DRYING AND BLOWING TUNNELS AND AIR FOR DRY-PACK (Q2072339): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): INSTALLATION OF A PASTEURISATION AND TRANSPORT BELT AND AIR BLOWING TUNNEL FOR DRY-PACK, Adding English summary)
(‎Changed an Item)
Property / programme
 
Property / programme: Valle d'Aosta - ERDF / rank
 
Normal rank

Revision as of 17:04, 24 March 2020

Project in Italy financed by DG Regio
Language Label Description Also known as
English
DRYING AND BLOWING TUNNELS AND AIR FOR DRY-PACK
Project in Italy financed by DG Regio

    Statements

    0 references
    28,040.0 Euro
    0 references
    56,080.0 Euro
    0 references
    50.0 percent
    0 references
    27 July 2018
    0 references
    25 September 2019
    0 references
    DOUCE VALLEE' DI VITTAZ PAOLA
    0 references

    45°44'55.64"N, 7°36'45.11"E
    0 references
    INSEDIAMENTO DI UN TUNNEL DI PASTORIZZAZIONE E NASTRO DI TRASPORTO E SOFFIAGGIO ARIA PER ASCIUGATURA DOYPACK (Italian)
    0 references
    INSTALLATION OF A PASTEURISATION AND TRANSPORT BELT AND AIR BLOWING TUNNEL FOR DRY-PACK (English)
    0 references

    Identifiers

    B51F18000260009
    0 references