Works on railway line No. 219 on the Szczytno-Ełk section (Q88502): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,)
(‎Changed an Item: Change because item Q2515024 was merged with Q2518853)
Property / beneficiaryProperty / beneficiary
Q2515024 (Deleted Item)

Revision as of 10:07, 27 September 2022

Project Q88502 in Poland
Language Label Description Also known as
English
Works on railway line No. 219 on the Szczytno-Ełk section
Project Q88502 in Poland

    Statements

    0 references
    262,027,757.38 zloty
    0 references
    62,886,661.77 Euro
    13 January 2020
    0 references
    308,267,949.87 zloty
    0 references
    73,984,307.97 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    20 December 2016
    0 references
    31 March 2020
    0 references
    PKP POLSKIE LINIE KOLEJOWE S.A.
    0 references
    Projekt Prace na linii kolejowej nr 219 na odcinku Szczytno - Ełk obejmuje: Prace infrastrukturalne, obejmujące rehabilitację linii nr 219 na odcinku od km 45,823 do km 156,950, to jest o długości 111,127 km (wg istniejącego kilometrażu), przy czym, w wyniku przebudowy układu torowego na stacji Ełk, planowana finalna długość zrehabilitowanego odcinka linii nr 219 wynosić będzie 111,069 km; Prace dworcowe, obejmujące przebudowę dworca w Szczytnie wraz z budową parkingu Park&Ride. Prace infrastrukturalne obejmują przywrócenie pierwotnych parametrów technicznych linii wraz dostosowaniem elementów infrastruktury do potrzeb osób o ograniczonej możliwości ruchowej. W ramach Projektu wykonane zostaną m.in. następujące roboty budowlane: • wymiana nawierzchni torowej na całej długości linii, • wymiana rozjazdów w torach szlakowych oraz głównych zasadniczych, • prace budowlane na obiektach inżynieryjnych, w tym rozbiórka i odbudowa 2 mostów, • likwidacja 11 przejazdów kolejowych, • modernizacja 89 przejazdów kolejowych, w tym podniesienie kategorii na 13 przejazdach, • likwidacja 1 przystanku osobowego, • modernizacja obiektów obsługi podróżnych (14 przystanków osobowych i 4 stacji), w tym zmiana 2 przystanków osobowych na stacje, • budowa 1 przystanku osobowego, • przebudowa 18 peronów i budowa 1 peronu wraz z infrastrukturą spełniającą wymogi TSI, • modernizacja urządzeń srk. (Polish)
    0 references
    Project Works on the railway line No. 219 on the Szczytno-Ełk section includes: Infrastructure works, including rehabilitation of line No. 219 in the section from km 45.823 to km 156.950, i.e. 111.127 km long (according to the existing kilometre), the planned final length of the rehabilitated section of line 219 will be 111,069 km as a result of the reconstruction of the track system at Ełk station; The station works, including the reconstruction of the station in Szczytno with the construction of the Park &Ride parking lot. Infrastructure works include the restoration of the original technical parameters of the line with the adaptation of infrastructure elements to the needs of people with reduced mobility. As part of the project, the following construction works will be carried out: • replacement of track pavement on the entire length of the line, • replacement of switches in the tracks and the main basic, • construction works on engineering facilities, including demolition and reconstruction of 2 bridges, • liquidation of 11 railway crossings, • modernisation of 89 railway crossings, including construction of the category on 13 crossings, • removal of 1 passenger stops, • modernisation of passenger facilities (14 passenger platforms and 4 stations), (English)
    14 October 2020
    0 references
