Revitalisation of railway lines 140/169/179/885/138 connection: Orzesze Jaśkowice-Tychy-Baraniec-KWK Piast-New Bieruń-Oświęcim (Q2713449): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Change because item Q2515024 was merged with Q2518853) |
(Changed an Item: Import item from Poland) |
||
Property / location (string) | |||
WOJ.: ŚLĄSKIE, POW.: Sosnowiec | |||
Property / location (string): WOJ.: ŚLĄSKIE, POW.: Sosnowiec / rank | |||
Normal rank | |||
Property / priority axis | |||
Property / priority axis: TRANSPORTATION / rank | |||
Normal rank |
Revision as of 08:17, 21 October 2022
Project Q2713449 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Revitalisation of railway lines 140/169/179/885/138 connection: Orzesze Jaśkowice-Tychy-Baraniec-KWK Piast-New Bieruń-Oświęcim |
Project Q2713449 in Poland |
Statements
16,092,885.0 zloty
0 references
18,932,805.89 zloty
0 references
85.0 percent
0 references
24 February 2017
0 references
25 April 2022
0 references
PKP POLSKIE LINIE KOLEJOWE SPÓŁKA AKCYJNA
0 references
Przedmiotem Projektu jest przygotowanie dokumentacji przedprojektowej i projektowej niezbędnej do realizacji przedsięwzięcia „Rewitalizacji linii kolejowych nr 140/169/179/885/138 połączenia: Orzesze Jaśkowice-Tychy-Baraniec-KWK Piast-Nowy Bieruń-Oświęcim. Dokumentacja projektowa dotyczyć będzie zakresu prac w podziale na następujące odcinki: 1: LK nr 140 Katowice Ligota-Nędza, stacja Orzesze Jaśkowice, tor nr 1 od km 21.349 do km 22.234 o dł. 0,885 km, LK nr 169 Tychy-Orzesze Jaśkowice tor nr 1 od km 0,549 do km 17,484 o dł. 16,935 km.2: LK nr 169 Tychy-Orzesze Jaśkowice, stacja Tychy, tor nr 1 od km -0,246 do km 0,549 o dł. 0,795 km, LK nr 179 Tychy-Lędziny-Mysłowice Kosztowy od km 0,647 do km 12,250 o dł. 11,603 km.3: LK nr 179 Tychy-Lędziny-Mysłowice Kosztowy od km 12,250 do km 14,560 o dł. 2,310 km, LK nr 885 Nowy Bieruń – KWK Piast – podg. Baraniec od km 0,00 do km 5,603 o dł. 5,603 km, LK nr 138 Oświęcim – Nowy Bieruń od km 0,525 do km 4,484 o dł. 3,959 km. (Polish)
0 references
The subject of the project is the preparation of the pre-design and design documentation necessary for the implementation of the project "Regeneration of railway lines No 140/169/179/885/138 of the connection: Orzesze Jaśkowice-Tychy-Baraniec-KWK Piast-New Bieruń-Oświęcim. The project documentation will cover the scope of work broken down into the following sections: 1: LK 140 Katowice Ligota-Nędza, Orzesze Jaśkowice station, track no. 1 from km 21.349 to km 22.234 l. 0.885 km, LK No 169 Tychy-Orzesze Jaśkowice track no. 1 from km 0.549 to km 17,484 d. 16,935 km.2: LK 169 Tychy-Orzesze Jaśkowice, Tychy station, track no. 1 from km -0.246 to km 0.549, long. 0.795 km, LK No 179 Tychy-Lędziny-Mysłowice Cost from km 0.647 to km 12,250 l. 11,603 km.3: LK No 179 Tychy-Lędziny-Mysłowice Cost from km 12,250 to km 14.560 2,310 km, LK no. 885 Nowy Bieruń – KWK Piast – podg. Baraniec from km 0.00 to km 5,603 d. 5,603 km, LK No 138 Oświęcim – Nowy Bieruń from km 0.525 to 4,484 km long. 3,959 km. (English)
8 July 2021
0 references
