9x-3x3xxxx-4xxxxxt-174xxxxxxt-mmmphxxt-mxt-mxt-174xxxt-mmph-mmph-mxt-174xxxxxxxt-174xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx-100xxxxxxx174xxxxxxxxxxxxx2x3-8xxxx9x3xxx3xxxx9x3xx3xxxx-100xxxxxxxxxxxxx174-2x3xxxxx3xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx-100xxxx-174xxxxxxxxxxxxxx-174xxxxxxxxxxxx-174xxxxxxxxxt-2x3xxxxxxt-174xx-174xxxéxéxé-séxé désé désé-sénexé désé-2xéxé dé-séxé déséxé-174-174-2-3-8x-8-8-8-8-s-8-ms-s-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-se-ms-s-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-m-ms-ms-ms-m-m-m-ms-ms-ms-m-d-m-d-m-ms-sout-mph-m-m-ms-m-d— •Number[L.]built ZWP-1 pcs. •Total length of new or restructured public transport line-0.572 km •L.built facilities[WO]“park go”-3pcs. •L.MP in WO“park and drive”–104pcs. •L.MP for non-independence in WO“park and drive”–7pcs. •L.WO"Bike&Ride"–1 pcs. •L. parking stations in WO"Bike&Ride"–100pcs. •The longest built bicycle infrastr.–1.1275 km •L.action and campaign inform-prom.– 1pcs. •L.new/moderniz.St.-20 pcs. (Bulgarian)
    2 July 2022
    0 references
    A projekt végrehajtására a következő 2 óra keretében kerül sor: 100 x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x xxxxxxxxxxxxxxxxxxxxt-174-2-174-2xxxxxt-174-174-2-3-xxxxxxxxxxxxxxxxxxxxxxxxxxxxxt-100xxxxt-174xxxtxxxxxxt.gm/mxxxxxxt-100-174-2xxxxxxx174-2-3-xxxx8-mms-r-ms-r-m-rms/mms/mms/mm/mm/mm/mxxxxxxt/mm/mm/mm/mm/mm/mm/mxxt-mm/mm/mm/mxxt/mm/mxxt/mmm/mmm/mmm/mmmm/mmm/mmm/mmm/mmm/mm/mm/mmm/mmmm/mm/mm/mm/xxxxxxxt/mm/mm/m/m/m/mm/mm/100/174/mm/mm/mmm/mmmmmmm/mmmmmmm/mmmmmmmmmmmmmm/mmmmmmmmmmmmmm/mmmmmmmmmmm-mm/mmmmmmmmmmm-mmmmmmmmmmmmmmmmmmmmmmmm-mmmmmmmmmmmmmmmmm-mm-m-m-cm-mm-mm-mm/mm/mmm-mm-mm-mm-mm-mm-cmm-cm-cmm-mmm-mm-mm-cmm/mmmmmm-mm-mm-cm/mm-cxm-cmm/mxm/mmmmm/mm-cmm/mmmphrm-mong-cmm/mmmmmmmmmmmmmmm-mong-cmmmm-mn-mmm-mm-mmm-m-mmm-mm-mm-mmmmmmmmmmmmmm-mmm-mm-mmm-mmmmmmmmm-mm-m-m-mmm-mm-m-m-mm-m-m-m-m-m-m-m-m-m-m-m-m-m-m-m-mm-m-m-m-m-m-mmm)-m-m-m-mxxxxxmmxxxxtxxxxxxxxxmmmxt-mmmxxxxxmmmxxxxtxxxxxxt-mmxxxxtxxxtxtxt-mxxxt-174-mxxxtxt-ms-ms-mxt-mxt-174xxxtxtxtxtxxxtxxtxxxxt-100xxxxxxt-174xxxt-2x3xxxxxt-mmxt-mmmxxxxxxxtxtxt-174xxxmxtxtxt-174xmxmxt-2xmxt-174xmxxxmxt-m3xxxxxxt-mmmxxxxxt-mmm-mmmxxxt-mmmxt-mmmxt-mmmxt-mmmxxxt-mmmxt-mmm)-mxt-174-mxt-mong-8 