    Les travaux sur la ligne de chemin de fer no 219 sur le tronçon Szczytno — Ełk comprennent: Les travaux d’infrastructure, y compris la remise en état de la ligne 219 du km 45 823 au km 156.950, c’est-à-dire 111,127 km (selon le kilomètre existant), avec la longueur finale prévue du tronçon de la ligne 219 réhabilité à la suite de la reconstruction du réseau de voies à la gare d’Ełk; Travaux de gare, y compris la reconstruction de la gare de Szczytno, ainsi que la construction du parking Park&Ride. Les travaux d’infrastructure comprennent la restauration des paramètres techniques d’origine de la ligne et l’adaptation de l’infrastructure aux besoins des personnes à mobilité réduite. Les travaux de construction suivants seront réalisés dans le cadre du projet: • remplacement de la surface de la voie sur toute la longueur de la ligne, • remplacement des branchements sur les voies et les principaux principaux, • travaux de construction d’installations d’ingénierie, y compris démolition et reconstruction de 2 ponts, • démantèlement de 11 passages à niveau, • modernisation de 89 passages à niveau, y compris relèvement de la catégorie de 13 passages à niveau, • déclassement d’un arrêt de passagers, • modernisation des installations destinées aux passagers (14 arrêts passagers et 4 gares), y compris le changement de 2 arrêts passagers en gares, • construction d’un arrêt passagers, • reconstruction de 18 quais et construction de quai 1 avec une infrastructure conforme aux STI, • modernisation de l’équipement de la gare. (French)
    30 November 2021
    0 references
    Projekt Die Arbeiten auf der Eisenbahnlinie 219 auf dem Abschnitt Szczytno – Ełk umfassen: Infrastrukturarbeiten, einschließlich der Sanierung der Linie 219 von km 45,823 bis km 156.950, d. h. 111,127 km (entsprechend dem bestehenden Kilometer) mit der geplanten Endlänge des rehabilitierten Abschnitts der Linie 219 infolge des Umbaus des Gleissystems am Bahnhof Ełk; Bahnhofsarbeiten, einschließlich des Umbaus des Bahnhofs in Szczytno, zusammen mit dem Bau des Parks&Ride Parkplatz. Zu den Infrastrukturarbeiten gehören die Wiederherstellung der ursprünglichen technischen Parameter der Strecke und die Anpassung der Infrastruktur an die Bedürfnisse von Personen mit eingeschränkter Mobilität. Im Rahmen des Projekts werden folgende Bauarbeiten durchgeführt: • Ersetzung der Gleisfläche über die gesamte Länge der Strecke, • Ersetzung der Weichen auf den Gleisen und Hauptstrecken, • Bauarbeiten an technischen Anlagen, einschließlich Abriss und Wiederaufbau von 2 Brücken, • Stilllegung von 11 Bahnübergängen, • Modernisierung von 89 Bahnübergängen, einschließlich Erhöhung der Kategorie von 13 Kreuzungen, • Stilllegung von 1 Fahrgast-Haltestelle, • Modernisierung von Personenverkehrseinrichtungen (14 Fahrgasthaltestellen und 4 Stationen), einschließlich des Wechsels von 2 Haltestellen für Fahrgäste, • Bau von 1 Passagierstopp, • Umbau von 18 Plattformen und Bau von Plattform 1 mit TSI-konformer Infrastruktur, • Modernisierung der Stationsausstattung. (German)
    7 December 2021
    0 references
    Projectwerkzaamheden aan spoorlijn nr. 219 op het traject Szczytno — Ełk omvatten: Infrastructuurwerkzaamheden, met inbegrip van het herstel van lijn 219 van km 45.823 tot km 156 950, d.w.z. 111,127 km (volgens de bestaande kilometer), met de geplande eindlengte van het herstelde gedeelte van lijn 219 als gevolg van de wederopbouw van het spoorsysteem in het station Ełk; Stationwerkzaamheden, met inbegrip van de wederopbouw van het station in Szczytno, samen met de bouw van de Park&Ride parkeerplaats. De infrastructuurwerkzaamheden omvatten het herstel van de oorspronkelijke technische parameters van de lijn en het aanpassen van de infrastructuur aan de behoeften van personen met beperkte mobiliteit. De volgende bouwwerkzaamheden zullen in het kader van het project worden uitgevoerd: • vervanging van het spooroppervlak over de gehele lengte van de lijn, • vervanging van de opkomsten op de sporen en de belangrijkste baanvakken, • bouwwerkzaamheden aan technische voorzieningen, met inbegrip van sloop en wederopbouw van 2 bruggen, • buitenbedrijfstelling van 11 spoorwegovergangen, • modernisering van 89 spoorwegovergangen, met inbegrip van het verhogen van de categorie van 13 kruisingen, • buitenbedrijfstelling van 1 passagiershalte, • verbetering van de passagiersvoorzieningen (14 passagiersstops en 4 stations), met inbegrip van de overschakeling van 2 haltes voor reizigers naar stations, • de bouw van 18 perrons en de bouw van platform 1 met TSI-conforme infrastructuur, • verbetering van de stationsuitrusting. (Dutch)