Le projet a pour objet la préparation de la documentation préalable à la conception et à la conception nécessaire à la mise en œuvre du projet "Régénération des lignes de chemin de fer no 140/169/179/885/138 de la liaison: Orzesze Jaśkowice-Tychy-Baraniec-KWK Piast-New Bieruń-Oświęcim. La documentation du projet couvrira l’étendue des travaux répartis dans les sections suivantes: 1: LK 140 Katowice Ligota-Nędza, station Orzesze Jaśkowice, voie no 1 du km 21.349 au km 22,234 l. 0,885 km, LK No 169 Tychy-Orzesze Jaśkowice piste no 1 du km 0.549 au km 17,484 d. 16,935 km.2: LK 169 Tychy-Orzesze Jaśkowice, gare de Tychy, voie no 1 du km -0.246 au km 0.549, longue. 0,795 km, LK No 179 Tychy-Lędziny-Mysłowice Prix du km 0,647 au km 12,250 l. 11,603 km.3: LK No 179 Tychy-Lędziny-Mysłowice Coût du km 12250 au km 14.560 2,310 km, LK no 885 Nowy Bieruń — KWK Piast — PODG. Baraniec du km 0.00 au km 5,603 d. 5,603 km, LK No 138 Oświęcim — Nowy Bieruń du km 0.525 à 4,484 km de long. 3,959 km. (French)
4 December 2021
0 references
Gegenstand des Projekts ist die Vorbereitung der für die Durchführung des Projekts „Regeneration der Eisenbahnstrecken Nr. 140/169/179/885/138 der Verbindung“ erforderlichen Vorentwurfs- und Entwurfsdokumentation: Orzesze Jaśkowice-Tychy-Baraniec-KWK Piast-New Bieruń-Oświęcim. Die Projektdokumentation umfasst den Umfang der Arbeiten, die in folgende Abschnitte unterteilt sind: 1: Lk 140 Katowice Ligota-Nędza, Bahnhof Orzesze Jaśkowice, Gleis Nr. 1 von km 21.349 bis km 22,234 l. 0,885 km, LK Nr. 169 Tychy-Orzesze Jaśkowice Gleis Nr. 1 von km 0.549 bis km 17,484 d. 16,935 km.2: Lk 169 Tychy-Orzesze Jaśkowice, Bahnhof Tychy, Gleis Nr. 1 von km -0.246 bis km 0.549, lang. 0,795 km, LK Nr. 179 Tychy-Lędziny-Mysłowice Kosten von km 0,647 bis km 12,250 l. 11,603 km.3: Lk Nr. 179 Tychy-Lędziny-Mysłowice Kosten von km 12,250 bis km 14.560 2,310 km, LK Nr. 885 Nowy Bieruń – KWK Piast – PODG. Baraniec von km 0.00 bis km 5,603 d. 5,603 km, LK Nr. 138 Oświęcim – Nowy Bieruń von km 0,525 bis 4,484 km lang. 3,959 km. (German)
16 December 2021
0 references
Het voorwerp van het project is de voorbereiding van de voorontwerp- en ontwerpdocumentatie die nodig is voor de uitvoering van het project "Regeneratie van spoorlijnen nr. 140/169/179/885/138 van de aansluiting: Orzesze Jaśkowice-Tychy-Baraniec-KWK Piast-Nieuwe Bieruń-Oświęcim. De projectdocumentatie heeft betrekking op de reikwijdte van de werkzaamheden, onderverdeeld in de volgende onderdelen: 1: Lk 140 Katowice Ligota-Nędza, station Orzesze Jaśkowice, spoor nr. 1 van km 21.349 tot km 2,234 l. 0,885 km, LK nr. 169 Tychy-Orzesze Jaśkowice spoor nr. 1 van km 0.549 tot km 17.484 d. 16,935 km.2: Lk 169 Tychy-Orzesze Jaśkowice, Tychy station, spoor nr. 1 van km -0.246 tot km 0.549, lang. 0,795 km, LK nr. 179 Tychy-Lędziny-Mysłowice Kosten van km 0,647 tot km 12,250 l. 11,603 km.3: LK nr. 179 Tychy-Lędziny-Mysłowice Kosten van km 12,250 tot km 14.560 2,310 km, LK nr. 885 Nowy Bieruń — KWK Piast — PODG. Baraniec van km 0.00 tot km 5.603 d. 5,603 km, LK No 138 Oświęcim — Nowy Bieruń van km 0.525 tot 4,484 km lang. 3,959 km. (Dutch)
18 December 2021
0 references