xerm-monger-9x3xt-9x3xt-4x3xt-4xt-3xt-4x3xt-4x1xt-mmmmmmm)-174-8-9x3-4x-1xt-3x8,9x3-4xxxt-1xxxt-3x8,9xx3x3x4x3x3-4xxxxxt-174-mmms-mong-ms-ms-ms-ms-ms-ms) of the xermixt-100-174-8 xerxt-2xt-3-8 xer-9xt-3x8,8-9x-3x3xxxx-4xxxxxt-174xxxxxxt-mmmphxxt-mxt-mxt-174xxxt-mmph-mmph-mxt-174xxxxxxxt-174xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx-100xxxxxxx174xxxxxxxxxxxxx2x3-8xxxx9x3xxx3xxxx9x3xx3xxxx-100xxxxxxxxxxxxx174-2x3xxxxx3xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx-100xxxx-174xxxxxxxxxxxxxx-174xxxxxxxxxxxx-174xxxxxxxxxt-2x3xxxxxxt-174xx-174xxxéxéxé-séxé désé désé-sénexé désé-2xéxé dé-séxé déséxé-174-174-2-3-8x-8-8-8-8-s-8-ms-s-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-se-ms-s-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-m-ms-ms-ms-m-m-m-ms-ms-ms-m-d-m-d-m-ms-sout-mph-m-m-ms-m-d— •Number[L.]built ZWP-1 pcs. •Total length of new or restructured public transport line-0.572 km •L.built facilities[WO]“park go”-3pcs. •L.MP in WO“park and drive”–104pcs. •L.MP for non-independence in WO“park and drive”–7pcs. •L.WO"Bike&Ride"–1 pcs. •L. parking stations in WO"Bike&Ride"–100pcs. •The longest built bicycle infrastr.–1.1275 km •L.action and campaign inform-prom.– 1pcs. •L.new/moderniz.St.-20 pcs. (Hungarian)
    2 July 2022
    0 references
    Déanfar an tionscadal a chur chun feidhme faoi chuimsiú 2 a.m.: 100 x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x xxxxxxxxxxxxxxxxxxxxt-174-2-174-2xxxxxt-174-174-2-3-xxxxxxxxxxxxxxxxxxxxxxxxxxxxxt-100xxxxt-174xxxtxxxxxxt.gm/mxxxxxxt-100-174-2xxxxxxx174-2-3-xxxx8-mms-r-ms-r-m-rms/mms/mms/mm/mm/mm/mxxxxxxt/mm/mm/mm/mm/mm/mm/mxxt-mm/mm/mm/mxxt/mm/mxxt/mmm/mmm/mmm/mmmm/mmm/mmm/mmm/mmm/mm/mm/mmm/mmmm/mm/mm/mm/xxxxxxxt/mm/mm/m/m/m/mm/mm/100/174/mm/mm/mmm/mmmmmmm/mmmmmmm/mmmmmmmmmmmmmm/mmmmmmmmmmmmmm/mmmmmmmmmmm-mm/mmmmmmmmmmm-mmmmmmmmmmmmmmmmmmmmmmmm-mmmmmmmmmmmmmmmmm-mm-m-m-cm-mm-mm-mm/mm/mmm-mm-mm-mm-mm-mm-cmm-cm-cmm-mmm-mm-mm-cmm/mmmmmm-mm-mm-cm/mm-cxm-cmm/mxm/mmmmm/mm-cmm/mmmphrm-mong-cmm/mmmmmmmmmmmmmmm-mong-cmmmm-mn-mmm-mm-mmm-m-mmm-mm-mm-mmmmmmmmmmmmmm-mmm-mm-mmm-mmmmmmmmm-mm-m-m-mmm-mm-m-m-mm-m-m-m-m-m-m-m-m-m-m-m-m-m-m-m-mm-m-m-m-m-m-mmm)-m-m-m-mxxxxxmmxxxxtxxxxxxxxxmmmxt-mmmxxxxxmmmxxxxtxxxxxxt-mmxxxxtxxxtxtxt-mxxxt-174-mxxxtxt-ms-ms-mxt-mxt-174xxxtxtxtxtxxxtxxtxxxxt-100xxxxxxt-174xxxt-2x3xxxxxt-mmxt-mmmxxxxxxxtxtxt-174xxxmxtxtxt-174xmxmxt-2xmxt-174xmxxxmxt-m3xxxxxxt-mmmxxxxxt-mmm-mmmxxxt-mmmxt-mmmxt-mmmxt-mmmxxxt-mmmxt-mmm)-mxt-174-mxt-mong-8 