    16 December 2021
    0 references
    Progetto La linea ferroviaria n. 219 sulla tratta Szczytno — Ełk comprende: Lavori infrastrutturali, compreso il ripristino della linea 219 dal km 45.823 al km 156.950, ossia 111,127 km (secondo il chilometro esistente), con la lunghezza finale prevista del tratto riabilitato della linea 219 a seguito della ricostruzione del sistema di binari nella stazione di Ełk; Lavori della stazione, compresa la ricostruzione della stazione ferroviaria di Szczytno, insieme alla costruzione del parcheggio Park&Ride. I lavori infrastrutturali comprendono il ripristino dei parametri tecnici originali della linea e l'adeguamento dell'infrastruttura alle esigenze delle persone a mobilità ridotta. Nell'ambito del progetto saranno realizzati i seguenti lavori di costruzione: • sostituzione della superficie del binario su tutta la lunghezza della linea, • sostituzione delle affluenze sui binari e sui principali binari, • lavori di costruzione di impianti di ingegneria, compresa la demolizione e la ricostruzione di 2 ponti, • smantellamento di 11 passaggi a livello, • ammodernamento di 89 passaggi a livello, compresa l'aumento della categoria di 13 attraversamenti, • smantellamento di 1 fermata passeggeri, • ammodernamento di strutture passeggeri (14 fermate passeggeri e 4 stazioni), compreso il cambiamento di 2 fermate passeggeri in stazioni, • costruzione di 1 fermata passeggeri, • ricostruzione di 18 piattaforme e costruzione della piattaforma 1 con infrastrutture conformi alle STI, • potenziamento delle attrezzature delle stazioni. (Italian)
    16 January 2022
    0 references
    Proyecto Trabajo en la línea ferroviaria n.º 219 en el tramo Szczytno — Ełk incluye: Obras de infraestructura, incluida la rehabilitación de la línea 219 desde el km 45.823 hasta el km 156.950, es decir, 111,127 km (según el kilómetro existente), con la longitud final prevista del tramo rehabilitado de la línea 219 como resultado de la reconstrucción del sistema de vías en la estación de Ełk; Obras de la estación, incluida la reconstrucción de la estación ferroviaria de Szczytno, junto con la construcción del aparcamiento Park&Ride. Las obras de infraestructura incluyen la restauración de los parámetros técnicos originales de la línea y la adaptación de la infraestructura a las necesidades de las personas con movilidad reducida. En el marco del proyecto se llevarán a cabo las siguientes obras de construcción: • sustitución de la superficie de la vía a lo largo de toda la línea, • sustitución de las desviaciones en las vías y las principales, • trabajos de construcción de instalaciones de ingeniería, incluida la demolición y reconstrucción de 2 puentes, • desmantelamiento de 11 pasos a nivel, • modernización de 89 pasos a nivel, incluida la elevación de la categoría de 13 cruces, • desmantelamiento de 1 parada de pasajeros, • mejora de las instalaciones para pasajeros (14 paradas de pasajeros y 4 estaciones), incluyendo el cambio de 2 paradas de pasajeros a estaciones, • construcción de 1 parada de pasajeros, • reconstrucción de 18 plataformas y construcción de la plataforma 1 con infraestructura conforme a la ETI, • mejora del equipamiento de la estación. (Spanish)
    19 January 2022
    0 references
    Projektarbejder på jernbanelinje nr. 219 på strækningen Szczytno-EÅk omfatter: Infrastrukturarbejder, herunder istandsættelse af linje nr. 219 på strækningen fra km 45,823 til km 156.950, dvs. 111,127 km lang (ifølge den eksisterende kilometer), vil den planlagte endelige længde af den rehabiliterede strækning på linje 219 være 111,069 km som følge af rekonstruktionen af sporsystemet på EÅk-stationen. Stationen arbejder, herunder genopbygning af stationen i Szczytno med opførelsen af Park &Ride parkeringsplads. Infrastrukturarbejder omfatter genoprettelse af strækningens oprindelige tekniske parametre med tilpasning af infrastrukturelementer til bevægelseshæmmede personers behov. Som led i projektet vil følgende bygge- og anlægsarbejder blive udført: udskiftning af sporfortovet på hele strækningens længde, â EUR ¢ udskiftning af sporskifter og de vigtigste grundlæggende, â EUR ¢ anlægsarbejder på ingeniørfaciliteter, herunder nedrivning og ombygning af 2 broer, â EUR ¢ afvikling af 11 jernbaneoverskæringer, â EUR ¢ modernisering af 89 jernbaneoverskæringer, herunder opførelse af kategorien på 13 krydsninger, â EUR ¢ fjernelse af 1 passagerstop,â EUR ¢ modernisering af passagerfaciliteter (14 passagerperroner og 4 stationer), (Danish)