Oggetto del progetto è la preparazione della documentazione di pre-progettazione e progettazione necessaria per la realizzazione del progetto "Rigenerazione delle linee ferroviarie n. 140/169/179/885/138 del collegamento: Orzesze Jaśkowice-Tychy-Baraniec-KWK Piast-Nuova Bieruń-Oświęcim. La documentazione progettuale riguarderà l'ambito delle attività suddivise nelle seguenti sezioni: 1: Lk 140 Katowice Ligota-Nędza, stazione Orzesze Jaśkowice, pista n. 1 dal km 21.349 al km 22,234 l. 0,885 km, LK No 169 Tychy-Orzesze Jaśkowice pista n. 1 dal km 0.549 al km 17,484 d. 16,935 km.2: Lk 169 Tychy-Orzesze Jaśkowice, stazione di Tychy, binario n. 1 dal km -0.246 al km 0.549, lungo. 0,795 km, LK No 179 Tychy-Lędziny-Mysłowice Costo dal km 0.647 al km 12,250 l. 11,603 km.3: Lk No 179 Tychy-Lędziny-Mysłowice Costo dal km 12,250 al km 14.560 2,310 km, LK n. 885 Nowy Bieruń — KWK Piast — PODG. Baraniec dal km 0.00 al km 5.603 d. 5,603 km, LK No 138 Oświęcim — Nowy Bieruń dal km 0.525 a 4,484 km di lunghezza. 3,959 km. (Italian)
15 January 2022
0 references
El objeto del proyecto es la preparación de la documentación previa al diseño y diseño necesaria para la ejecución del proyecto "Regeneración de las líneas ferroviarias n.º 140/169/179/885/138 de la conexión: Orzesze Jaśkowice-Tychy-Baraniec-KWK Piast-New Bieruń-Oświęcim. La documentación del proyecto cubrirá el alcance del trabajo desglosado en las siguientes secciones: 1: Lk 140 Katowice Ligota-Nędza, estación Orzesze Jaśkowice, vía n.º 1 desde el km 21.349 hasta el km 22,234 l. 0,885 km, LK No 169 Tychy-Orzesze Jaśkowice pista n.º 1 desde el km 0.549 hasta el km 17,484 d. 16,935 km.2: Lk 169 Tychy-Orzesze Jaśkowice, estación de Tychy, pista n.º 1 desde el km -0.246 hasta el km 0.549, largo. 0,795 km, LK No 179 Tychy-Lędziny-Mysłowice Costo desde km 0.647 hasta km 12,250 l. 11,603 km.3: Lk No 179 Tychy-Lędziny-Mysłowice Costo desde el km 12.250 hasta el km 14.560 2,310 km, LK n.º 885 Nowy Bieruń — KWK Piast — PODG. Baraniec de km 0.00 a km 5,603 d. 5,603 km, LK No 138 Oświęcim — Nowy Bieruń desde el km 0.525 hasta 4,484 km de largo. 3,959 km. (Spanish)
19 January 2022
0 references
Projekti teemaks on projekti "Raudteeliinide uuendamine nr 140/169/179/885/138: Orzesze JaÅkowice-Tychy-Baraniec-KWK Piast-New BieruÅ-OÅwiÄcim. Projekti dokumentatsioon hõlmab tööde ulatust, mis on jaotatud järgmisteks osadeks: 1: LK 140 Katowice Ligota-NÄdza, Orzesze JaÅkowice jaam, tee nr 1, mis kulgeb 21,349 kmst kuni 22,234 kilomeetrini 0,885 kmni, LK nr 169 Tychy-Orzesze JaÅkowice raudtee nr 10,549 km kuni 17,484 km. 16 935 km²: LK 169 Tychy-Orzesze JaÅkowice, Tychy jaam, rööbastee nr 1: km -0.246 kuni 0,549 km, pikk. 0,795 km, LK nr 179 Tychy-LÄdziny-MysÅowice kulu 0,647 km kuni 12 250 l. 11,603 km.3: LK nr 179 Tychy-LÄdziny-MysÅowice Kulud km 12 250 kuni 14,560 2,310 km, LK nr 885 Nowy BieruÅ âEUR KWK Piast âEUR PODG. Baraniec km 0.00 kuni 5603 d. 5,603 km, LK nr 138 OÅwiÄcim âEUR Nowy BieruÅ km 0,525 kuni 4,484 km pikk. 3,959 km. (Estonian)
28 July 2022
0 references