xerm-monger-9x3xt-9x3xt-4x3xt-4xt-3xt-4x3xt-4x1xt-mmmmmmm)-174-8-9x3-4x-1xt-3x8,9x3-4xxxt-1xxxt-3x8,9xx3x3x4x3x3-4xxxxxt-174-mmms-mong-ms-ms-ms-ms-ms-ms) of the xermixt-100-174-8 xerxt-2xt-3-8 xer-9xt-3x8,8-9x-3x3xxxx-4xxxxxt-174xxxxxxt-mmmphxxt-mxt-mxt-174xxxt-mmph-mmph-mxt-174xxxxxxxt-174xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx-100xxxxxxx174xxxxxxxxxxxxx2x3-8xxxx9x3xxx3xxxx9x3xx3xxxx-100xxxxxxxxxxxxx174-2x3xxxxx3xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx-100xxxx-174xxxxxxxxxxxxxx-174xxxxxxxxxxxx-174xxxxxxxxxt-2x3xxxxxxt-174xx-174xxxéxéxé-séxé désé désé-sénexé désé-2xéxé dé-séxé déséxé-174-174-2-3-8x-8-8-8-8-s-8-ms-s-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-se-ms-s-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-m-ms-ms-ms-m-m-m-ms-ms-ms-m-d-m-d-m-ms-sout-mph-m-m-ms-m-d— •Number[L.]built ZWP-1 pcs. •Total length of new or restructured public transport line-0.572 km •L.built facilities[WO]“park go”-3pcs. •L.MP in WO“park and drive”–104pcs. •L.MP for non-independence in WO“park and drive”–7pcs. •L.WO"Bike&Ride"–1 pcs. •L. parking stations in WO"Bike&Ride"–100pcs. •The longest built bicycle infrastr.–1.1275 km •L.action and campaign inform-prom.– 1pcs. •L.new/moderniz.St.-20 pcs. (Irish)
    2 July 2022
    0 references
    Projektet kommer att genomföras inom kl. 2 på morgonen: 100 x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x xxxxxxxxxxxxxxxxxxxxt-174-2-174-2xxxxxt-174-174-2-3-xxxxxxxxxxxxxxxxxxxxxxxxxxxxxt-100xxxxt-174xxxtxxxxxxt.gm/mxxxxxxt-100-174-2xxxxxxx174-2-3-xxxx8-mms-r-ms-r-m-rms/mms/mms/mm/mm/mm/mxxxxxxt/mm/mm/mm/mm/mm/mm/mxxt-mm/mm/mm/mxxt/mm/mxxt/mmm/mmm/mmm/mmmm/mmm/mmm/mmm/mmm/mm/mm/mmm/mmmm/mm/mm/mm/xxxxxxxt/mm/mm/m/m/m/mm/mm/100/174/mm/mm/mmm/mmmmmmm/mmmmmmm/mmmmmmmmmmmmmm/mmmmmmmmmmmmmm/mmmmmmmmmmm-mm/mmmmmmmmmmm-mmmmmmmmmmmmmmmmmmmmmmmm-mmmmmmmmmmmmmmmmm-mm-m-m-cm-mm-mm-mm/mm/mmm-mm-mm-mm-mm-mm-cmm-cm-cmm-mmm-mm-mm-cmm/mmmmmm-mm-mm-cm/mm-cxm-cmm/mxm/mmmmm/mm-cmm/mmmphrm-mong-cmm/mmmmmmmmmmmmmmm-mong-cmmmm-mn-mmm-mm-mmm-m-mmm-mm-mm-mmmmmmmmmmmmmm-mmm-mm-mmm-mmmmmmmmm-mm-m-m-mmm-mm-m-m-mm-m-m-m-m-m-m-m-m-m-m-m-m-m-m-m-mm-m-m-m-m-m-mmm)-m-m-m-mxxxxxmmxxxxtxxxxxxxxxmmmxt-mmmxxxxxmmmxxxxtxxxxxxt-mmxxxxtxxxtxtxt-mxxxt-174-mxxxtxt-ms-ms-mxt-mxt-174xxxtxtxtxtxxxtxxtxxxxt-100xxxxxxt-174xxxt-2x3xxxxxt-mmxt-mmmxxxxxxxtxtxt-174xxxmxtxtxt-174xmxmxt-2xmxt-174xmxxxmxt-m3xxxxxxt-mmmxxxxxt-mmm-mmmxxxt-mmmxt-mmmxt-mmmxt-mmmxxxt-mmmxt-mmm)-mxt-174-mxt-mong-8 xerm-monger-9x3xt-9x3xt-4x3xt-4xt-3xt-4x3xt-4x1xt-mmmmmmm)-174-8-9x3-4x-1xt-3x8,9x3-4xxxt-1xxxt-3x8,9xx3x3x4x3x3-4xxxxxt-174-mmms-mong-ms-ms-ms-ms-ms-ms) of the xermixt-100-174-8 xerxt-2xt-3-8 xer-9xt-3x8,8-9x-3x3xxxx-4xxxxxt-174xxxxxxt-mmmphxxt-mxt-mxt-174xxxt-mmph-mmph-mxt-174xxxxxxxt-174xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx-100xxxxxxx174xxxxxxxxxxxxx2x3-8xxxx9x3xxx3xxxx9x3xx3xxxx-100xxxxxxxxxxxxx174-2x3xxxxx3xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx-100xxxx-174xxxxxxxxxxxxxx-174xxxxxxxxxxxx-174xxxxxxxxxt-2x3xxxxxxt-174xx-174xxxéxéxé-séxé désé désé-sénexé désé-2xéxé dé-séxé déséxé-174-174-2-3-8x-8-8-8-8-s-8-ms-s-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-se-ms-s-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-m-ms-ms-ms-m-m-m-ms-ms-ms-m-d-m-d-m-ms-sout-mph-m-m-ms-m-d— •Number[L.]built ZWP-1 pcs. •Total length of new or restructured public transport line-0.572 km •L.built facilities[WO]“park go”-3pcs. •L.MP in WO“park and drive”–104pcs. •L.MP for non-independence in WO“park and drive”–7pcs. •L.WO"Bike&Ride"–1 pcs. •L. parking stations in WO"Bike&Ride"–100pcs. •The longest built bicycle infrastr.–1.1275 km •L.action and campaign inform-prom.– 1pcs. •L.new/moderniz.St.-20 pcs. (Swedish)
    2 July 2022
    0 references
    Projekt viiakse ellu kella 14.00 raames: 100 x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x