126_NUREC_431ENERGY EFFICIENCY WORK OF THE CITY HALL AND CONSTRUCTION OF A MICRO-NETWORK BETWEEN BUILDINGS (Q2155116): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Created claim: summary (P836): THE PROJECT WILL CONNECT THE TWO BUILDINGS VIA A MICRO NETWORK. IN PARTICULAR, IT PROVIDES FOR THE DISTRIBUTION OF ELECTRICITY THROUGH A SINGLE POD, CONNECTED TO THE EXISTING RENEWABLE ENERGY PRODUCTION PLANT AND TO A BATTERY STORAGE SYSTEM. THE MICRO NETWORK WILL BE OPERATED BY A DIGITAL COMMUNICATION, SMART METERING, CONTROL AND FLOW MONITORING SYSTEM WHICH MAXIMISES THE CONTROL AND EFFICIENCY OF THE ENERGY SYSTEM., Adding English summary)
Property / summary
 
THE PROJECT WILL CONNECT THE TWO BUILDINGS VIA A MICRO NETWORK. IN PARTICULAR, IT PROVIDES FOR THE DISTRIBUTION OF ELECTRICITY THROUGH A SINGLE POD, CONNECTED TO THE EXISTING RENEWABLE ENERGY PRODUCTION PLANT AND TO A BATTERY STORAGE SYSTEM. THE MICRO NETWORK WILL BE OPERATED BY A DIGITAL COMMUNICATION, SMART METERING, CONTROL AND FLOW MONITORING SYSTEM WHICH MAXIMISES THE CONTROL AND EFFICIENCY OF THE ENERGY SYSTEM. (English)
Property / summary: THE PROJECT WILL CONNECT THE TWO BUILDINGS VIA A MICRO NETWORK. IN PARTICULAR, IT PROVIDES FOR THE DISTRIBUTION OF ELECTRICITY THROUGH A SINGLE POD, CONNECTED TO THE EXISTING RENEWABLE ENERGY PRODUCTION PLANT AND TO A BATTERY STORAGE SYSTEM. THE MICRO NETWORK WILL BE OPERATED BY A DIGITAL COMMUNICATION, SMART METERING, CONTROL AND FLOW MONITORING SYSTEM WHICH MAXIMISES THE CONTROL AND EFFICIENCY OF THE ENERGY SYSTEM. (English) / rank
 
Normal rank

Revision as of 17:02, 24 March 2020

Project in Italy financed by DG Regio
Language Label Description Also known as
English
126_NUREC_431ENERGY EFFICIENCY WORK OF THE CITY HALL AND CONSTRUCTION OF A MICRO-NETWORK BETWEEN BUILDINGS
Project in Italy financed by DG Regio

    Statements

    0 references
    23,032.67 Euro
    0 references
    46,065.35 Euro
    0 references
    50.0 percent
    0 references
    1 September 2017
    0 references
    30 November 2019
    0 references
    COMUNE DI NURECI
    0 references
    0 references
    0 references

    39°49'24.06"N, 8°58'25.79"E
    0 references
    IL PROGETTO PREVEDE LA CONNESSIONE DEI DUE EDIFICI ATTRAVERSO UNA MICRO RETE. IN PARTICOLARE SI PREVEDE LA DISTRIBUZIONE DELL'ENERGIA ELETTRICA ATTRAVERSO UN UNICO POD,CONNESSO ALL'IMPIANTO DI PRODUZIONE ENERGETICO A FONTE RINNOVABILE ESISTENTE E AD UN SISTEMA DI ACCUMULO A BATTERIE. LA MICRO RETE SARà GESTITA DA UN SISTEMA DI COMUNICAZIONE DIGITALE, DI MISURAZIONE INTELLIGENTE, DI CONTROLLO E MONITORAGGIO DEI FLUSSI CHE CONSENTE DI MASSIMIZZARE IL CONTROLLO E L'EFFICIENZA DEL SISTEMA ENERGETICO. (Italian)
    0 references
    THE PROJECT WILL CONNECT THE TWO BUILDINGS VIA A MICRO NETWORK. IN PARTICULAR, IT PROVIDES FOR THE DISTRIBUTION OF ELECTRICITY THROUGH A SINGLE POD, CONNECTED TO THE EXISTING RENEWABLE ENERGY PRODUCTION PLANT AND TO A BATTERY STORAGE SYSTEM. THE MICRO NETWORK WILL BE OPERATED BY A DIGITAL COMMUNICATION, SMART METERING, CONTROL AND FLOW MONITORING SYSTEM WHICH MAXIMISES THE CONTROL AND EFFICIENCY OF THE ENERGY SYSTEM. (English)
    0 references

    Identifiers