Projekto objektas – parengiamieji ir projektiniai dokumentai, būtini projektui "Geležinkelio linijų regeneravimas Nr. 140/169/179/885/138: Orzesze JaÅkowice-Tychy-Baraniec-KWK Piast-New BieruÅwiÄcim. Projekto dokumentai apims darbų apimtį, suskirstytą į šiuos skirsnius: 1: Lk 140 Katowice Ligota-NÄdza, Orzesze JaÅkowice stotis, trasa Nr. 1 nuo 21,349 km iki 22,234 l. 0,885 km, LK Nr. 169 Tychy-Orzesze JaÅkowice trasa Nr. 1 nuo 0,549 km iki 17 484 d. 16,935 km.2: LK 169 Tychy-Orzesze JaÅkowice, Tychy stotis, trasa Nr. 1 nuo km -0.246 iki 0,549 km. 0,795 km, LK Nr 179 Tychy-LÄdziny-MysÅowice Kaina nuo 0,647 km iki 12 250 l. 11,603 km.3: LK Nr 179 Tychy-LÄdziny-MysÅowice Kaina nuo 12,250 km iki 14.560 2,310 km, LK Nr. 885 Nowy BieruÅ â EUR KWK Piast â EUR PODG. Baraniec nuo 0,00 km iki 5,603 km 5,603 d. 5,603 km, LK Nr. 138 OÅwiÄcim â EUR Nowy BieruÅ" nuo 0,525 km iki 4,484 km ilgio. 3,959 km. (Lithuanian)
28 July 2022
0 references
Predmet projekta je priprema pred-projektne i projektne dokumentacije potrebne za provedbu projekta "Regeneracija željezničkih pruga br. 140/169/179/885/138 veze: Orzesze JaÅkowice-Tychy-Baraniec-KWK Piast-New BieruÅ-OÅwiÄcim. Projektna dokumentacija obuhvaćat će opseg poslova podijeljen na sljedeće odjeljke: 1: Lk 140 Katowice Ligota-NÄdza, postaja Orzesze JaÅkowice, kolosijek br. 1 od km 21.349 do km 22,234 l. 0,885 km, LK br. 169 Tihi-Orzesze JaÅkowice br. 1 od km 0,549 do km 17.484 d. 16,935 km.2: Lk 169 Tychy-Orzesze JaÅkowice, Tychy stanica, staza br. 1 od km -0.246 do km 0,549, duga. 0,795 km, LK br. 179 Tychy-LÄdziny-MysÅowice Trošak od 0,647 do km 12,250 l. 11,603 km.3: Lk No 179 Tychy-LÄdziny-MysÅowice Trošak od km 12.250 do km 14,560 2,310 km, LK br. 885 Nowy BieruÅEUR KWK Piast â EUR PODG. Baraniec od km 0.00 do km 5,603 d. 5,603 km, LK No 138 OÅwiÄcim â EUR Nowy BieruÅ od km 0,525 do 4,484 km. 3,959 km. (Croatian)
28 July 2022
0 references
Αντικείμενο του έργου είναι η προετοιμασία της τεκμηρίωσης προσχεδιασμού και σχεδιασμού που απαιτείται για την υλοποίηση του έργου "Αναγέννηση σιδηροδρομικών γραμμών αριθ. 140/169/179/885/138 της σύνδεσης: Orzesze JaÅkowice-Tychy-Baraniec-KWK Piast-New BieruÅ-OÅwiÄcim. Η τεκμηρίωση του σχεδίου θα καλύπτει το αντικείμενο των εργασιών που κατανέμονται στα ακόλουθα τμήματα: 1: Lk 140 Katowice Ligota-NÄdza, σταθμός Orzesze JaÅkowice, γραμμή αριθ. 1 από km 21.349 έως km 22,234 l. 0,885 km, LK No 169 Tychy-Orzesze JaÅkowice track no. 1 από km 0.549 έως km 17,484 d. 16,935 km.2: LK 169 Tychy-Orzesze JaÅkowice, Σταθμός Tychy, track no. 1 από km -0.246 έως km 0.549, long. 0,795 km, LK No 179 Tychy-LÄdziny-MysÅowice Κόστος από km 0.647 έως km 12,250 l. 11,603 km.3: LK No 179 Tychy-LÄdziny-MysÅowice Κόστος από km 12,250 έως km 14.560 2,310 km, LK no. 885 Nowy BieruÅ â EUR KWK Piast â EUR PODG. Baraniec από km 0.00 έως km 5,603 d. 5,603 km, LK No 138 OÅwiÄcim â EUR Nowy BieruÅ από km 0.525 έως 4,484 km. 3.959 χλμ. (Greek)
28 July 2022
0 references