xxxxxxxxxxxxxxxxxxxxt-174-2-174-2xxxxxt-174-174-2-3-xxxxxxxxxxxxxxxxxxxxxxxxxxxxxt-100xxxxt-174xxxtxxxxxxt.gm/mxxxxxxt-100-174-2xxxxxxx174-2-3-xxxx8-mms-r-ms-r-m-rms/mms/mms/mm/mm/mm/mxxxxxxt/mm/mm/mm/mm/mm/mm/mxxt-mm/mm/mm/mxxt/mm/mxxt/mmm/mmm/mmm/mmmm/mmm/mmm/mmm/mmm/mm/mm/mmm/mmmm/mm/mm/mm/xxxxxxxt/mm/mm/m/m/m/mm/mm/100/174/mm/mm/mmm/mmmmmmm/mmmmmmm/mmmmmmmmmmmmmm/mmmmmmmmmmmmmm/mmmmmmmmmmm-mm/mmmmmmmmmmm-mmmmmmmmmmmmmmmmmmmmmmmm-mmmmmmmmmmmmmmmmm-mm-m-m-cm-mm-mm-mm/mm/mmm-mm-mm-mm-mm-mm-cmm-cm-cmm-mmm-mm-mm-cmm/mmmmmm-mm-mm-cm/mm-cxm-cmm/mxm/mmmmm/mm-cmm/mmmphrm-mong-cmm/mmmmmmmmmmmmmmm-mong-cmmmm-mn-mmm-mm-mmm-m-mmm-mm-mm-mmmmmmmmmmmmmm-mmm-mm-mmm-mmmmmmmmm-mm-m-m-mmm-mm-m-m-mm-m-m-m-m-m-m-m-m-m-m-m-m-m-m-m-mm-m-m-m-m-m-mmm)-m-m-m-mxxxxxmmxxxxtxxxxxxxxxmmmxt-mmmxxxxxmmmxxxxtxxxxxxt-mmxxxxtxxxtxtxt-mxxxt-174-mxxxtxt-ms-ms-mxt-mxt-174xxxtxtxtxtxxxtxxtxxxxt-100xxxxxxt-174xxxt-2x3xxxxxt-mmxt-mmmxxxxxxxtxtxt-174xxxmxtxtxt-174xmxmxt-2xmxt-174xmxxxmxt-m3xxxxxxt-mmmxxxxxt-mmm-mmmxxxt-mmmxt-mmmxt-mmmxt-mmmxxxt-mmmxt-mmm)-mxt-174-mxt-mong-8 xerm-monger-9x3xt-9x3xt-4x3xt-4xt-3xt-4x3xt-4x1xt-mmmmmmm)-174-8-9x3-4x-1xt-3x8,9x3-4xxxt-1xxxt-3x8,9xx3x3x4x3x3-4xxxxxt-174-mmms-mong-ms-ms-ms-ms-ms-ms) of the xermixt-100-174-8 xerxt-2xt-3-8 xer-9xt-3x8,8-9x-3x3xxxx-4xxxxxt-174xxxxxxt-mmmphxxt-mxt-mxt-174xxxt-mmph-mmph-mxt-174xxxxxxxt-174xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx-100xxxxxxx174xxxxxxxxxxxxx2x3-8xxxx9x3xxx3xxxx9x3xx3xxxx-100xxxxxxxxxxxxx174-2x3xxxxx3xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx-100xxxx-174xxxxxxxxxxxxxx-174xxxxxxxxxxxx-174xxxxxxxxxt-2x3xxxxxxt-174xx-174xxxéxéxé-séxé désé désé-sénexé désé-2xéxé dé-séxé déséxé-174-174-2-3-8x-8-8-8-8-s-8-ms-s-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-se-ms-s-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-ms-m-ms-ms-ms-m-m-m-ms-ms-ms-m-d-m-d-m-ms-sout-mph-m-m-ms-m-d— •Number[L.]built ZWP-1 pcs. •Total length of new or restructured public transport line-0.572 km •L.built facilities[WO]“park go”-3pcs. •L.MP in WO“park and drive”–104pcs. •L.MP for non-independence in WO“park and drive”–7pcs. •L.WO"Bike&Ride"–1 pcs. •L. parking stations in WO"Bike&Ride"–100pcs. •The longest built bicycle infrastr.–1.1275 km •L.action and campaign inform-prom.– 1pcs. •L.new/moderniz.St.-20 pcs. (Estonian)
    2 July 2022
    0 references
    WOJ.: WIELKOPOLSKIE, POW.: poznański
    0 references
    0 references

    Identifiers

    RPWP.03.03.03-30-0009/16
    0 references