    26 July 2022
    0 references
    Το έργο στη σιδηροδρομική γραμμή αριθ. 219 στο τμήμα Szczytno-EÅk περιλαμβάνει: Έργα υποδομής, συμπεριλαμβανομένης της αποκατάστασης της γραμμής αριθ. 219 στο τμήμα από το km 45,823 έως το km 156.950, δηλ. μήκους 111,127 km (σύμφωνα με το υφιστάμενο χιλιόμετρο), το προβλεπόμενο τελικό μήκος του αποκατεστημένου τμήματος της γραμμής 219 θα είναι 111,069 km ως αποτέλεσμα της ανακατασκευής του συστήματος τροχιάς στον σταθμό EÅk· Ο σταθμός λειτουργεί, συμπεριλαμβανομένης της ανακατασκευής του σταθμού στο Szczytno με την κατασκευή του Park &Ride πάρκινγκ. Τα έργα υποδομής περιλαμβάνουν την αποκατάσταση των αρχικών τεχνικών παραμέτρων της γραμμής με την προσαρμογή των στοιχείων υποδομής στις ανάγκες των ατόμων με μειωμένη κινητικότητα. Στο πλαίσιο του έργου, θα εκτελεστούν οι ακόλουθες κατασκευαστικές εργασίες: αντικατάσταση του πεζοδρομίου σε όλο το μήκος της γραμμής, αντικατάσταση των διακοπτών στις γραμμές και το κύριο βασικό, â EUR â EUR ¢ κατασκευαστικές εργασίες σε εγκαταστάσεις μηχανικού, συμπεριλαμβανομένης της κατεδάφισης και ανακατασκευής των 2 γεφυρών, â EUR’ εκκαθάριση 11 σιδηροδρομικών διασταυρώσεων, â EUR’ εκσυγχρονισμός 89 σιδηροδρομικών διασταυρώσεων, συμπεριλαμβανομένης της κατασκευής της κατηγορίας σε 13 διαβάσεις, â EUR’ απομάκρυνση 1 στάσεις επιβατών, â EUR â εκσυγχρονισμός των εγκαταστάσεων επιβατών (14 επιβατικές πλατφόρμες και 4 σταθμούς), (Greek)
    26 July 2022
    0 references
    Projektni radovi na željezničkoj pruzi br. 219 na dionici Szczytno-EÅk uključuju: Infrastrukturni radovi, uključujući obnovu pruge br. 219 na dionici od 45,823 do km 156.950, tj. 111,127 km (prema postojećem kilometru), planirana konačna duljina obnovljene dionice pruge 219 bit će 111,069 km kao rezultat rekonstrukcije kolosiječnog sustava na stanici EÅk; Radovi na stanici, uključujući rekonstrukciju stanice u Szczytno s izgradnjom Park &Ride parkiralište. Infrastrukturni radovi uključuju obnovu izvornih tehničkih parametara pruge s prilagodbom infrastrukturnih elemenata potrebama osoba smanjene pokretljivosti. U okviru projekta provest će se sljedeći građevinski radovi: zamjena kolosiječnog kolnika na cijeloj duljini pruge, zamjena skretnica na tračnicama i glavni osnovni građevinski radovi na inženjerskim objektima, uključujući rušenje i rekonstrukciju 2 mostova, â EUR Recenzije likvidacija 11 željezničkih prijelaza, modernizacija 89 željezničkih prijelaza, uključujući izgradnju kategorije na 13 prijelazima, â EUR Recenzije uklanjanje 1 putničkih stanica, â EUR Recenzije modernizacija putničkih objekata (14 putničkih perona i 4 kolodvora), (Croatian)
    26 July 2022
    0 references
    Lucrările de proiect pe linia de cale ferată nr. 219 pe tronsonul Szczytno-EÅk includ: Lucrări de infrastructură, inclusiv reabilitarea liniei nr. 219 din tronsonul de la km 45.823 la km 156.950, adică 111,127 km lungime (conform kilometrului existent), lungimea finală planificată a tronsonului reabilitat din linia 219 va fi de 111,069 km ca urmare a reconstrucției sistemului de cale ferată la stația EÅk; Stația funcționează, inclusiv reconstrucția stației din Szczytno cu construcția parcării Park &Ride. Lucrările de infrastructură includ restaurarea parametrilor tehnici originali ai liniei de adaptare a elementelor de infrastructură la nevoile persoanelor cu mobilitate redusă. În cadrul proiectului, vor fi efectuate următoarele lucrări de construcție: înlocuirea pavajului de cale ferată pe întreaga lungime a liniei, înlocuirea aparatelor de cale ferată și a principalelor lucrări de construcție a instalațiilor de inginerie, inclusiv demolarea și reconstrucția a două poduri, lichidarea a 11 treceri feroviare, modernizarea a 89 de treceri feroviare, inclusiv construirea categoriei pe 13 treceri, eliminarea a 1 stații de pasageri, modernizarea instalațiilor pentru călători (14 peroane pentru călători și 4 gări); (Romanian)