Predmetom projektu je príprava predprojektovej a projektovej dokumentácie potrebnej na realizáciu projektu "Regenerácia železničných tratí č. 140/169/179/885/138 prípojky: Orzesze JaÅkowice-Tychy-Baraniec-KWK Piast-New BieruÅ-OÅwiÄcim. Projektová dokumentácia bude zahŕňať rozsah prác rozdelených do týchto oddielov: 1: LK 140 Katowice Ligota-NÄdza, stanica Orzesze JaÅkowice, trať č. 1 od km 21.349 do km 22,234 l. 0,885 km, LK č. 169 Tychy-Orzesze JaÅkowice trať č. 1 od km 0.549 do km 17,484 d. 16,935 km.2: LK 169 Tychy-Orzesze JaÅkowice, stanica Tychy, trať č. 1 od km – 0,246 do km 0.549, dlhá. 0,795 km, LK č. 179 Tychy-LÄdziny-MysÅowice Náklady od km 0,647 do km 12,250 l. 11,603 km.3: LK No 179 Tychy-LÄdziny-MysÅowice Náklady od km 12250 do km 14,560 2,310 km, LK č. 885 Nowy BieruÅ â EUR KWK Piast â EUR PODG. Baraniec od km 0.00 do km 5,603 d. 5,603 km, LK No 138 OÅwiÄcim â EUR Nowy BieruÅ od km 0.525 na 4,484 km dlhé. 3,959 km. (Slovak)
28 July 2022
0 references
Hankkeen aiheena on hankkeen ”Rautateiden uudistaminen nro 140/169/179/885/138: Orzesze JaÅkowice-Tychy-Baraniec-KWK Piast-Uusi BieruÅ-OÅwiÄcim. Hankkeen dokumentaatio kattaa työn laajuuden jaoteltuna seuraaviin osioihin: 1: Lk 140 Katowice Ligota-NÄdza, Orzesze JaÅkowicen asema, rata nro 1 kilometreistä 21,349 km 22 234 l. 0,885 km, LK nro 169 Tychy-Orzesze JaÅkowice rata nro 1 km 0,549 km 17 484 d. 16 935 km: Lk 169 Tychy-Orzesze JaÅkowice, Tychyn asema, rata nro 1 km -0.246 – km 0.549, pitkä. 0,795 km, LK nro 179 Tychy-LÄdziny-MysÅowice Kustannukset välillä 0,647 km – 12 250 l. 11,603 km.3: Lk No 179 Tychy-LÄdziny-MysÅowice Kustannukset alkaen km 12,250 km – 14.560 2,310 km, LK nro 885 Nowy BieruÅ â EUR KWK Piast â EUR PODG. Baraniec alkaen km 0.00-km 5,603 d. 5,603 km, LK No 138 OÅwiÄcim â EUR Nowy BieruÅ alkaen km 0.525–4,484 km pitkä. 3,959 km. (Finnish)
28 July 2022
0 references
A projekt tárgya az 140/169/179/885/138 számú vasútvonal felújítása projekt megvalósításához szükséges előzetes tervezési és tervezési dokumentáció elkészítése: Orzesze Jakowice-Tychy-Baraniec-KWK Piast-Új BieruÅ-OwiÄcim. A projektdokumentáció az alábbi szakaszokra bontott tevékenységi körre terjed ki: 1: Lk 140 Katowice Ligota-NÄdza, Orzesze Jakowice állomás, az 1-es vágány a 21,349 km-től a 22,234 l. km-ig. 0,885 km, LK 169 Tychy-Orzesze Jakowice pálya 1. km 0,549 km-től 17,484 km-ig. 16,935 km.2: Lk 169 Tychy-Orzesze Jakowice, Tychy állomás, 1-es nyomvonal -0,246 km-től 0,549 km-ig, hosszú. 0,795 km, LK No 179 Tychy-LÄdziny-MysÅowice Költség km-től 0,647 km-ig 12 250 l-ig. 11,603 km.3: Lk No 179 Tychy-LÄdziny-MysÅowice Költség km 12,250 km 14.560 2,310 km, LK no. 885 Nowy BieruÅ â EUR KWK Piast â EUR PODG. Baraniec km 0,00 km-től 5,603 km-ig, LK No 138 OÅwiÄcim âEUR Nowy BieruÅ km 0.525 4,484 km hosszú. 3 959 km. (Hungarian)
28 July 2022
0 references
Předmětem projektu je příprava předprojektové a projektové dokumentace nezbytné pro realizaci projektu "Regenerace železničních tratí č. 140/169/179/885/138 spoje: Orzesze Jakowice-Tychy-Baraniec-KWK Piast-Nový BieruÅwičcim. Projektová dokumentace bude zahrnovat rozsah prací rozdělených do následujících oddílů: 1: Lk 140 Katowice Ligota-NÄdza, stanice Orzesze Jakowice, trať č. 1 od km 21,349 do km 22,234 l. 0,885 km, LK No 169 Tychy-Orzesze Jakowice kolej č. 1 od km 0.549 do km 17,484 d. 16,935 km.2: Lk 169 Tychy-Orzesze Jakowice, stanice Tychy, trať č. 1 od km -0,246 do km 0.549, dlouhá. 0,795 km, LK č. 179 Tychy-LÄdziny-MysÅowice Náklady od km 0,647 do km 12 250 l. 11,603 km.3: Lk No 179 Tychy-LÄdziny-MysÅowice Náklady od km 12,250 do km 14,560 2,310 km, LK č. 885 Nowy BieruÅ â EUR KWK Piast â EUR PODG. Baraniec od km 0.00 do km 5,603 d. 5,603 km, LK No 138 OÅwiÄcim › Nowy BieruÅ od km 0.525 to 4,484 km. 3,959 km. (Czech)
