REPLACING HYDRAULIC PRESS PRESS WITH ELECTRICAL PRESS REVAMPS OF HIGH EFFICACY LED LIGHTING AND FTV SYSTEM (Q2074119): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): TO REDUCE CONSUMPTION IN THE MOULDING DEPARTMENT, THE REPLACEMENT OF A HYDRAULIC PRESS WITH AN ELECTRICAL PRESS OF THE SAME TONNAGE HAS BEEN IDENTIFIED. IN ORDER TO INCREASE THE ILLUMINATION, IT WAS DECIDED TO FULLY REPLACE THE LIGHTING OF THE PRODUCTION AREA BY INSTALLING LED LAMPS WHILE FOR THE CONTAINMENT OF THE ENERGY TAKEN FROM THE GRID AND THE RESULTING REDUCTION IN CO2 EMISSIONS THE INSTALLATION OF 67 KWP OF PV EQUIPMENT IS FORESEEN., Ad...)
(‎Changed an Item)
Property / programme
 
Property / programme: Veneto - ERDF / rank
 
Normal rank

Revision as of 17:30, 24 March 2020

Project in Italy financed by DG Regio
Language Label Description Also known as
English
REPLACING HYDRAULIC PRESS PRESS WITH ELECTRICAL PRESS REVAMPS OF HIGH EFFICACY LED LIGHTING AND FTV SYSTEM
Project in Italy financed by DG Regio

    Statements

    0 references
    39,857.67 Euro
    0 references
    79,715.34 Euro
    0 references
    50.0 percent
    0 references
    27 November 2017
    0 references
    4 October 2018
    0 references
    16 July 2018
    0 references
    TECNOPLAST S.R.L.
    0 references
    0 references
    0 references

    45°47'46.46"N, 11°45'30.20"E
    0 references
    PER RIDURRE I CONSUMI NEL REPARTO DI STAMPAGGIO SI E' INDIVIDUATA LA SOSTITUZIONE DI UNA PRESSA IDRAULICA CON UNA PRESSA ELETTRICA DEL MEDESIMO TONNELLAGGIO. PER AUMENTARE L'EFFICENZA DI ILLUMINAZIONE SI E' DECISO DI SOSTITUIRE COMPLETAMENTE L'ILLUMINAZIONE DELLA ZONA DI PRODUZIONE INSTALLANDO LAMPADE A LED MENTRE PER IL CONTENIMENTO DELL'ENERGIA PRELEVATA DALLA RETE E LA CONSEGUENTE RIDUZIONE DELLE EMISSIONI DI CO2 SI PREVEDE L'INSTALLAZIONE DI IMPIANTO FOTOVOLTAICO DA 67 KWP (Italian)
    0 references
    TO REDUCE CONSUMPTION IN THE MOULDING DEPARTMENT, THE REPLACEMENT OF A HYDRAULIC PRESS WITH AN ELECTRICAL PRESS OF THE SAME TONNAGE HAS BEEN IDENTIFIED. IN ORDER TO INCREASE THE ILLUMINATION, IT WAS DECIDED TO FULLY REPLACE THE LIGHTING OF THE PRODUCTION AREA BY INSTALLING LED LAMPS WHILE FOR THE CONTAINMENT OF THE ENERGY TAKEN FROM THE GRID AND THE RESULTING REDUCTION IN CO2 EMISSIONS THE INSTALLATION OF 67 KWP OF PV EQUIPMENT IS FORESEEN. (English)
    0 references

    Identifiers

    B92E17002360007
    0 references