    26 July 2022
    0 references
    Projektové práce na železničnej trati č. 219 na úseku Szczytno-EÅk zahŕňajú: Práce na infraštruktúre vrátane obnovy trate č. 219 v úseku z km 45,823 na km 156.950, t. j. 111,127 km dlhá (podľa existujúceho kilometra), plánovaná konečná dĺžka obnoveného úseku trate 219 bude 111 069 km v dôsledku rekonštrukcie traťového systému na stanici EÅk; Stanica pracuje, vrátane rekonštrukcie stanice v Szczytno s výstavbou parku &Ride parkovisko. Práce na infraštruktúre zahŕňajú obnovu pôvodných technických parametrov trate s prispôsobením prvkov infraštruktúry potrebám ľudí so zníženou pohyblivosťou. V rámci projektu sa uskutočnia tieto stavebné práce: výmena chodníkov na celej dĺžke trate, výmena výhybiek na trati a hlavné základné, â EUR ¢ stavebné práce na inžinierskych zariadeniach, vrátane demolácie a rekonštrukcie 2 mostov, â EUR ¢ likvidácia 11 železničných križovatiek, â EUR ¢ modernizácia 89 železničných križovatiek, vrátane výstavby kategórie na 13 križovatkách, â EUR ¢ odstránenie 1 zastávok pre cestujúcich, â EUR ¢ modernizácia zariadení pre cestujúcich (14 osobných nástupíšť a 4 stanice), (Slovak)
    26 July 2022
    0 references
    Proġett Xogħlijiet fuq il-linja ferrovjarja Nru 219 fuq is-sezzjoni Szczytno-EÅk jinkludu: Xogħlijiet ta’ infrastruttura, inkluża r-riabilitazzjoni tal-linja Nru 219 fis-sezzjoni minn km 45.823 għal km 156.950, jiġifieri tul 111.127 km (skont il-kilometru eżistenti), it-tul finali ppjanat tas-sezzjoni riabilitata tal-linja 219 se jkun 111.069 km bħala riżultat tar-rikostruzzjoni tas-sistema tal-binarji fl-istazzjon ta’ EÅk; L-istazzjon xogħlijiet, inkluża r-rikostruzzjoni ta ‘l-istazzjon fil Szczytno mal-kostruzzjoni tal-Park &Lott ta’ parkeġġ Ride. Ix-xogħlijiet infrastrutturali jinkludu r-restawr tal-parametri tekniċi oriġinali tal-linja bl-adattament tal-elementi infrastrutturali għall-ħtiġijiet tal-persuni b’mobbiltà mnaqqsa. Bħala parti mill-proġett, se jitwettqu x-xogħlijiet ta’ kostruzzjoni li ġejjin: â EUR¢ sostituzzjoni tal-bankina binarji fuq it-tul kollu tal-linja, â EUR ¢ sostituzzjoni ta ‘swiċċijiet fil-binarji u l-prinċipali bażiċi, xogħlijiet ta’ kostruzzjoni fuq faċilitajiet ta ‘inġinerija, inklużi demolizzjoni u r-rikostruzzjoni ta’ 2 pontijiet, â EUR likwidazzjoni ta ‘11 qsim tal-ferrovija, â EUR modernizzazzjoni ta’89 qsim tal-ferrovija, inkluża l-kostruzzjoni tal-kategorija fuq 13 qsim, â EUR¢ tneħħija ta ‘waqfiet 1 passiġġier, â EUR modernizzazzjoni ta ‘faċilitajiet tal-passiġġieri (14 pjattaformi tal-passiġġieri u 4 stazzjonijiet), (Maltese)
    26 July 2022
    0 references
    Os trabalhos do projeto na linha ferroviária n.º 219, na secção Szczytno-EÅk, incluem: Obras de infraestruturas, incluindo a reabilitação da linha n.º 219 na secção do km 45.823 até ao km 156.950, ou seja, 111,127 km de comprimento (de acordo com o quilómetro existente), a extensão final prevista da secção reabilitada da linha 219 será de 111 069 km em resultado da reconstrução do sistema de vias na estação de EÅk; A estação funciona, incluindo a reconstrução da estação em Szczytno com a construção do parque de parque &Ride. As obras de infraestrutura incluem o restabelecimento dos parâmetros técnicos originais da linha com a adaptação dos elementos da infraestrutura às necessidades das pessoas com mobilidade reduzida. No âmbito do projeto, serão realizadas as seguintes obras de construção: substituição do pavimento de via em todo o comprimento da linha, substituição dos interruptores nas vias e das principais obras de construção de instalações de engenharia, incluindo a demolição e reconstrução de duas pontes, liquidação de 11 passagens ferroviárias, modernização de 89 passagens ferroviárias, incluindo a construção da categoria em 13 passagens, remoção de 1 paragem de passageiros, modernização das instalações de passageiros (14 plataformas de passageiros e 4 estações), (Portuguese)