28 July 2022
0 references
Projekta priekšmets ir projekta “Dzelzceļa līniju atjaunošana Nr. 140/169/179/885/138” īstenošanai nepieciešamās priekšprojektēšanas un projektēšanas dokumentācijas sagatavošana: Orzesze Jaukowice-Tychy-Baraniec-KWK Piast-New BieruÅ-OÅwiÄcim. Projekta dokumentācija aptvers darba jomu, kas iedalīta šādās sadaļās: 1: LK 140 Katowice Ligota-NÄdza, Orzesze JaÅkowice stacija, 1. trase no 21,349 km līdz 22,234 l. 0,885 km, LK Nr. 169 Tychy-Orzesze JaÅkowice trase Nr. 1 no 0,549 km līdz 17,484 d. 16,935 km: LK 169 Tychy-Orzesze JaÅkowice, Tychy stacija, trase Nr. 1 no km -0.246 līdz km 0.549, garš. 0,795 km, LK Nr. 179 Tychy-LÄdziny-MysÅowice Izmaksas no 0,647 km līdz 12,250 l. 11,603 km.3: Lv No 179 Tychy-LÄdziny-MysÅowice Izmaksas no km 12,250 līdz km 14.560 2,310 km, LK Nr. 885 Nowy BieruÅ EUR KWK Piast EUR PODG. Baraniec no km 0.00 līdz km 5,603 d. 5,603 km, LK No 138 OÅwiÄcim EUR Nowy BieruÅ no km 0.525 līdz 4,484 km garš. 3 959 km. (Latvian)
28 July 2022
0 references
Is é ábhar an tionscadail ullmhú na doiciméadachta réamhdheartha agus deartha is gá chun an tionscadal a chur chun feidhme "Athghiniúint línte iarnróid Uimh. 140/169/179/885/138 den nasc: Orzesze JaÅkowice-Tychy-Baraniec-KWK Piast-New BieruÅ-OÅwiÄcim. Clúdóidh doiciméadú an tionscadail raon feidhme na hoibre agus iad miondealaithe sna ranna seo a leanas: 1: LK 140 Katowice Ligota-NÄdza, stáisiún Orzesze JaÅkowice, rianú uimh. 1 ó km 21.349 go km 22.234 l. 0.885 km, LK Uimh 169 Tychy-Orzesze JaÅkowice rian uimh. 1 ó km 0.549 go km 17,484 d. 16.935 km.2: LK 169 Tychy-Orzesze JaÅkowice, stáisiún Tychy, rianú uimh. 1 ó km -0.246 go km 0.549, fada. 0.795 km, LK Uimh. 179 Tychy-LÄdziny-MysÅowice Costas ó km 0.647 go km 12.250 l. 11.603 km.3: LK Uimh 179 Tychy-LÄdziny-MysÅowice Costas ó km 12,250 go dtí km 14.560 2.310 km, LK uimh. 885 Anois BieruÅ â EUR KWK Piast â EUR podg. Baraniec ó km 0.00 go km 5,603 d. 5.603 km, LK Uimh 138 OžwiÄcim â EUR Anois BieruÅ km 0.525 go 4.484 km ar fhad. 3.959 km. (Irish)
28 July 2022
0 references
Predmet projekta je priprava predprojektne in projektne dokumentacije, potrebne za izvedbo projekta "Regeneracija železniških prog št. 140/169/179/885/138 povezave: Orzesze JaÅkowice-Tychy-Baraniec-KWK Piast-New BieruÅ-OÅwiÄcim. Projektna dokumentacija bo zajemala obseg dela, razdeljen na naslednje oddelke: 1: Lk 140 Katowice Ligota-NÄdza, postaja Orzesze JaÅkowice, proga št. 1 od km 21.349 do km 22,234 l. 0,885 km, LK št. 169 Tychy-Orzesze JaÅkowice št. 1 od km 0.549 do km 17.484 d. 16,935 km.2: Lk 169 Tychy-Orzesze JaÅkowice, postaja Tychy, proga št. 1 od km -0.246 do km 0.549, dolga. 0,795 km, LK št. 179 Tychy-LÄdziny-MysÅowice Stroški od km 0.647 do km 12,250 l. 11,603 km.3: Lk No 179 Tychy-LÄdziny-MysÅowice Stroški od km 12,250 do km 14.560 2,310 km, LK št. 885 Nowy BieruÅ â EUR KWK Piast â EUR PODG. Baraniec od km 0.00 do km 5,603 d. 5,603 km, LK št 138 OÅwiÄcim â EUR Nowy BieruÅ od km 0.525 do 4,484 km dolge. 3,959 km. (Slovenian)
