OPTIMISATION OF LOGISTICS IN THE PROCESS OF POWER SUPPLY (Q2075084): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): The following project has been carried out by the project: a new management method for the management of the LOGISTICS AND MOVIMENTARE *, individual *, INTRODUCENDO ATTREZZATURE/MEZZI based on the MODEL INDUSTRY 4.0, integrating them with SOSTONALI AVANZATI HOLDINGS., Adding English summary)
(‎Changed an Item)
Property / programme
 
Property / programme: Veneto - ERDF / rank
 
Normal rank

Revision as of 17:43, 24 March 2020

Project in Italy financed by DG Regio
Language Label Description Also known as
English
OPTIMISATION OF LOGISTICS IN THE PROCESS OF POWER SUPPLY
Project in Italy financed by DG Regio

    Statements

    0 references
    24,000.0 Euro
    0 references
    48,000.0 Euro
    0 references
    50.0 percent
    0 references
    5 June 2018
    0 references
    26 November 2018
    0 references
    1 April 2019
    0 references
    DISTILLERIE BONOLLO UMBERTO S.P.A.
    0 references
    0 references
    0 references

    45°14'1.46"N, 11°52'26.44"E
    0 references
    IL PROGETTO HA L'OBIETTIVO SPECIFICO DI APPLICARE UN NUOVO METODO DI GESTIONE DELLA LOGISTICA E DELLA MOVIMENTAZIONE *individuo*, INTRODUCENDO ATTREZZATURE/MEZZI ISPIRATI AL MODELLO INDUSTRIA 4.0, INTEGRANDOLI CON SOFTWARE GESTIONALI AVANZATI AZIENDALI. (Italian)
    0 references
    The following project has been carried out by the project: a new management method for the management of the LOGISTICS AND MOVIMENTARE *, individual *, INTRODUCENDO ATTREZZATURE/MEZZI based on the MODEL INDUSTRY 4.0, integrating them with SOSTONALI AVANZATI HOLDINGS. (English)
    0 references

    Identifiers

    B18H18001030009
    0 references