    26 July 2022
    0 references
    Szczytno-EÅk-osuuden rautatielinjaa nro 219 koskevat hanketyöt sisältävät: Infrastruktuurityöt, mukaan lukien rataosuuden nro 219 kunnostaminen kilometristä 45 823 kilometriin 156 950 kilometriin eli 111,127 km (nykyisen kilometrin mukaan), kunnostetun rataosuuden suunniteltu lopullinen pituus linjalla 219 on 111 069 kilometriä EÅkin aseman ratajärjestelmän kunnostamisen seurauksena; Asema toimii, mukaan lukien Szczytnon aseman jälleenrakentaminen Park &Ride parkkipaikan rakentamisen kanssa. Infrastruktuuritöihin kuuluu radan alkuperäisten teknisten parametrien palauttaminen siten, että infrastruktuurielementit mukautetaan liikuntarajoitteisten henkilöiden tarpeisiin. Osana hanketta toteutetaan seuraavat rakennustyöt: radan jalkakäytävän korvaaminen koko linjan pituudella, vaihtaminen vaihteiden raiteille ja tärkein perus, rakennustyöt insinööripalveluissa, mukaan lukien 2 sillan purku ja jälleenrakentaminen, 11 rautatieristeyksen purkaminen, 89 rautatieristeysten nykyaikaistaminen, mukaan lukien luokan rakentaminen 13 risteykseen, yhden matkustajapysäkin poistaminen, matkustajatilojen nykyaikaistaminen (14 matkustajalaituria ja 4 asemaa), (Finnish)
    26 July 2022
    0 references
    Projekt Deluje na železniški progi št. 219 na odseku Szczytno-EÅk vključuje: Infrastrukturna dela, vključno s sanacijo proge št. 219 na odseku od km 45.823 do 156,950 km, tj. 111,127 km (glede na obstoječi kilometer), bo načrtovana končna dolžina saniranega odseka proge 219 111,69 km zaradi obnove tirnega sistema na postaji EÅk; Postaja deluje, vključno z obnovo postaje v Szczytno z gradnjo Park &Ride parkirišče. Infrastrukturna dela vključujejo obnovo prvotnih tehničnih parametrov proge s prilagoditvijo infrastrukturnih elementov potrebam oseb z omejeno mobilnostjo. V okviru projekta bodo izvedena naslednja gradbena dela: zamenjava pločnika proge na celotni dolžini proge, zamenjava kretnic v tirih in glavna osnovna gradbena dela na inženirskih objektih, vključno z rušenjem in obnovo 2 mostov, likvidacijo 11 železniških prehodov, posodobitev 89 železniških prehodov, vključno z gradnjo kategorije na 13 prehodih, odstranitev 1 potniških postankov, posodobitev potniških zmogljivosti (14 potniških ploščadi in 4 postaje), (Slovenian)
    26 July 2022
    0 references
    Projektové práce na železniční trati č. 219 na úseku Szczytno-EÅk zahrnují: Práce na infrastruktuře, včetně obnovy trati č. 219 v úseku od 45,823 do km 156,950, tj. 111,127 km (dle stávajícího kilometru), plánovaná konečná délka renovovaného úseku trati 219 bude 111 069 km v důsledku rekonstrukce kolejového systému žst. EÅk; Stanice funguje, včetně rekonstrukce stanice ve Szczytnu s výstavbou Park &Ride parkoviště. Práce na infrastruktuře zahrnují obnovu původních technických parametrů trati s přizpůsobením prvků infrastruktury potřebám osob se sníženou pohyblivostí. V rámci projektu budou provedeny tyto stavební práce: › výměna kolejových vozovek na celé délce trati, výměna výhybek na kolejích a hlavní základní práce na inženýrských zařízeních, včetně demolice a rekonstrukce 2 mostů, likvidace 11 železničních přejezdů, modernizace 89 železničních přejezdů, včetně výstavby kategorie na 13 přejezdech, odstranění 1 zastávek pro cestující, ›" modernizace zařízení pro cestující (14 nástupišť pro cestující a 4 stanice), (Czech)
    26 July 2022
    0 references
    Projekto darbai geležinkelio linijoje Nr. 219 ruože Szczytno-EÅk apima: Infrastruktūros darbai, įskaitant geležinkelio linijos Nr. 219 rekonstravimą atkarpoje nuo 45,823 km iki 156,950 km, t. y. 111,127 km ilgio (pagal esamą kilometrą), planuojamas galutinis rekonstruotos 219 linijos ruožo ilgis bus 111,069 km, kai bus rekonstruota Euko stoties bėgių sistema; Stoties darbai, įskaitant stoties Szczytno rekonstrukcija su parko & amp statybos;Ride automobilių stovėjimo aikštelė. Infrastruktūros darbai apima pradinių techninių parametrų, susijusių su infrastruktūros elementų pritaikymu riboto judumo asmenų poreikiams, atkūrimą. Įgyvendinant projektą bus atliekami šie statybos darbai: â EUR ¢ pakeisti bėgių kelio dangos per visą linijos ilgį, â EUR ¢ pakeisti iešmus bėgių kelio ir pagrindinių pagrindinių, â EUR ¢ statybos darbai inžinerinių įrenginių, įskaitant griovimo ir rekonstravimo 2 tiltų, â EUR ¢ likvidavimas 11 geležinkelio pervažų, â EUR ¢ modernizavimas 89 geležinkelio pervažų, įskaitant statybos kategorijos 13 pervažų, â EUR ¢ pašalinti 1 keleivių stotelės, â EUR ¢ modernizuoti keleivių įrenginių (14 keleivių peronų ir 4 stotys), (Lithuanian)