28 July 2022
0 references
Предмет на проекта е подготовката на предварителната и проектна документация, необходима за изпълнението на проект "Възстановяване на железопътни линии № 140/169/179/885/138 на връзката: Orzesze JaÅkowice-Tychy-Baraniec-KWK Piast-New BieruÅÅwiÄcim. Проектната документация ще обхваща обхвата на работата, разбита в следните раздели: 1: Lk 140 Katowice Ligota-NÄdza, гара Orzesze JaÅkowice, писта № 1 от km 21.349 до km 22,234 l. 0,885 km, LK № 169 Tychy-Orzesze JaÅkowice № 1 от km 0.549 до km 17,484 d. 16,935 km.2: Lk 169 Tychy-Orzesze JaÅkowice, гара Tychy, писта № 1 от km -0.246 до km 0.549, дълга. 0,795 km, LK № 179 Tychy-LÄdziny-MysÅowice Цена от km 0.647 до km 12,250 l. 11,603 km.3: Lk № 179 Tychy-LÄdziny-MysÅowice Цена от km 12,250 до km 14.560 2,310 km, LK № 885 Nowy BieruÅ â EUR KWK Piast â EUR PODG. Baraniec от km 0.00 до km 5,603 d. 5,603 km, LK № 138 OÅwiÄcim â EUR Nowy BieruÅ от km 0.525 до 4,484 km дължина. 3 959 км. (Bulgarian)
28 July 2022
0 references
Is-suġġett tal-proġett huwa t-tħejjija tad-dokumentazzjoni ta’ qabel id-disinn u d-disinn meħtieġa għall-implimentazzjoni tal-proġett "Riġenerazzjoni tal-linji ferrovjarji Nru 140/169/179/885/138 tal-konnessjoni: Orzesze JaÅkowice-Tychy-Baraniec-KWK Piast-New BieruÅ-OÅwiÄcim. Id-dokumentazzjoni tal-proġett se tkopri l-ambitu tax-xogħol maqsum fit-taqsimiet li ġejjin: 1: Lk 140 Katowice Ligota-NÄdza, l-istazzjon Orzesze JaÅkowice, binarju nru 1 minn km 21.349 għal km 22.234 l. 0.885 km, LK Nru 169 Tychy-Orzesze JaÅkowice binarju nru 1 minn km 0.549 sa km 17,484 d. 16.935 km.2: Lk 169 Tychy-Orzesze JaÅkowice, istazzjon Tychy, track no 1 minn km -0.246 għal km 0.549, twil. 0.795 km, LK Nru 179 Tychy-LÄdziny-MysÅowice Spiża minn km 0.647 għal km 12.250 l. 11.603 km.3: LK Nru 179 Tychy-LÄdziny-MysÅowice Spiża minn 12.250 km 14.560 2.310 km, LK nru 885 Nowy BieruÅ â EUR KWK Piast â EUR PODG. Baraniec minn km 0.00 għal km 5,603 d. 5.603 km, LK No 138 OÅwiÄcim â EUR Nowy BieruÅ minn km 0.525 sa 4.484 km twil. 3.959 km. (Maltese)
28 July 2022
0 references
O objeto do projeto é a preparação da documentação de pré-conceção e conceção necessária para a execução do projeto "Regeneração das linhas ferroviárias n.º 140/169/179/885/138 da ligação: Orzesze JaÅkowice-Tychy-Baraniec-KWK Piast-New BieruÅ-OÅwiÄcim. A documentação do projeto abrangerá o âmbito dos trabalhos repartidos nas seguintes secções: 1: Lk 140 Katowice Ligota-NÄdza, Estação Orzesze JaÅkowice, pista n.º 1 do km 21.349 até km 22,234 l. 0,885 km, LK No 169 Tychy-Orzesze JaÅkowice pista n.º 1 do km 0.549 até km 17,484 d. 16,935 km.2: Lk 169 Tychy-Orzesze JaÅkowice, estação Tychy, pista n.º 1 de km -0.246 a km 0.549, de comprimento. 0,795 km, LK No 179 Tychy-LÄdziny-MysÅowice Custo de km 0.647 até km 12,250 l. 11,603 km.3: Lk No 179 Tychy-LÄdziny-MysÅowice Custo de km 12,250 a km 14.560 2,310 km, LK n.º 885 Nowy BieruÅ âEUR KWK Piast âEUR PODG. Baraniec do km 0.00 a km 5.603 d. 5,603 km, LK No 138 OÅwiÄcim âEUR Nowy BieruÅ do km 0.525 a 4,484 km de comprimento. 3 959 km. (Portuguese)
28 July 2022
0 references