    26 July 2022
    0 references
    Projekta darbi uz dzelzceļa līnijas Nr. 219 Szczytno-EÅk posmā ietver: Infrastruktūras darbi, tai skaitā līnijas Nr. 219 atjaunošana posmā no 45,823 km līdz 156,950 km, t. i., 111,127 km garš (atbilstoši esošajam kilometram), 219. līnijas rehabilitētā posma plānotais galīgais garums būs 111,069 km pēc sliežu ceļa sistēmas rekonstrukcijas Eik stacijā; Stacijas darbi, tostarp stacijas rekonstrukcija Szczytno ar Park & amp būvniecību;Ride autostāvvieta. Infrastruktūras darbi ietver līnijas sākotnējo tehnisko parametru atjaunošanu ar infrastruktūras elementu pielāgošanu cilvēku ar ierobežotām pārvietošanās spējām vajadzībām. Projekta ietvaros tiks veikti šādi būvdarbi: â EUR" Nomaiņa sliežu ceļa seguma uz visu garumu līnijas, â EUR" Nomaiņa pārmiju sliedēm un galveno pamata, â EUR" celtniecības darbi uz inženiertehniskajām iekārtām, ieskaitot nojaukšanas un rekonstrukcijas 2 tiltu, â EUR" likvidācija 11 dzelzceļa krustojumi, â EUR" modernizācija 89 dzelzceļa krustojumu, ieskaitot būvniecību kategorijas par 13 krustojumiem, â EUR ¢ noņemšana 1 pasažieru pieturām, â EUR ¢ modernizācija pasažieru iekārtām (14 pasažieru platformas un 4 stacijas), (Latvian)
    26 July 2022
    0 references
    Строителните работи по железопътната линия № 219 по участъка Шчитно-Ек включват: Инфраструктурни работи, включително рехабилитация на линия № 219 в участъка от km 45,823 до km 156.950, т.е. 111,127 km дължина (според съществуващия километър), планираната крайна дължина на рехабилитирания участък от линия 219 ще бъде 111 069 км в резултат на реконструкцията на железопътната система на гара EÅk; Гарата работи, включително реконструкцията на гарата в Шчитно с изграждането на парк & амп;Ride паркинг. Инфраструктурните работи включват възстановяване на първоначалните технически параметри на линията с адаптиране на инфраструктурните елементи към нуждите на хората с намалена подвижност. Като част от проекта ще бъдат извършени следните строителни работи: подмяна на релсовите настилки по цялата дължина на линията, подмяна на стрелките в коловозите и основните основни, строителни работи на инженерни съоръжения, включително разрушаване и реконструкция на 2 моста, ликвидация на 11 железопътни прелеза, модернизация на 89 железопътни прелези, включително изграждане на категорията на 13 прелеза, премахване на 1 пътни спирки, модернизация на пътнически съоръжения (14 пътнически перони и 4 гари), (Bulgarian)
    26 July 2022
    0 references
    A 219. számú vasútvonalon a Szczytno-EÅk szakaszon végzett projekt a következőket foglalja magában: Infrastrukturális munkálatok, beleértve a 219. sz. vonal felújítását a 45,823 km-től az 156,950 km-ig terjedő szakaszon, azaz 111,1227 km hosszú (a meglévő kilométernek megfelelően), a 219. vonal rehabilitált szakaszának tervezett végső hossza 111 069 km lesz az EÅk állomáson lévő vágányrendszer felújítása következtében; Az állomás működik, beleértve a szczytnoi állomás felújítását a Park &Ride parkoló megépítésével. Az infrastrukturális munkálatok magukban foglalják a vonal eredeti műszaki paramétereinek helyreállítását az infrastruktúra elemeinek a csökkent mozgásképességű személyek igényeihez való hozzáigazításával. A projekt részeként a következő építési munkálatokra kerül sor: a vágányburkolat cseréje a vonal teljes hosszán, a sínen lévő kapcsolók cseréje és a fő alapépítési munkálatok, beleértve a 2 híd lebontását és újjáépítését, 11 vasúti kereszteződés felszámolása, 89 vasúti kereszteződés korszerűsítése, beleértve a kategória építését 13 kereszteződésen, 1 utasmegálló eltávolítása, â â â â â âEUR â â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â â EUR â EUR â EUR â EUR â â EUR â â EUR â â EUR â â â â â és 4 állomás, â EURÁllás, â EUR érésásásásésésásésésésásásà Gà Gà Gà Gà Gà Gà tsásásásásárégégégégégégégégégésésátégégek érésésésésésséséségérásásésátottá (Hungarian)
    26 July 2022
    0 references
    Tionscadal Oibríonn sé ar an líne iarnróid Uimh. 219 ar rannóg Szczytno-EÅk lena n-áirítear: Oibreacha bonneagair, lena n-áirítear athshlánú líne Uimh. 219 sa chuid ó km 45.823 go km 156.950, i.e. 111.127 km ar fhad (de réir an chiliméadair atá ann cheana), is é 111.069 km fad pleanáilte na coda athshlánaithe de líne 219 mar thoradh ar atógáil an chórais riain ag stáisiún EÅk; Oibríonn an stáisiún, lena n-áirítear atógáil an stáisiúin i Szczytno le tógáil an charrchlóis Pháirc & Taistil. Áirítear ar na hoibreacha bonneagair athchóiriú a dhéanamh ar bhunpharaiméadair theicniúla na líne le hoiriúnú na n-eilimintí bonneagair do riachtanais daoine a bhfuil a soghluaisteacht laghdaithe. Mar chuid den tionscadal, déanfar na hoibreacha tógála seo a leanas: â EUR ¢ athsholáthar pábhála rian ar an fad iomlán na líne, â EUR ¢ athsholáthair lasca sna rianta agus an príomh-bhunúsach, â EUR ¢ oibreacha tógála ar shaoráidí innealtóireachta, lena n-áirítear scartáil agus atógáil 2 droichid, â EUR ¢ leachtú 11 trasrianta iarnróid, â EUR ¢ nuachóiriú de 89 trasrianta iarnróid, lena n-áirítear tógáil an chatagóir ar 13 trasrianta, â EUR ¢ bhaint de 1 stadanna paisinéirí, â EUR ¢ nuachóiriú na n-áiseanna paisinéirí (14 ardán paisinéirí agus 4 stáisiúin), (Irish)
    26 July 2022
    0 references
    Projektarbeten på järnvägslinje nr 219 på sträckan Szczytno-EÅk omfattar: Infrastrukturarbeten, inklusive upprustning av linje nr 219 i sträckan från km 45.823 till km 156.950, dvs. 111,127 km lång (enligt den befintliga kilometern), kommer den planerade slutliga längden på den rehabiliterade sträckan av linje 219 att vara 111 069 km till följd av ombyggnaden av spårsystemet vid EÅk-stationen. Stationen fungerar, inklusive återuppbyggnaden av stationen i Szczytno med byggandet av Park &Ride parkeringsplats. Infrastrukturarbeten omfattar återställande av de ursprungliga tekniska parametrarna för linjen genom anpassning av infrastrukturelement till behoven hos personer med nedsatt rörlighet. Som en del av projektet kommer följande byggnadsarbeten att utföras: byte av spårbeläggning på hela linjens längd, utbyte av spårväxlar och de viktigaste grundläggande, â EUR ¢ byggnadsarbeten på tekniska anläggningar, inklusive rivning och återuppbyggnad av 2 broar, â EUR ¢ avveckling av 11 järnvägsövergångar, â EUR ¢ modernisering av 89 järnvägsövergångar, inklusive byggande av kategorin på 13 övergångar, â EUR ¢ avlägsnande av 1 passagerarstopp, â EUR ¢ modernisering av passagerarutrymmen (14 passagerarplattformar och 4 stationer), (Swedish)
    26 July 2022
    0 references
    Szczytno-EÅki lõigu raudteeliini nr 219 projekt hõlmab järgmist: Taristutööd, sealhulgas liini nr 219 taastamine teelõigul 45,823 kuni 156,950 km, st 111,127 km pikkusel lõigul (olemasoleva kilomeetri järgi), on EÅki jaama rööbasteesüsteemi rekonstrueerimise tulemusena liini 219 rehabiliteeritud lõigu kavandatud lõpppikkus 111,069 km; Jaam töötab, sealhulgas jaama rekonstrueerimine Szczytnos koos Park &Ride parkla ehitamisega. Infrastruktuuritööd hõlmavad liini algsete tehniliste parameetrite taastamist koos infrastruktuurielementide kohandamisega piiratud liikumisvõimega inimeste vajadustele. Projekti raames tehakse järgmised ehitustööd: rööbasteekatte asendamine kogu liini ulatuses, rööbasteede pöörmete asendamine ja peamised põhilised ehitustööd, sealhulgas kahe silla lammutamine ja rekonstrueerimine, 11 raudteeületuskoha likvideerimine, 89 raudteeületuskoha moderniseerimine, sealhulgas 13 ristmiku ehitamine, 1 reisijate peatuse eemaldamine, reisijate rajatiste moderniseerimine (14 reisiplatvormi ja 4 jaama), (Estonian)
    26 July 2022
    0 references

    Identifiers

    POPW.03.01.00-00-0009/17
    0 references