Formålet med projektet er at udarbejde den præ-design- og designdokumentation, der er nødvendig for gennemførelsen af projektet "Regenerering af jernbanestrækninger nr. 140/169/179/885/138 af forbindelsen: Orzesze Jakowice-Tychy-Baraniec-KWK Piast-Nye BieruÅ-OÅwiÄcim. Projektdokumentationen dækker arbejdets omfang fordelt på følgende afsnit: 1: Lk 140 Katowice Ligota-NÄdza, Orzesze Jakowice station, spor nr. 1 fra km 21.349 til km 22,234 l. 0,885 km, LK No 169 Tychy-Orzesze JaÅkowice spor nr. 1 fra km 0.549 til km 17,484 d. 16,935 km.2: Lk 169 Tychy-Orzesze JaÅkowice, Tychy Station, spor nr. 1 fra km -0.246 til km 0.549, lang. 0,795 km, LK No 179 Tychy-LÄdziny-MysÅowice Omkostninger fra km 0.647 til km 12,250 l. 11,603 km.3: Lk No 179 Tychy-LÄdziny-MysÅowice Omkostninger fra km 12,250 til km 14.560 2,310 km, LK nr. 885 Nowy BieruÅ EUR KWK Piast â EUR PODG. Baraniec fra km 0.00 til km 5,603 d. 5,603 km, LK No 138 OÅwiÄcim â EUR Nowy BieruÅ fra km 0.525 til 4,484 km lang. 3 959 km. (Danish)
28 July 2022
0 references
Obiectul proiectului este pregătirea documentației de proiectare prealabilă și proiectare necesară pentru implementarea proiectului "Regenerarea liniilor de cale ferată nr. 140/169/179/885/138 al conexiunii: Orzesze JaÅkowice-Tychy-Baraniec-KWK Piast-Noua BieruÅ-OÅwiÄcim. Documentația proiectului va acoperi domeniul de activitate defalcat în următoarele secțiuni: 1: 140 Katowice Ligota-NÄdza, stația Orzesze JaÅkowice, pista nr. 1 de la km 21.349 la km 22,234 l. 0,885 km, LK nr. 169 Tychy-Orzesze JaÅkowice nr. 1 de la km 0,549 la km 17,484 d. 16,935 km.2: Lk 169 Tychy-Orzesze JaÅkowice, stația Tychy, pista nr. 1 de la km -0.246 la km 0.549, lungime. 0,795 km, nr. 179 LK Tychy-LÄdziny-MysÅowice Cost de la km 0,647 la km 12,250 l. 11,603 km.3: LK No 179 Tychy-LÄdziny-MysÅowice Costul de la km 12,250 la km 14.560 2,310 km, LK nr. 885 Nowy BieruÅ â EUR KWK Piast â EUR PODG. Baraniec de la km 0.00 la km 5,603 d. 5,603 km, LK No 138 OÅwiÄcim â EUR Nowy BieruÅ de la km 0,525 la 4,484 km lungime. 3,959 km. (Romanian)
28 July 2022
0 references
Syftet med projektet är att utarbeta den förutformning och konstruktionsdokumentation som krävs för genomförandet av projektet ”Regenerering av järnvägslinjer nr 140/169/179/885/138 av förbindelsen: Orzesze JaÅkowice-Tychy-Baraniec-KWK Piast-New BieruÅ-OÅwiÄcim. Projektdokumentationen kommer att omfatta arbetets omfattning uppdelat i följande avsnitt: 1: Lk 140 Katowice Ligota-NÄdza, Orzesze JaÅkowice station, spår nr 1 från km 21.349 till km 22,234 l. 0,885 km, LK No 169 Tychy-Orzesze JaÅkowice spår nr 1 från km 0,549 till km 17,484 d. 16 935 km.2: Lk 169 Tychy-Orzesze JaÅkowice, Tychy station, spår nr 1 från km -0.246 till km 0.549, lång. 0,795 km, LK nr 179 Tychy-LÄdziny-MysÅowice Kostnad från km 0,647 till km 12 250 l. 11,603 km.3: Lk No 179 Tychy-LÄdziny-MysÅowice Kostnad från km 12,250 till km 14.560 2,310 km, LK nr 885 Nowy BieruÅ â EUR KWK Piast â EUR PODG. Baraniec from km 0.00 to km 5,603 d. 5,603 km, LK No 138 OÅwiÄcim â EUR Nowy BieruÅ från km 0,525 till 4,484 km lång. 3,959 km. (Swedish)
28 July 2022
0 references
WOJ.: ŚLĄSKIE, POW.: Sosnowiec
0 references
Identifiers
RPSL.06.02.00-24-0346/19
0 references